Plan Review Notes
Plan Review Notes For Project Z22110009
Project Number Z22110009
Review Stop TRAFFIC
Sequence Number 1
Notes
Date Text
2022-12-16 18:08:30TRAFFIC COMMENTS
 1) PROVIDE AN UPDATED TRAFFIC STUDY, AS IT IS BASED ON
 OLD TRAFFIC COUNTS, ASSUMPTIONS AND METHODOLOGIES.
 PLEASE PERFORM A NEW SET OF TRAFFIC COUNTS, AND PROVIDE
 A DETAILED ELABORATION ON THE TRIP GENERATION
 CALCULATION
 2) INCLUDE THE INTERSECTIONS OF DREHER TRAIL N WITH
 SUMMIT AND SOUTHERN BLVD IN THE ANALYSIS
 3) PROVIDE AN UPDATED PARKING STUDY. ACTUAL DATA SHOULD
 BE COLLECTED IN ORDER TO CORROBORATE THE THEORETICAL
 FORMULAS. TYPICAL DAILY/WEEKEND USAGE AND AT LEAST ONE
 SPECIAL EVENT SHOULD BE ACCOUNTED FOR
 4) BOTH THE TRAFFIC IMPACT STATEMENT AND PARKING DEMAND
 STUDY NEED TO CONSIDER THE MULTI-PHASE APPROACH OF THE
 PROPOSED DEVELOPMENT AND PROVIDE NARRATIVE EXPLAINING
 AND ILLUSTRATING TRAFFIC IMPACTS, CIRCULATION, PARKING
 AND MITIGATION MEASUREMENTS FOR EACH PHASE
 5) PROVIDE A CRASH ANALYSIS ALONG THE MAIN ACCESS
 DRIVEWAYS AND IDENTIFY MITIGATION MEASUREMENTS. THE S4
 DATABASE SHOWED 4 INCIDENTS IN THE PAST 2 YEARS. CITY
 WAS ALSO CONTACTED IN 2020 PERTAINING IMPROVEMENTS BY
 THE SHARP TURN ALONG N DREHER TRAIL JUST WEST OF THE
 SCIENCE CENTER
 6) PROVIDE COUNTY TPS LETTER
 7) DEPENDING ON THE OUTCOME OF THE TRAFFIC ANALYSIS,
 TRANSPORTATION DEMAND MANAGEMENT (TDM) MEASURES MAY BE
 ENCOURAGED
  
 SITE COMMENTS
 8) PROVIDE A TRANSPORTATION SPECIFIC SITE PLAN FOR THE
 GROUND FLOOR. SHOWCASING TRANSPORTATION RELATED
 FEATURES (E.G. ROADWAY WIDTHS, DRIVING AISLES, PARKING
 STALLS, SIDEWALK, CURB, GUTTER, DRIVEWAY, GATES,
 CROSSWALKS, VISIBILITY TRIANGLE, CORNER & DRIVEWAY
 SEPARATION DISTANCES, SLOPES, ETC.) PROPERLY LABELED
 AND DIMENSIONED. THE SITE PLAN SHOULD BE NAMED T-1.0
 9) IN THE T-1.0 SITE PLAN, PLEASE SHOWCASE BASIC CURB
 DETAILS (E.G. DRIVEWAY, CURB CUTS, PAVEMENT MARKINGS,
 PARKING STALLS, ETC.) ON THE OPPOSITE SIDE OF THE ROADS
 SURROUNDING THE PROPOSED DEVELOPMENT
 10) PROVIDE A SIGNAGE AND PAVEMENT MARKING PLAN.
 INCLUSIVE OF ALL FEATURES WITHIN THE PROPOSED
 DEVELOPMENT AND ALONG ALL ROADS FRONTING THE SITE. SUCH
 PLAN IS PART OF THE TRANSPORTATION REVIEW AND SHOULD BE
 NAMED ACCORDINGLY (E.G. T-1.1 OR T-2.0)
 11) PROVIDE AUTOTURN ANALYSIS FOR GARBAGE TRUCK AND/OR
 SERVICE VEHICLES DRIVING IN AND OUT OF THE PROPOSED
 DEVELOPMENT WITH VEHICLE DYNAMIC ENVELOPES AND WHEEL
 PATHS CLEARLY DISTINCT AND DEFINED IN DIFFERENT COLORS.
 PROVIDE THE ANALYSIS IN A SEPARATE SHEET. SUCH PLAN(S)
 CONTAINING THE ANALYSIS ARE PART OF THE TRANSPORTATION
 REVIEW AND SHOULD BE NAMED ACCORDINGLY (E.G. T1.2,
 T-3.0)
 12) PROVIDE A PARKING TABLE SHOWCASING THE NUMBER OF
 REQUIRED AND PROVIDED PARKING SPACES, INCLUSIVE OF ADA
 AND BICYCLE ONES
 13) IN THE PAVEMENT, MARKING & SIGN PLAN, PROVIDE A
 TABLE SHOWCASING THE NUMBER OF EXISTING AND PROPOSED
 ON-STREET PARKING STALLS. PROVIDE THE NUMBER OF METERED
 STALLS THAT ARE BEING REMOVED OR RELOCATED, IF ANY
 14) ARE THERE ANY GATES PROPOSED? IF SO, CLEARLY
 SHOWCASE THE REQUIRED 20 FEET SETBACK DISTANCE FROM THE
 BACK OF THE SIDEWALK
 15) IS VALET SERVICE PROPOSED? IF SO, PROVIDE A
 THOROUGH OPERATIONAL ANALYSIS. DETAILS OF THE ANALYSIS
 SHOULD BE DISCUSSED DURING THE METHODOLOGY MEETING
 16) ARE THERE ANY BUS STOPS BEING IMPACTED?
 17) IS THE PROPOSED DEVELOPMENT IMPACTING AN EXISTING
 BICYCLE FACILITY?
 18) PROVIDE A CONSTRUCTION MANAGEMENT PLAN. PLEASE
 REFER TO CITY CODE 86-246 FOR DETAILS.
  
 VALERIO ORICCHIO
 CITY TRANSPORTATION ENGINEER
 561-494-1092
 [email protected]
  