2023-05-15 15:07:45CONDITIONS OF APPROVAL THAT WILL REQUIRE BEING MET
 DURING ENGINEERING REVIEW:
 -COMMENT 1 FROM PREVIOUS REVIEW NOT ADDRESSED
 -COMMENT 3 FROM PREVIOUS REVIEW NOT FULLY ADDRESSED,
 PLEASE REFER TO DETAIL GS-6 FOR CLEANOUT PLACEMENT AND
 EASEMENT REQUIREMENTS.
 -COMMENT 6 FROM PREVIOUS REVIEW NOT ADDRESSED
 -COMMENT 9 FROM PREVIOUS REVIEW NOT ADDRESSED
 -CITY STANDARDS CALL FOR DIP INSTALLATION FOR WATER
 MAIN
 -DENOTE THE CITY'S POINT OF SERVICE FOR BOTH WATER AND
 SEWER
 -SEWER CCTV INSPECTION SHOWED THAT THE CURRENT
 CONDITION OF THE PIPE MAY BE BEYOND LINING. PIPE
 REPLACEMENT WILL LIKELY NEED TO BE DISCUSSED.
  