2023-03-13 17:55:18THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE
 2/24/2023 SUBMITTAL:
  
 1. [PARTIALLY SATISFIED] LABEL EXISTING UTILITIES (SIZE
 AND MATERIAL).
  
 2. [NOT SATISFIED] PARKING STRIPING DETAIL (ON SHEET
 C3.1) DOES NOT MEET CITY CODE (SECTION 94-485).
  
 3. [NOT SATISFIED] SHOW COMPLETE REMOVAL OF STORM PIPE
 BETWEEN STORM MH#2 AND STORM MH #4. ADDITIONAL COMMENT:
 MEET WITH PUBLIC UTILITIES DURING AFTER SITE PLAN
 APPROVAL TO DETERMINE THE LIMITS OF THE STORM PIPE
 REMOVAL/ABANDONMENT DUE TO THE SANITARY SEWER CROSSING.
  
 4. [NOT SATISFIED] REMOVE STORM MH #3 AND THE PIPE
 BETWEEN STORM MH #3 AND CURB INLET #4.
  
 5. [SATISFIED] WHAT IS HAPPENING TO THE STORM PIPE
 BETWEEN CURB INLET #2 AND STORM MH #1 - TO BE REMOVED
 OR TO REMAIN?
  
 6. [NOT SATISFIED] JUSTIFY THE PROPOSED STORM PIPE
 SIZES THAT WILL BE CONNECTING TO THE CITY'S STORM
 DRAINAGE SYSTEM WITH ENGINEERING PERMIT SUBMITTAL.
  
 7. [NOT SATISFIED] EXISTING DRAINAGE STRUCTURES TO BE
 CHECKED TO SEE IF THEY ARE LARGE ENOUGH FOR PROPOSED
 DRAINAGE PIPE CONNECTIONS.
  
 8. [SATISFIED] WHERE WILL PROPOSED STORM MH #5 DRAIN
 TO? EXISTING STORM PIPE TO THE SOUTH IS SHOWN TO BE
 REMOVED.
  
 9. [NOT SATISFIED] FDOT SPECIAL TYPE "F" CURB AND
 GUTTER SHALL BE CONSTRUCTED ALONG S. OLIVE AVE.
  
 10. [SATISFIED] PROVIDE PROPOSED FINISHED FLOOR
 ELEVATION.
  
 11. [SATISFIED] REVIEW INVERTS OF SEWER AND STORM
 PIPES. THERE APPEARS TO BE A CONFLICT EAST OF PROPOSED
 CATCH BASIN #11.
  
 12. [SATISFIED] AVOID RUNNING THE STORM PIPE UNDER THE
 CIRCULAR LANDSCAPE AREA SOUTH OF THE BUILDING,
  
 13. [NOT SATISFIED] SECTION C-C:
  A. LABEL S. OLIVE R/W
  B. LABEL THE SPECIAL TYPE "F" CURB AND GUTTER
  C. LABEL THE HEADER CURB(?) ALONG THE EDGE OF THE
 PAVER SIDEWALK. NOTE THE HEADER CURB IS NOT SHOWN ON
 THE PGD PLAN.
  
 14. [NOT SATISFIED] SECTION D-D:
  A. INDICATE SUPERPAVE ASPHALT WITHIN THE R/W.
  B. LABEL THE R/W (WALLINGFORD PLACE).
  C. MAINTENANCE AGREEMENT TO BE NEEDED FOR THE PAVER
 SIDEWALK.
  
 NEW COMMENTS (2/24/2023 SUBMITTAL)
 15. LIST VERTICAL DATUM REFERENCE AND CONVERSION
 EQUATION TO NGVD1929 ON EVERY SHEET WITH ELEVATION
 INFORMATION. INFORMATION IS MISSING ON SHEETS C4.2
  
 16. LABEL THE CONTROL STRUCTURE ON THE PGD PLAN.
 PROVIDE A DETAIL WITH THE ENGINEERING PERMIT SUBMITTAL.
 NOTE THE CITY DOES NOT ALLOW THE USE OF BLEEDERS WITH
 EXFILTRATION TRENCHES.
  
 17. INDICATE ON THE DEMOLITION PLAN IF THE STORM PIPE
 SOUTH OF CURB INLET #1 IS TO REMAIN OR BE REMOVED. PGD
 PLAN CALLS OUT 46 LF OF 24-INCH RCP.
  
 18. CURB RAMPS ARE TO BE BROUGHT UP TO CURRENT ADA
 STANDARDS IF THE ASPHALT ADJACENT TO THE CURB RAMP IS
 MODIFIED (INCLUDING MILLING AND RESURFACING). REVIEW
 THE CURB RAMPS ON OPPOSITE SIDES OF THE STREETS TO
 DETERMINE IF THE RAMPS CURRENTLY MEET ADA REQUIREMENTS.
 INDICATE ON SHEET C3.0, SITE GEOMETRY, MARKING AND
 SIGNAGE PLAN.
  
 19. SFWMD REQUIRES LONG-TERM MAINTENANCE CONTRACT BE IN
 PLACE FOR PERVIOUS PAVERS TO BE CONSIDERED PERVIOUS
 SURFACES IN THE STORMWATER MANAGEMENT ANALYSIS.
  
 20 APPLICANT TO BE RESPONSIBLE FOR MAINTAINING DRAINAGE
 SYSTEM FROM PROPOSED CB #11 TO THE CONNECTION TO
 EXISTING MH #8, INCLUDING THE STORM PIPES BETWEEN
 PROPOSED CURB INLET #9 AND PROPOSED CURB INLET #7.
  
 21. THE SITE PLAN SHOWS A DROP OFF AREA SOUTH OF THE
 BUILDING IN THE CIRCLE DRIVE PULL UP. ADVISE IF THE
 SIDEWALK ADJACENT TO THE DROP OFF AREA IS TO BE FLUSH
 WITH THE PAVEMENT FOR ADA ACCESSIBILITY. REVISE SECTION
 B-B ACCORDINGLY.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120 (O)
 [email protected]
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved