Plan Review Notes
Plan Review Notes For Project Z22100018
Project Number Z22100018
Review Stop STORM
Sequence Number 1
Notes
Date Text
2022-11-13 09:25:57THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL
 DETAILS, DESIGN CALCULATIONS AND THE POLLUTION
 PREVENTION PLAN WILL BE REVIEWED AS PART OF THE
 ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT
 APPLICATION PROCESSES.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE
 PLAN APPROVAL:
  
 1. LABEL EXISTING UTILITIES (SIZE AND MATERIAL).
  
 2. PARKING STRIPING DETAIL DOES NOT MEET CITY CODE.
  
 3. SHOW COMPLETE REMOVAL OF STORM PIPE BETWEEN STORM
 MH#2 AND STORM MH #4.
  
 4. REMOVE STORM MH #3 AND THE PIPE BETWEEN STORM MH #3
 AND CURB INLET #4.
  
 5. WHAT IS HAPPENING TO THE STORM PIPE BETWEEN CURB
 INLET #2 AND STORM MH #1 - TO BE REMOVED OR TO REMAIN?
  
 6. JUSTIFY THE PROPOSED STORM PIPE SIZES THAT WILL BE
 CONNECTING TO THE CITY'S STORM DRAINAGE SYSTEM WITH
 ENGINEERING PERMIT SUBMITTAL.
  
 7. EXISTING DRAINAGE STRUCTURES TO BE CHECKED TO SEE IF
 THEY ARE LARGE ENOUGH FOR PROPOSED DRAINAGE PIPE
 CONNECTIONS.
  
 8. WHERE WILL PROPOSED STORM MH #5 DRAIN TO? EXISTING
 STORM PIPE TO THE SOUTH IS SHOWN TO BE REMOVED.
  
 9. FDOT SPECIAL TYPE "F" CURB AND GUTTER SHALL BE
 CONSTRUCTED ALONG S. OLIVE AVE.
  
 10. PROVIDE PROPOSED FINISHED FLOOR ELEVATION.
  
 11. REVIEW INVERTS OF SEWER AND STORM PIPES. THERE
 APPEARS TO BE A CONFLICT EAST OF PROPOSED CATCH BASIN
 #11.
  
 12. AVOID RUNNING THE STORM PIPE UNDER THE CIRCULAR
 LANDSCAPE AREA SOUTH OF THE BUILDING,
  
 13. SECTION C-C:
  A. LABEL S. OLIVE R/W
  B. LABEL THE SPECIAL TYPE "F" CURB AND GUTTER
  C. LABEL THE HEADER CURB(?) ALONG THE EDGE OF THE
 PAVER SIDEWALK. NOTE THE HEADER CURB IS NOT SHOWN ON
 THE PGD PLAN.
  
 14. SECTION D-D:
  A. INDICATE SUPERPAVE ASPHALT WITHIN THE R/W.
  B. LABEL THE R/W (WALLINGFORD PLACE).
  C. MAINTENANCE AGREEMENT TO BE NEEDED FOR THE PAVER
 SIDEWALK.
  
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO
 ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL.
  
 1. DRAINAGE SYSTEM TO BE DESIGNED TO MEET SFWMD ERP
 CRITERIA. STORMWATER CALCULATIONS WILL BE REVIEWED WITH
 THE ENGINEERING PERMIT SUBMITTAL. CONSIDER LOW IMPACT
 DEVELOPMENT IN THE DESIGN OF THE DRAINAGE SYSTEM.
  
 2. PROVIDE COPY OF SFWMD ERP PERMIT BEFORE START OF
 CONSTRUCTION.
  
 3. PROVIDE EROSION AND SEDIMENT CONTROL PLAN WITH THE
 ENGINEERING PERMIT SUBMITTAL.
  
  
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120 (O)
 [email protected]
  