| Plan Review Notes For Project Z22090021 |
| Project Number |
Z22090021 |
|
| Review Stop |
TRAFFIC |
| Sequence Number |
3 |
|
| Notes |
| Date |
Text |
| 2023-02-17 10:50:56 | NO FURTHER COMMENTS. | | | | | | PREVIOUS COMMENTS: | | | 1) SATISFIED. PROVIDE AUTOTURN ANALYSIS FOR GARBAGE | | | TRUCK AND/OR SERVICE VEHICLES DRIVING IN AND OUT OF THE | | | PROPOSED DEVELOPMENT WITH VEHICLE DYNAMIC ENVELOPES AND | | | WHEEL PATHS CLEARLY DISTINCT AND DEFINED IN DIFFERENT | | | COLORS | | | 2) SATISFIED. PROVIDE A PARKING TABLE SHOWCASING THE | | | NUMBER OF REQUIRED AND PROVIDED PARKING SPACES, | | | INCLUSIVE OF ADA AND BICYCLE ONES | | | 3) SATISFIED. SHOWCASE DRIVEWAYS??? WIDTH | | | 4) SATISFIED. INSTALL PEDESTRIAN CROSSWALKS TO CONNECT | | | THE SIDEWALK NORTH AND SOUTH OF THE PROPOSED | | | SOUTH-EASTERN PARKING LOT | | | 5) SATISFIED. INSTALL A PEDESTRIAN CROSSWALK ACROSS | | | PARKE AVE BY THE STOP LOCATION SOUTH OF THE EXISTING | | | DRIVEWAY | | | 6) SATISFIED. INSTALL WHEEL STOPS AT EACH PARKING | | | STALLS ABUTTING A PEDESTRIAN WALKWAY | | | 7) SATISFIED. INSTALL STOP BAR AND SIGNAGE AT THE | | | PROPOSED NORTHERN DRIVEWAY OUTBOUND LANE | | | | | | VALERIO ORICCHIO | | | CITY TRANSPORTATION ENGINEER | | | 561-494-1092 | | | [email protected] | | | |
| |
Print |
|