2023-05-08 10:37:36THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE
 4/17/2023 SUBMITTAL. PREVIOUSLY SATISFIED COMMENTS ARE
 DELETED.
  
 6. [SATISFIED] IF DUMPSTER DRIVEWAY CAN REMAIN, REPLACE
 TYPE F CURB AND GUTTER WITH DROP CURB ACROSS THE
 DRIVEWAY. ADDITIONAL COMMENT: SHOW THE PROPOSED
 IMPROVEMENTS/CHANGES WITHIN THE PARK PARCEL TO
 ACCOMMODATE THIS PROJECT.
  
 7. [SATISFIED] SHOW AND LABEL UTILITIES (SIZE,
 MATERIAL) ON THE ENGINEERING PLANS. SHOW ON THE GRADING
 AND DRAINAGE PLAN.
  
 8. [SATISFIED] SHOW THE TREES AND THE EXISTING CATCH
 BASIN BETWEEN THE PARK'S DRIVEWAY AND THE NORTH
 PROPERTY LINE OF THE SITE.
  
 9. [SATISFIED] THERE APPEAR TO BE A UTILITY GATE VALVE
 BOX AND A LIGHT POLE IN THE SIDEWALK THAT ARE NOT SHOWN
 ON THE SURVEY. ADDITIONAL COMMENT: VALVE IS NOT SHOWN.
  
 NEW COMMENTS (2/3/2023 SUBMITTAL)
  
 12. [NOT SATISFIED] REVIEW THE PLACEMENT OF THE TRENCH
 DRAIN ACROSS THE DRIVEWAY AT THE BACK OF SIDEWALK. IT
 IS SHOWN AT A HIGH POINT OF THE DRIVEWAY CROSS SECTION.
 ADDITIONAL COMMENT: THE FLOODING WILL NOT GET HIGHER
 THAN ELEVATION 15.0 FT NAVD BEFORE OVERFLOWING TO
 ADJACENT PROPERTIES. IF WATER IS FLOWING OUT OF THE
 TRENCH DRAIN, THEN THE BUILDING WILL LIKELY BE FLOODED
 BECAUSE THE FFE IS LOWER THAN THE ELEVATION OF THE
 TRENCH DRAIN.
  
 13. [SATISFIED] DRIVEWAY APRON TO BE CONCRETE WITHIN
 THE S. DIXIE RIGHT OF WAY UNLESS FDOT APPROVES ASPHALT.
  
 14. [SATISFIED] SHOW THE REPLACEMENT OF THE EXISTING
 DRIVEWAYS AND DROP CURB WITH TYPE F CURB AND GUTTER AND
 CONCRETE SIDEWALK AT MAX. 2% CROSS SLOPE.
  
 15. [SATISFIED ??? EASEMENT MAY BE NEEDED FOR THE LIGHT
 POLE UNLESS THE POLE AND HAND HOLES CAN BE LOCATED
 WITHIN THE 10-FT EASEMENT.] SHOW WHERE THE LIGHT POLE
 NORTH OF THE EXISTING DRIVEWAY (AND WITHIN THE PROPOSED
 DRIVEWAY) WILL BE LOCATED. TAKE INTO CONSIDERATION THE
 TREE CANOPY.
  
 16. [SATISFIED] CONSTRUCTING THE DRIVEWAY AND TRENCHING
 THE WATER SERVICE LINE SO CLOSE TO THE EXISTING TREES
 MAY LEAVE THE TREES UNSTABLE AFTER THE ROOTS ARE
 PRUNED..
  
 17. [SATISFIED] REVIEW STRIPING CALLOUTS IN THE PARKING
 LOT, IN PARTICULAR THE STOP BAR AND DOUBLE YELLOW
 STRIPING.
  
 18. [SATISFIED ??? EASEMENT MAY BE NEEDED FOR THE
 PORTION OF SIDEWALK OUTSIDE OF THE 10-FT UTILITY
 EASEMENT.] SECTION A - SHOW THE PROPOSED BACK OF WALK
 AT THE EXISTING GRADE AND CREATE A DRIVEWAY TRANSITION
 BETWEEN THE FRONT OF SIDEWALK AND THE BACK OF VALLEY
 GUTTER. SEE FDOT STANDARD PLAN #522-003.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120 (O)
 [email protected]
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved