| Plan Review Notes For Project Z22100018 |
| Project Number |
Z22100018 |
|
| Review Stop |
PU-CS |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2023-01-04 16:29:51 | PLEASE PROVIDE WRITTEN RESPONSES TO THE FOLLOWING: | | | -AT FORMAL ENGINEERING SUBMITTAL: SPELL OUT PUE OR ADD | | | TO ABBREVIATION LIST, CHECK INVERTS OF PROPOSED | | | SANITARY MANHOLE 2, REMOVE PALM BEACH COUNTY UTILITY | | | STANDARD DETAILS AND REPLACE WITH WEST PALM BEACH | | | UTILITIES STANDARD DETAILS, AND LOOK BACK AT REVIEW | | | COMMENT NUMBER 2 AS IT DID NOT SEEM RESOLVED. | | | -CITY SANITARY SEWER LATERALS ARE TYPICALLY MINIMUM 6 | | | INCH SIZE IN OUR SERVICE AREA. | | | -SANITARY SEWER DESIGN MAY NEED TO BE REVISED AT FORMAL | | | ENGINEERING SUBMITTAL PER WPB STANDARD DETAIL GS3 NOTE | | | 2. | | | -FOOTPRINT OF ABOVE-GROUND METERED WATER SERVICE MAY | | | STILL BE BIGGER THAN DEPICTED. | | | -REMINDER TO FOLLOWUP ON THIS: 19. SHOW AND LABEL THE | | | RELOCATED POLES AND OVERHEAD UTILITIES. ALSO SHOW ANY | | | TRANSFORMER PADS. RESPONSE: AWAITING INFORMATION FROM | | | FPL TO PROVIDE A SCHEMATIC OF POLE AND TRANSFORMER | | | LOCATIONS. | | | RESPECTFULLY, | | | MARK HURLEY [email protected] |
| |
Print |
|