Plan Review Notes
Plan Review Notes For Project Z22100020
Project Number Z22100020
Review Stop TRAFFIC
Sequence Number 3
Notes
Date Text
2023-03-15 10:50:40TRAFFIC COMMENTS
 1) SATISFIED. A METHODOLOGY MEETING SHOULD HAVE BEEN
 SCHEDULED. PLEASE DO SO.
 2) SATISFIED. PROVIDE AN UPDATED TRAFFIC STUDY BASED ON
 MORE RECENT OR EXISTING COUNTS, AS THE 2018 COUNTS ARE
 OUTDATED, AS RECOMMENDED IN THE ANALYSIS AS WELL
 3) SATISFIED. AN AERIAL SATELLITE MAP SHOWCASING
 PROPOSED DEVELOPMENT WITH RESPECT TO NEIGHBORING AREA
 SHOULD BE PROVIDED IN THE TRAFFIC STUDY
 4) SATISFIED. SHOULD TABLE 1 THROUGH 3 MAIN CAPTIONS BE
 TOTAL MAXIMUM DRI OR MAXIMUM VESTED TRIP GENERATION?
 5) SATISFIED. BELOW EACH TABLE PLEASE PROVIDE
 REFERENCES FOR EACH PARAMETER (I.E. RATE/EQUATION,
 INTERNALIZATION AND PASS-BY PERCENTAGES)
 6) SATISFIED. PROVIDE TRIP GENERATION CALCULATION
 TABLE(S) SPECIFIC TO THE PROPOSED DEVELOPMENT (I.E.
 ONLY TRIPS GENERATED BY THE PROPOSED DEVELOPMENT).
 TABLE 7-9 SHOW AGGREGATE OF EXISTING/APPROVED AND
 CURRENTLY PROPOSED, MAIN CAPTION SHOULD BE CORRECTED
 ACCORDINGLY (E.G. APPROVED/BUILT PLUS PROPOSED
 DEVELOPMENTS)
 7) SATISFIED. TABLE 10 NEEDS TO BE CORRECTED, AS VESTED
 DEVELOPMENT SHOULD REFER TO THE TOTAL MAXIMUM DRI,
 WHILE PROPOSED DEVELOPMENT SHOULD REFER TO
 EXISTING/APPROVED AND CURRENTLY PROPOSED. PLEASE
 CORRECT
 8) SATISFIED. IN TABLE 10. DO DRIVEWAY TRIPS REFER TO
 TOTAL TRIPS MINUS INTERNALIZATION? (I.E. PASS-BY TRIPS
 ARE NOT DEDUCTED). IF SO, PLEASE INSERT A FOOTNOTE
 SPECIFYING THAT.
 9) SATISFIED. SYNCHRO OUTPUTS AND LOS SUMMARY TABLES
 SHOULD INCLUDE THE FOLLOWING SCENARIOS: EXISTING,
 FUTURE NO-BUILD AND FUTURE BUILD XXX (INSERT BUILD-OUT
 YEAR AND APPLY GROWTH FACTORS ACCORDINGLY). RESULTS FOR
 EACH SCENARIO SHOULD BE SUMMARIZED AND COMPARED IN A
 TABLE. CURRENT SYNCHRO OUTPUTS INDICATE 2022 BUILD-OUT
 YEAR, IS THAT EXISTING OR AN OUTDATED BUILD-OUT
 ANALYSIS?
 10) SATISFIED. PROVIDE MORE DETAILS PERTAINING THE
 CENTREPARK DRI EXTENT AND TRIP ALLOCATION.
 SPECIFICALLY: MAP SHOWCASING THE EXTENT OF THE DRI AND
 EACH OF THE SITES; A COMPREHENSIVE SPREADSHEET/TABLE
 SHOWCASING MAXIMUM ALLOWED SF/ROOMS/DU ALLOCATION FOR
 LAND-USE TYPE VERSUS EXISTING-BUILT,
 APPROVED-IN-CONSTRUCTION, PLANNED-PROPOSED DEVELOPMENTS
 AND LEFT OVER BALANCES, FOR EACH SITES AND OVERALL
 11) SATISFIED. THE TPS LETTER WAS ISSUED WITH AN
 ANTICIPATED BUILD-OUT YEAR IN 2024, WHILE THE TRAFFIC
 STUDY ASSUMES BUILD-OUT IN 2026. PLEASE EXPLAIN AND, IF
 NEEDED, REVISE THE TRAFFIC STUDY OR PROVIDE AN UPDATED
 TPS LETTER. PROVIDE THE UPDATED TPS LETTER, ONCE
 RECEIVED
 12) SATISFIED. PROVIDE EXPLANATION OR HISTORICAL
 REFERENCE WITH RESPECT TO THE CHANGE IN MAXIMUM PARCEL
 AND DRI OVERALL ALLOCATIONS, AS SHOWN IN EXHIBIT B.
 WHAT METHODOLOGY OR REASONING WAS APPLIED TO
 REDUCE/INCREASE ORIGINAL DRI ALLOCATIONS?
 13) SATISFIED. THE ORIGINAL INTERNALIZATION CALCULATION
 TABLE IS DATED 2005. BECAUSE OF THE CHANGE IN OVERALL
 DRI ALLOCATION, LAND USE TYPE, AND THE USE OF THE
 LATEST ITE TRIP GENERATION RATES IN THE PROPOSED
 DEVELOPMENT TRAFFIC STUDY, IT WOULD BE LOGICAL AND
 NECESSARY TO RE-CALCULATE INTERNALIZATION PARAMETERS
 AND RATES BASED ON LATEST DRI ALLOCATION AND ITE/COUNTY
 RATES AND METHODOLOGY. PLEASE DO SO AND PROVIDE THE
 WORKING SPREADSHEET AS PART OF NEXT RESUBMISSION
 SITE COMMENTS
 14) SATISFIED. PROVIDE A HORIZONTAL CONTROL SITE PLAN
 FOR THE GROUND FLOOR. SHOWCASING TRANSPORTATION RELATED
 FEATURES (E.G. ROADWAY WIDTHS, DRIVING AISLES, PARKING
 STALLS, SIDEWALK, CURB, GUTTER, DRIVEWAY, GATES,
 CROSSWALKS, VISIBILITY TRIANGLE, CORNER & DRIVEWAY
 SEPARATION DISTANCES, SLOPES, ETC.) PROPERLY LABELED
 AND DIMENSIONED. PROVIDE DETAILS OF THE SIDEWALK AREA
 ALONG S AUSTRALIAN AVE AND OLD OKEECHOBEE RD FRONTING
 THE PROPOSED DEVELOPMENT
 15) SATISFIED. IN THE HORIZONTAL CONTROL SITE PLAN,
 PLEASE SHOWCASE BASIC CURB DETAILS (E.G. DRIVEWAY, CURB
 CUTS, PAVEMENT MARKINGS, PARKING STALLS, ETC.) ON THE
 OPPOSITE SIDE OF THE ROADS SURROUNDING THE PROPOSED
 DEVELOPMENT. THERE ARE MISSING FEATURES ALONG OLD
 OKEECHOBEE ROAD, PLEASE PROVIDE SIDEWALK AND TRAVEL
 LANE DETAILS ALONG CENTREPARK DR N TILL THE
 INTERSECTION WITH CENTREPARK DR E.
 16) SATISFIED. PROVIDE A SIGNAGE AND PAVEMENT MARKING
 PLAN. INCLUSIVE OF ALL FEATURES WITHIN THE PROPOSED
 DEVELOPMENT AND ALONG ALL ROADS FRONTING THE SITE. SUCH
 SITE PLAN CAN BE SEPARATE OR INTEGRATED IN THE
 HORIZONTAL CONTROL ONE. SEVERAL MISSING ITEMS, PLEASE
 REVISE AND COMPLETE
 17) SATISFIED. ALL TRANSPORTATION RELATED ITEMS (I.E.
 PARKING STALL, DRIVE AISLES, RAMP) WITHIN THE GARAGE
 PLANS NEED TO BE PROPERLY LABELED AND DIMENSIONED (I.E.
 LENGTH, WIDTH, SLOPE PERCENTAGES)
 18) SATISFIED. PER CITY CODE SEC94-111(C)(1): ???IN
 THOSE CASES WHERE THE SIDE OF ANY STALL IS ADJACENT TO
 A WALL, FENCE, BUILDING, OR OTHER PHYSICAL OBSTRUCTION,
 THE STALL WIDTHS SHALL BE INCREASED BY A MINIMUM OF ONE
 FOOT. WHERE THERE IS AN OBSTRUCTION ON BOTH SIDES OF
 THE STALL, THE STALL WIDTHS SHALL BE INCREASED BY A
 MINIMUM OF TWO FEET.??? PLEASE APPLY AND SHOWCASE SUCH
 REQUIREMENT IN THE GARAGE PLANS
 19) SATISFIED. TURN-AROUND SPACES SHOULD BE PROVIDED,
 AND CLEARLY MARKED AS SUCH AT EACH DEAD-END(S) OF THE
 GARAGE. PLEASE REVISE THE SITE PLANS ACCORDINGLY.
 20) SATISFIED. PROPOSED LOADING ZONE(S) ARE NOT CLEARLY
 DEPICTED NOR DIMENSIONED IN THE ARCHITECTURAL PLANS.
 PLEASE REVISE AND PROVIDE CODE REFERENCE TO MINIMUM
 REQUIRED AND PROVIDED DIMENSIONS.
 21) SATISFIED. PROVIDE AUTOTURN ANALYSIS FOR GARBAGE
 TRUCK AND/OR SERVICE VEHICLES DRIVING IN AND OUT OF THE
 PROPOSED DEVELOPMENT WITH VEHICLE DYNAMIC ENVELOPES AND
 WHEEL PATHS CLEARLY DISTINCT AND DEFINED IN DIFFERENT
 COLORS
 22) SATISFIED. PROVIDE ENGINEERING REFERENCE AND SPECS
 SHEETS FOR EACH OF THE PROPOSED TRANSPORTATION FEATURES
 (E.G. CURB, RAMP, GATE, SIGNAGE, PAVEMENT MARKING,
 SIGNAL, ETC.)
 23) SATISFIED. IDENTIFY AND DESIGNATE AN EASILY
 ACCESSIBLE MICRO-MOBILITY STATION AREA (MINIMUM 8 X 20
 FEET) AND PROVIDE BASIC ELECTRIFICATION READINESS WITH
 THE FOLLOWING SPECS: A CONDUIT (2-INCH SCHEDULE 40 PVC)
 TO THE POWER SOURCE WITH AN ELECTRICAL PULL BOX (240V /
 10,000W CIRCUIT)
 24) SATISFIED. PROVIDE A PARKING TABLE SHOWCASING THE
 NUMBER OF REQUIRED AND PROVIDED PARKING SPACES,
 INCLUSIVE OF ADA AND BICYCLE ONES
 25) SATISFIED. ARE THERE ANY GATES PROPOSED? IF SO,
 CLEARLY SHOWCASE THE REQUIRED 20 FEET SETBACK DISTANCE
 FROM THE BACK OF THE SIDEWALK OR CURB
 26) SATISFIED. IS VALET SERVICE PROPOSED? IF SO,
 PROVIDE A THOROUGH OPERATIONAL ANALYSIS AND/OR PARKING
 MANAGEMENT PLAN
 27) SATISFIED. ARE THERE ANY BUS STOPS BEING IMPACTED?
 28) SATISFIED. IS THE PROPOSED DEVELOPMENT IMPACTING
 ANY EXISTING OR PLANNED BICYCLE FACILITY?
 29) TO BE SATISFIED AT BUILDING PERMIT. PROVIDE A
 CONSTRUCTION MANAGEMENT PLAN. PLEASE REFER TO CITY CODE
 86-246 FOR DETAILS
  
 VALERIO ORICCHIO
 CITY TRANSPORTATION ENGINEER
 561-494-1092
 [email protected]
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved