| Plan Review Notes For Project Z22100019 |
| Project Number |
Z22100019 |
|
| Review Stop |
PU-CS |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2022-11-06 08:08:22 | PLEASE PROVIDE WRITTEN RESPONSES TO THE FOLLOWING: | | | -ON ENGINEERING PLANS, SHOW ALL EXISTING AND PROPOSED | | | METERED WATER SERVICES, SANITARY SEWER LATERALS, SEWER | | | CLEANOUTS, SANITARY SEWER MAINS, BACKFLOW ASSEMBLIES, | | | AND WATER MAINS ON OR NEAR THE PROPERTY. | | | -WILL THE SEPARATE EXISTING 560 S.F. SOUTHWEST BUILDING | | | ALSO BE PART OF THE RESTAURANT WHERE FOOD IS PREPARED | | | AND CUSTOMERS CAN DINE? IF NOT, WHAT WILL IT BE USED | | | FOR? | | | -SHOW ANY EXISTING OR PROPOSED GREASE TRAPS THAT ARE | | | LOCATED OUTSIDE OF BUILDING. | | | -HISTORIC PICTURES SHOW NO PARKING SIGNS AT DIXIE | | | SIDEWALK. | | | -HISTORIC PICTURES SHOW LIGHT POLE, UTILITY BOXES, AND | | | VALVE BOX NEAR SOUTH DRIVEWAY. SHOW AND LABEL ON PLANS. | | | -ADD WATER AND SEWER DEMAND CALCULATIONS TO ENGINEERING | | | PLAN. | | | -WILL ANY OF THE BUILDINGS HAVE FIRE SPRINKLERS? | | | RESPECTFULLY, | | | MARK HURLEY [email protected] |
| |
Print |
|