| Plan Review Notes For Project Z22090019 |
| Project Number |
Z22090019 |
|
| Review Stop |
PU |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2023-07-13 12:48:22 | -DENOTE MATERIAL FOR ALL EXISTING UTILITIES | | | -SHOW ALL EXISITING UTILITIES WITHIN PROJECT SCOPE | | | -SHOW ALL LATERALS/SERVICES WITHIN PROJECT SCOPE | | | -SHOW ALL VALVES AND APPURTENANCES FOR EXISTING AND | | | PROPOSED UTILITIES LEGIBLY | | | -LABEL ALL EXISTING DRY UTILTIES | | | -FITTINGS NOT PERMITTED BETWEEN METER AND BACKFLOW PER | | | STANDARD DETAILS | | | -CALL OUT ALL MEANS OF CONNECTION | | | -CALL OUT SIZE AND MATERIAL FOR ALL PROPOSED UTILTIES | | | -VALVES SHOWN WITHOUT SERVICES | | | -PROVIDE 5 FOOT RADIAL CLEARANCE FOR METER BOXES AND | | | CLEANOUTS | | | -LATERALS/SERVICES NOT TO BE USED REQUIRE REMOVAL UP TO | | | THE MAIN | | | -DENOTE CITY'S POINTS OF SERVICE | | | -PROVIDE PROFILES FOR ALL CONNECTIONS FROM POINT OF | | | CONNECTION TO THE POINT OF SERVICE | | | -PROVIDE DEMAND CALCULATIONS IN ORDER TO ENSURE | | | EXISTING PIPES CAN PROVIDE SUFFICIENT FLOW | | | -DATUM CONVERSION MISSING | | | SPECIFY DOWNSTREAM LIFTSTATION THAT SERVES THE PROJECT | | | AREA | | | -PROVIDE CROSSING INFORMATION FOR ALL UTILITIES | | | -LATERALS LARGER THAN 6" WILL REQUIRE CONNECTION VIA | | | MANHOLE, AS WELL AS A CLEANOUT OF CORRESPONDING SIZE AT | | | R/W | | | -SAMPLE POINTS REQUIRED | | | -FDOH PERMITS REQUIRED | | | -BLOW-UP DETAIL NEEDED FOR ALL CONNECTION |
| |
Print |
|