| Plan Review Notes For Project Z22100018 |
| Project Number |
Z22100018 |
|
| Review Stop |
PU |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2023-03-13 11:43:48 | DEMOLITION PLAN | | | -WHAT IS HAPPENING TO THE LATERAL CONNECTED TO THE | | | EXISTING MANHOLE TO THE WEST? | | | -CALL OUY SIZES ADN MATERIAL OF LINES BEING REMOVED | | | -DENOTE ALL LINES THAT ARE PRIVATE | | | -SEWER "VALVES" SHOWN ARE LIKELY CLEANOUTS, PLEASE | | | CONFIRM AND REVISE AS NECESSARY. | | | -SHOW ALL EXISITNG UTILITY EASEMENTS | | | -NO LEGEND PROVIDED | | | | | | UTILTY PLAN | | | -REPLACE 4" WATER MAIN ON GRUBER PLACE UP TO DIXIE (TO | | | EXISTING 8" DIP) | | | -EXISTING SEWER MANHOLES WITH PROPOSED CONNECTIONS WILL | | | REQUIRE THE MANHOLE BE REHABBED | | | -RECORDS SHOW A FIRE HYDRANT ALREADY EXISTING IN THE | | | PROPOSED AREA. SHOW REMOVAL/REPLACEMENT ON DEMO PLANS | | | IF THAT WORK IS BEING PROPOSED | | | -GIVE REASONING FOR PROPOSED MANHOLE INSTALLATION FOR | | | NEW SEWER SYSTEM AS OPPOSED TO CONNECTING TO EXISTING | | | MANHOLE(S) | | | -ONLY 8" SEWER LATERALS ARE CALLED FOR CONNECTION TO A | | | MANHOLE. PLEASE REVISE TO SHOW THE PROPOSED LATERAL | | | MAKING CONNECTION TO THE SEWER MAIN | | | -PROVIDE PROFILES FOR BOTH WATER AND SEWER MAIN | | | INSTALLATIONS TO EXHIBIT CLEARANCE FOR CROSSINGS/COVER. | | | -PROVIDE A POINT OF SERVICE VALVE FOR THE PROPOSED FIRE | | | LINE | | | | | | |
| |
Print |
|