| Plan Review Notes For Project Z22090018 |
| Project Number |
Z22090018 |
|
| Review Stop |
PU-CS |
| Sequence Number |
3 |
|
| Notes |
| Date |
Text |
| 2023-07-25 13:09:00 | PLEASE PROVIDE WRITTEN RESPONSES TO THE FOLLOWING: | | | -RESPONSE LETTER SAID WATER AND SEWER DEMAND | | | CALCULATIONS WERE ADDED TO SHEET C1.2, BUT CANNOT FIND | | | THEM. PLEASE ADD. | | | -RESPONSE LETTER SAID FDC IS AT SOUTHEAST BUILDING | | | CORNER ON SHEET C1.2, BUT CANNOT FIND IT. PLEASE SHOW | | | AND LABEL. | | | -LANDSCAPE PLANS DO NOT SHOW UPDATED UTILITIES FROM | | | ENGINEERING PLANS. PLEASE UPDATE LANDSCAPING PLANS TO | | | SHOW PROPOSED UTILITIES. | | | -PROPOSED 8 INCH FIRELINE WATER SERVICE WOULD NEED 8 | | | INCH DETECTOR FIRELINE BACKFLOW ASSEMBLY. SHOW AND | | | LABEL IT NEAR THE NORTHEAST AREA OF PROPERTY. | | | -ENGINEERING PLANS SHOW TWO SETS OF WATER METERS. LOOKS | | | LIKE REVISED SYMBOLS WERE ADDED, BUT THE OLD SYMBOLS | | | WERE NOT REMOVED AND THE CALLOUT LABELS NOT | | | TRANSFERRED. PLEASE UPDATE ENGINEERING PLANS. | | | -CONTAINMENT BACKFLOW ASSEMBLY LOCATIONS ARE NOT | | | ACCEPTABLE NEAR THE WESTERN PROPERTY LINE. NEEDS TO BE | | | NEAR THE EASTERN PROPERTY LINE. WHEN DETERMINING | | | BACKFLOW LOCATIONS IT MAY HELP TO ALSO CONSIDER THE | | | LANDSCAPING PLAN LAYOUT. | | | -PE PIPE MATERIAL IS NOT ACCEPTABLE BETWEEN WATER METER | | | AND DOMESTIC BACKFLOW ASSEMBLY. | | | -LABEL WATER MAIN WITH PIPE SIZE AND MATERIAL TYPE. | | | -UPDATE E22030048 WITH ANY CHANGES APPROVED THROUGH | | | THIS PPRC PROJECT. | | | RESPECTFULLY, | | | MARK HURLEY [email protected] |
| |
Print |
|