| 2022-10-13 00:00:02 | THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL |
| | DETAILS, DESIGN CALCULATIONS AND THE POLLUTION |
| | PREVENTION PLAN WILL BE REVIEWED AS PART OF THE |
| | ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT |
| | APPLICATION PROCESSES. |
| | |
| | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE |
| | PLAN APPROVAL: |
| | |
| | 1. NO PGD PLAN PROVIDED. |
| | |
| | 2. SHOW THE BOUNDARY FOR THE 925 N. RAILROAD AVE. |
| | PARCEL. |
| | |
| | 3. LABEL THE FINISHED FLOOR ELEVATION. |
| | |
| | 4. BUILDING EXTENDS NORTH OF THE 925 N. RAILROAD AVE |
| | PARCEL. |
| | |
| | 5. PROVIDE A CROSS SECTION FROM THE CENTERLINE OF N. |
| | RAILROAD AVE TO THE BUILDING FACE. SHOW GRADE BREAKS, |
| | R/W LINE, NAME OF R/W, DISTANCES FROM R/W TO BACK OF |
| | CURB, TO FACE OF BUILDING, ETC. USE THE PROPOSED DESIGN |
| | OF N. RAILROAD AVE. |
| | |
| | 6. LABEL ALL UTILITIES (SIZE, MATERIAL). |
| | |
| | |
| | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO |
| | ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING |
| | BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL. |
| | |
| | 1. DRAINAGE SYSTEM TO BE DESIGNED TO MEET SFWMD ERP |
| | CRITERIA. STORMWATER CALCULATIONS WILL BE REVIEWED WITH |
| | THE ENGINEERING PERMIT SUBMITTAL. |
| | |
| | 2. PROVIDE COPY OF SFWMD ERP PERMIT BEFORE START OF |
| | CONSTRUCTION. |
| | |
| | 3. PROVIDE EROSION AND SEDIMENT CONTROL PLAN WITH THE |
| | ENGINEERING PERMIT SUBMITTAL. |
| | |
| | |
| | |
| | TRACY WARD, PE |
| | SENIOR STORMWATER ENGINEER |
| | ENGINEERING SERVICES DEPARTMENT |
| | 561-494-1120 (O) |
| | [email protected] |
| | |
| |