| Notes |
| Date |
Text |
| 2023-01-03 16:50:43 | PLEASE PROVIDE WRITTEN RESPONSES TO THE FOLLOWING: | | | -ENSURE THAT ALL FDC???S ARE ACCEPTABLE DISTANCE TO | | | FIRE HYDRANTS. | | | -UPDATE LANDSCAPING PLANS WITH THE MOST RECENT REVISION | | | OF UTILITIES. UTILITIES CURRENTLY SHOWN ON LANDSCAPING | | | PLANS APPEAR TO BE OLD LOCATIONS. ONCE COMPLETE, ENSURE | | | THAT LANDSCAPING AND UTILITIES ARE ADEQUATELY DISTANCED | | | FROM EACH OTHER. | | | -THERE ARE SEVERAL GATES SHOWN ON PLANS, BUT THREE ARE | | | SHOWN ON ARCHITECTURAL PLANS AND TWO SHOWN ON OTHER | | | PLAN SETS. PLEASE ENSURE ALL PLAN SETS HAVE THE SAME | | | GATES SHOWN AND INDICATE IF THEY ARE EXISTING OR | | | PROPOSED. UTILITIES PERSONNEL NEEDS ACCESS FOR | | | MAINTENANCE, METER READING, EMERGENCIES, AND | | | INSPECTIONS. INDICATE PROPOSED DAYS AND TIMES THAT | | | GATES WOULD BE CLOSED AND IF THAT WOULD IMPEDE ACCESS | | | TO WPB UTILITIES PERSONNEL TO ANY AREAS WITH CITY | | | UTILITY INFRASTRUCTURE. | | | RESPECTFULLY, | | | MARK HURLEY [email protected] |
| |
Print |
|