Plan Review Notes
Plan Review Notes For Project Z22100019
Project Number Z22100019
Review Stop STORM
Sequence Number 1
Notes
Date Text
2022-11-13 09:05:17THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL
 DETAILS, DESIGN CALCULATIONS AND THE POLLUTION
 PREVENTION PLAN WILL BE REVIEWED AS PART OF THE
 ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT
 APPLICATION PROCESSES.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE
 PLAN APPROVAL:
  
 1. THE CITY'S OFFICIAL VERTICAL DATUM PER CITY CODE IS
 NGVD1929. THE NAVD1988 VERTICAL DATUM MAY BE USED IF
 THE CONVERSION EQUATION BETWEEN NAVD1988 AND NGVD1929
 IS PROVIDED. PROVIDE THE CONVERSION EQUATION ON THE
 SURVEY AND ENGINEERING PLAN.
  
 2. S. DIXIE HIGHWAY IS MAINTAINED BY FDOT. ALL
 IMPROVEMENTS WITHIN THE R/W ARE TO BE APPROVED BY FDOT.
  
 3. REMOVE THE PROPOSED CURB CROSSING THE SIDEWALK ON
 THE SOUTH SIDE OF THE DRIVEWAY APRON.
  
 4. PROVIDE A CROSS SECTION AT THE DRIVEWAY FROM THE
 CENTERLINE OF S. DIXIE TO FIVE FEET INTO THE EXISTING
 PARKING LOT. SHOW BREAKPOINTS, R/W, GUTTERS, WIDTH OF
 ADA PORTION OF SIDEWALK, GENERAL SURFACE SLOPES.
  
 5. PROVIDE ARROWS ON THE CONCEPTUAL ENGINEERING PLAN
 SHOWING STOMWATER RUNOFF FLOW DIRECTION.
  
 6. IF DUMPSTER DRIVEWAY CAN REMAIN, REPLACE TYPE 'F'
 CURB AND GUTTER WITH DROP CURB ACROSS THE DRIVEWAY.
  
 7. SHOW AND LABEL UTILITIES (SIZE, MATERIAL) ON THE
 ENGINEERING PLANS.
  
 8. SHOW THE TREES AND THE EXISTING CATCH BASIN BETWEEN
 THE PARK'S DRIVEWAY AND THE NORTH PROPERTY LINE OF THE
 SITE.
  
 9. THERE APPEAR TO BE A UTILITY GATE VALVE BOX AND A
 LIGHT POLE IN THE SIDEWALK THAT ARE NOT SHOWN ON THE
 SURVEY.
  
 10. SHOW UTILITIES ON THE LANDSCAPE PLANS.
  
 11. SHOW WHEEL STOPS FOR THE PARKING SPACES FACING THE
 BUILDING.
  
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO
 ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL.
  
 1. DRAINAGE SYSTEM TO BE DESIGNED TO MEET SFWMD ERP
 CRITERIA. STORMWATER CALCULATIONS WILL BE REVIEWED WITH
 THE ENGINEERING PERMIT SUBMITTAL.
  
 2. PROVIDE COPY OF SFWMD ERP PERMIT BEFORE START OF
 CONSTRUCTION.
  
 3. PROVIDE EROSION AND SEDIMENT CONTROL PLAN WITH THE
 ENGINEERING PERMIT SUBMITTAL.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120 (O)
 [email protected]
  