Plan Review Notes
Plan Review Notes For Project Z22090021
Project Number Z22090021
Review Stop STORM
Sequence Number 3
Notes
Date Text
2023-02-22 11:16:51THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE
 2/8/2023 SUBMITTAL. PREVIOUSLY SATISFIED COMMENTS ARE
 REMOVED. REMAINING OPEN AND NEW COMMENTS CAN BE
 ADDRESSED WITH THE ENGINEERING PERMIT SUBMITTAL.
  
 1. [PARTIALLY SATISFIED - SHEET 2 OF THE CONCEPTUAL
 ENGINEERING PLANS LIST NAVD1988 AT THE BOTTOM RIGHT OF
 THE PAGE.] BE CONSISTENT WITH THE VERTICAL DATUM USED
 ON THE SURVEY AND ON THE ENGINEERING PLANS. THE CITY'S
 OFFICIAL VERTICAL DATUM PER CITY CODE IS NGVD1929. THE
 NAVD1988 VERTICAL DATUM MAY BE USED IF THE CONVERSION
 EQUATION BETWEEN NAVD1988 AND NGVD1929 IS PROVIDED.
 LIST THE VERTICAL DATUM AND CONVERSION EQUATION (IF
 APPLICABLE) ON EVERY SHEET WITH ELEVATION INFORMATION.
  
 NEW COMMENTS (1/4/2023 SUBMITTAL):
  
 4. [SATISFIED] UTILITIES SHOWN ON THE LANDSCAPE PLANS
 DO NOT MATCH THE CONCEPTUAL ENGINEERING PLANS.
  
 5. [SATISFIED] GRATE ELEVATION (19.00 FT NGVD) OF THE
 CONTROL STRUCTURE IS HIGHER THAN THE PERIMETER
 ELEVATION (18.75 FT NGVD) SHOWN IN THE TYPICAL DRY
 RETENTION AREA / PERIMETER BERM SECTION DETAIL ON SHEET
 1. CONSIDER MOVING THE CONTROL STRUCTURE TO THE WEST
 INTO THE INTERIOR OF THE DRY RETENTION AREA,
 ELIMINATING THE WEIR AND THE WEST PIPE AND STRUCTURE TO
 THE WEST AND LOWERING THE GRATE ELEVATION TO CONTROL
 ELEVATION OF 18.35. A SKIMMER COULD BE ATTACHED TO THE
 OUTSIDE OF THE STRUCTURE AND/OR A PRB PLACED OVER THE
 EAST PIPE.
  
 6. [SATISFIED] PROVIDE CROSS SECTIONS THROUGH THE NEW
 PARKING LOTS SHOWING SURFACE FEATURES, DIMENSIONS,
 SLOPES (ARROWS) AND GRADE BREAKS.
  
 7. [SATISFIED] CONVERT THE SURFACE WATER MANAGEMENT
 SUMMARY INFORMATION ON SHEET 1 TO THE DATUM USED ON THE
 PLANS.
  
 NEW COMMENTS (2/8/2023 SUBMITTAL):
 8. INDICATE LOCATION OF WHEEL STOPS ON SECTION A-A ON
 SHEET 1.
  
 9. CHECK THE GRADES VS. THE TRAVEL LANE SLOPES AND
 WIDTHS SHOWN ON SECTION A-A ON SHEET 1.
  
 10. CONFIRM FINISHED FLOOR ELEVATION OF 19.50 FT NGVD
 SHOWN ON THE BUILDING PAD AND IN THE SURFACE WATER
 MANAGEMENT SUMMARY AT THE TOP OF SHEET 1.
  
 11. RECTIFY THE TWO TOP OF PLATE ELEVATIONS (16.00 /
 18.35) ON THE CONTROL STRUCTURE DETAIL (STRUCTURE S-3)
 ON SHEET 2.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120 (O)
 [email protected]
  