Plan Review Notes
Plan Review Notes For Project Z22090021
Project Number Z22090021
Review Stop STORM
Sequence Number 1
Notes
Date Text
2022-10-13 00:04:11THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL
 DETAILS, DESIGN CALCULATIONS AND THE POLLUTION
 PREVENTION PLAN WILL BE REVIEWED AS PART OF THE
 ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT
 APPLICATION PROCESSES.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE
 PLAN APPROVAL:
  
 1. BE CONSISTENT WITH THE VERTICAL DATUM USED ON THE
 SURVEY AND ON THE ENGINEERING PLANS. THE CITY???S
 OFFICIAL VERTICAL DATUM PER CITY CODE IS NGVD1929. THE
 NAVD1988 VERTICAL DATUM MAY BE USED IF THE CONVERSION
 EQUATION BETWEEN NAVD1988 ABD NGVD1929 IS PROVIDED.
 LIST THE VERTICAL DATUM AND CONVERSION EQUATION (IF
 APPLICABLE) ON EVERY SHEET WITH ELEVATION INFORMATION.
  
 2. PROVIDE A DETAIL OF THE CONTROL STRUCTURE.
  
 3. CONSIDER PROVIDING 2 FEET OF OVERHANG FOR THE EAST
 PARKING SPACES. SHOW AND LABEL THE PARKING OVERHANG.
  
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO
 ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL.
  
 1. DRAINAGE SYSTEM TO BE DESIGNED TO MEET SFWMD ERP
 CRITERIA. STORMWATER CALCULATIONS WILL BE REVIEWED WITH
 THE ENGINEERING PERMIT SUBMITTAL.
  
 2. PROVIDE COPY OF SFWMD ERP PERMIT BEFORE START OF
 CONSTRUCTION.
  
 3. PROVIDE EROSION AND SEDIMENT CONTROL PLAN WITH THE
 ENGINEERING PERMIT SUBMITTAL.
  
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120 (O)
 [email protected]
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved