Plan Review Notes
Plan Review Notes For Project Z22100018
Project Number Z22100018
Review Stop STORM
Sequence Number 4
Notes
Date Text
2023-04-24 17:04:08CONDITIONS FOR SITE PLAN APPROVAL:
 1. PDG AND UTILITY PLANS SUBMITTED FOR ENGINEERRING
 PERMIT SHALL HAVE ALL UTILITY PIPES WITHIN THE R/W
 LABELED WITH SIZE AND MATERIAL. EXISTING PIPE INVERTS
 SHALL BE PROVIDED AT DRAINAGE AND SANITARY SEWER
 STRUCTURES.
  
 2. THE EOR WILL NEED TO JUSTIFY THE PIPE SIZE FOR ALL
 STORM PIPES LARGER THAN 15" AND CONNECTING TO THE
 CITY'S MS4. BASED ON THE CURRENT DESIGN, THIS WOULD
 APPLY TO THE PROPOSED 30" DIAMETER RCP PIPE BETWEEN
 CB-1 AND EX. STORM MH #8.
  
 3. PBAU WILL BE RESPONSIBLE TO MAINTAIN THE DRAIANGE
 SYSTEM PIPES AND STRUCTURES WITHIN THE PUBLIC R/W
 UPSTREAM OF THE CONTROL STRUCTURE CB-1. A MAINTENANCE
 AGREEMENT MAY NEED TO BE PROVIDED TO THE CITY.
  
  
 THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE
 3/24/2023 SUBMITTAL. PREVIOUSLY SATISFIED COMMENTS WERE
 REMOVED.
  
 1. [PARTIALLY SATISFIED] LABEL EXISTING UTILITIES (SIZE
 AND MATERIAL). ADDITIONAL COMMENTS - SEE CONDITIONAL
 APPROVAL NOTE #1 ABOVE.
  
 2. [PARTIALLY SATISFIED] PARKING STRIPING DETAIL (ON
 SHEET C3.1) DOES NOT MEET CITY CODE (SECTION 94-485).
 ADD'L COMMENT - DETAIL IS MISSING THE 4" X 12"
 CONNECTOR STRIPE AT THE ENDS OF THE PARALLEL STRIPES.
 SHOW CORRECT PARKING LOT STRIPING ON THE ENGINEERING
 PERMIT SUBMITTAL.
  
 3. [SATISFIED] SHOW COMPLETE REMOVAL OF STORM PIPE
 BETWEEN STORM MH#2 AND STORM MH #4. ADDITIONAL COMMENT:
 MEET WITH PUBLIC UTILITIES DURING AFTER SITE PLAN
 APPROVAL TO DETERMINE THE LIMITS OF THE STORM PIPE
 REMOVAL/ABANDONMENT DUE TO THE SANITARY SEWER CROSSING.
  
 4. [SATISFIED] REMOVE STORM MH #3 AND THE PIPE BETWEEN
 STORM MH #3 AND CURB INLET #4.
  
 6. [NOT SATISFIED] JUSTIFY THE PROPOSED STORM PIPE
 SIZES THAT WILL BE CONNECTING TO THE CITY'S STORM
 DRAINAGE SYSTEM WITH ENGINEERING PERMIT SUBMITTAL. SEE
 CONDITIONAL APPROVAL #2 ABOVE.
  
 7. [PARTIALLY SATISFIED] EXISTING DRAINAGE STRUCTURES
 TO BE CHECKED TO SEE IF THEY ARE LARGE ENOUGH FOR
 PROPOSED DRAINAGE PIPE CONNECTIONS. ADD'L COMMENT - EX.
 MH #8 SHOWS WEST PPE CHANGING FROM 10" TO 30". THE 30"
 PIPE TO BE VALIDATED PER COMMENT #6.
  
 9. [SATISFIED] FDOT SPECIAL TYPE "F" CURB AND GUTTER
 SHALL BE CONSTRUCTED ALONG S. OLIVE AVE.
  
 13. [SATISFIED] SECTION C-C:
  A. LABEL S. OLIVE R/W
  B. LABEL THE SPECIAL TYPE "F" CURB AND GUTTER
  C. LABEL THE HEADER CURB(?) ALONG THE EDGE OF THE
 PAVER SIDEWALK. NOTE THE HEADER CURB IS NOT SHOWN ON
 THE PGD PLAN.
  
 14. [SATISFIED] SECTION D-D:
  A. INDICATE SUPERPAVE ASPHALT WITHIN THE R/W.
  B. LABEL THE R/W (WALLINGFORD PLACE).
  C. MAINTENANCE AGREEMENT TO BE NEEDED FOR THE PAVER
 SIDEWALK.
  
 NEW COMMENTS (2/24/2023 SUBMITTAL)
 15. [SATISFIED] LIST VERTICAL DATUM REFERENCE AND
 CONVERSION EQUATION TO NGVD1929 ON EVERY SHEET WITH
 ELEVATION INFORMATION. INFORMATION IS MISSING ON SHEETS
 C4.2
  
 16. [SATISFIED] LABEL THE CONTROL STRUCTURE ON THE PGD
 PLAN. PROVIDE A DETAIL WITH THE ENGINEERING PERMIT
 SUBMITTAL. NOTE THE CITY DOES NOT ALLOW THE USE OF
 BLEEDERS WITH EXFILTRATION TRENCHES. ADD'L COMMENT: ADD
 THE WEIR ELEVATION TO THE PDG PLAN. PRB WILL BE NEEDED
 OVER THE WEST PIPE.
  
 17. [SATISFIED] INDICATE ON THE DEMOLITION PLAN IF THE
 STORM PIPE SOUTH OF CURB INLET #1 IS TO REMAIN OR BE
 REMOVED. PGD PLAN CALLS OUT 46 LF OF 24-INCH RCP.
  
 18. [SATISFIED] CURB RAMPS ARE TO BE BROUGHT UP TO
 CURRENT ADA STANDARDS IF THE ASPHALT ADJACENT TO THE
 CURB RAMP IS MODIFIED (INCLUDING MILLING AND
 RESURFACING). REVIEW THE CURB RAMPS ON OPPOSITE SIDES
 OF THE STREETS TO DETERMINE IF THE RAMPS CURRENTLY MEET
 ADA REQUIREMENTS. INDICATE ON SHEET C3.0, SITE
 GEOMETRY, MARKING AND SIGNAGE PLAN.
  
 19. [SATISFIED] SFWMD REQUIRES LONG-TERM MAINTENANCE
 CONTRACT BE IN PLACE FOR PERVIOUS PAVERS TO BE
 CONSIDERED PERVIOUS SURFACES IN THE STORMWATER
 MANAGEMENT ANALYSIS. ADD'L COMMENT - PERVIOUS PAVERS NO
 LONGER PROPOSED.
  
 20 [PARTIALLY SATISFIED] APPLICANT TO BE RESPONSIBLE
 FOR MAINTAINING DRAINAGE SYSTEM FROM PROPOSED CB #11 TO
 THE CONNECTION TO EXISTING MH #8, INCLUDING THE STORM
 PIPES BETWEEN PROPOSED CURB INLET #9 AND PROPOSED CURB
 INLET #7. ADD'L COMMENT - REMOVE "PRIVATE" FROM THE
 STORM PIPE LABELS FOR DRAINAGE PIPES WITHIN THE RIGHT
 OF WAY. PBAU WIL NEED TO ENTER INTO A MAINTENANCE
 AGREEMENT WITH THE CITY FOR PBAU TO BE RESPONSIBLE TO
 MAINTAIN THE STORM PIPE AND STRUCTURES WITHIN THE R/W.
 LIMITS OF MAINTENANCE TO BE INDICATED IN THE AGREEMENT.
 SEE SITE PLAN CONNDTION #3 ABOVE.
  
 21. [SATISFIED] THE SITE PLAN SHOWS A DROP OFF AREA
 SOUTH OF THE BUILDING IN THE CIRCLE DRIVE PULL UP.
 ADVISE IF THE SIDEWALK ADJACENT TO THE DROP OFF AREA IS
 TO BE FLUSH WITH THE PAVEMENT FOR ADA ACCESSIBILITY.
 REVISE SECTION B-B ACCORDINGLY.
  
 NEW COMMENTS (3/4/2023 SUBMITAL)
 22. S. DIXIE HWY IS MAINTAINED BY FDOT. ANY
 IMPROVEMENTS WITHIN THE R/W WILL NEED A PERMIT FROM
 FDOT.
  
 23. PROP. MH-3 IS MIISING THE INVERT ELEVATION FOR THE
 EXISTING WEST PIPE. SHOW ON THE ENGINEERING PERMIT
 SUBMTITAL.
  
 24. INCLUDE A DETAIL OF THE SPECIAL FDOT TYPE F CURB
 AND GUTTER ON THE ENGINEERING PLAN SUBMITTAL. CONTACT
 REVIEWER FOR INFORMATION.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120 (O)
 [email protected]
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved