| 2022-11-28 10:51:13 | 1. SURVEY NEEDS TO BE SIGNED/SEALED. |
| | 2. PROVIDE COPY OF TITLE REPORT. |
| | 3. LAYOUT OF WATER/SEWER WILL REQUIRE FURTHER REVIEW. |
| | 4. SHOW PROPOSED UTILITIES ON LANDSCAPE PLANS AS IT |
| | APPEARS THERE ARE CONFLICTS. |
| | 5. CCTV MAY NEED BE TO EASTERLY MANHOLE AT POINT OF |
| | ROAD CURVATURE. UTILITIES TO CONFIRM AFTER REVIEW. |
| | |
| | ADDITIONAL COMMENTS FROM SUZANNE BERGLUND, ENGINEERING |
| | MANAGER: |
| | |
| | ADDRESS NOW: |
| | 1) PROVIDE WRITTEN APPROVAL FROM PARKS AND RECREATION |
| | ON THE LOCATION OF THE PROPOSED RESTROOM FACILITY. |
| | 2) RELOCATE THE METER SERVICING THE RESTROOM FACILITY |
| | OUTSIDE OF THE LEASE BOUNDARY. |
| | 3) THE CITY WILL NOT ASSUME RESPONSIBILITY OF THE |
| | MAINTENANCE OF THE SAND/OIL SEPARATOR. CONFIRM THIS |
| | WILL BE MAINTAINED BY THE SCIENCE CENTER. |
| | 4) SHOW WHAT THE EXISTING WATER METERS ARE SERVING AND |
| | WHERE THE EXISTING WATER METERS SHOWN ON THE PLANS TIE |
| | INTO THE EXISTING WATER MAIN. |
| | 5) PROVIDE FFE OF THE PROPOSED RESTROOM FACILITY AND |
| | CONFIRM WHAT RAMPS WOULD BE NEEDED FOR ADA ACCESS TO |
| | PROPOSED RESTROOM FACILITY. THE DESIGN OF THE RAMP AS |
| | SHOWN WILL NOT BE ACCEPTABLE. |
| | |
| | ADDRESS PRIOR TO ENGINEERING PERMIT |
| | 6) PLEASE COORDINATE WITH DON GUSTAFSON, |
| | [email protected] ON SPECIFICATIONS FOR THE RESTROOM |
| | PAD AND FINAL LOCATIONS OF THE POINT OF SERVICE TO THE |
| | PROPOSED RESTROOM FACILITY |
| | |
| |