Plan Review Notes
Plan Review Notes For Project Z22090016
Project Number Z22090016
Review Stop TRAFFIC
Sequence Number 2
Notes
Date Text
2023-02-28 19:55:59TRAFFIC COMMENTS
 1) PARTIALLY SATISFIED. PROVIDE A FULL DETAILED TRAFFIC
 STUDY. NOTE: THE STUDY MUST BE PRESENTED IN A SEPARATE
 DOCUMENT THAN THE INSIGNIFICANT TIS. PLEASE COMPLETE
 THE STUDY, INCLUSIVE OF TEST 2, AND PROVIDE SUMMARY
 TABLES HIGHLIGHTING DEFICIENCIES AND/OR LEVEL OF
 SERVICE DEGRADATION, IF ANY; A SITE PLAN SHOULD BE
 PROVIDED. HCM ANALYSIS FOR THE EVERNIA DRIVEWAY SHOULD
 BE PROVIDED TO PROVE THAT A LEFT-TURN LANE WOULD NOT BE
 NECESSARY. PLEASE KEEP IN MIND THAT COUNTY CONCURRENCY
 DOES NOT NECESSARILY IMPLY CITY CONCURRENCY, AND THE
 FACT THAT THE PROPOSED DEVELOPMENT IS WITHIN A TCEA
 DOES NOT PRECLUDE THE CITY TO REQUEST FURTHER ANALYSIS
 2) SATISFIED. PROVIDE COUNTY TPS LETTER, ONCE RECEIVED
 3) NOT SATISFIED. PROVIDE TRANSPORTATION DEMAND
 MANAGEMENT (TDM) MEASURES. NONE WERE PROPOSED IN THE
 LATEST RESUBMISSION, EVEN THOUGH A SECTION IN THE
 TRAFFIC STATEMENT WAS TITLED AS SUCH.
  
 SITE COMMENTS
 4) PARTIALLY SATISFIED. PROVIDE A TRANSPORTATION
 SPECIFIC SITE PLAN FOR THE GROUND FLOOR. SHOWCASING
 TRANSPORTATION RELATED FEATURES (E.G. ROADWAY WIDTHS,
 DRIVING AISLES, PARKING STALLS, SIDEWALK, CURB, GUTTER,
 DRIVEWAY, GATES, CROSSWALKS, VISIBILITY TRIANGLE,
 CORNER & DRIVEWAY SEPARATION DISTANCES, SLOPES, ETC.)
 PROPERLY LABELED AND DIMENSIONED. THE SITE PLAN SHOULD
 BE NAMED T1. SEVERAL TRANSPORTATION ITEMS AND
 CORRESPONDING DIMENSIONS ARE MISSING, PLEASE REVISE.
 5) NOT SATISFIED. IN THE T1 SITE PLAN, PLEASE SHOWCASE
 BASIC CURB DETAILS (E.G. DRIVEWAY, CURB CUTS, PAVEMENT
 MARKINGS, PARKING STALLS, ETC.) ON THE OPPOSITE SIDE OF
 THE ROADS SURROUNDING THE PROPOSED DEVELOPMENT
 6) PARTIALLY SATISFIED. PROVIDE A SIGNAGE AND PAVEMENT
 MARKING PLAN, WHICH COULD BE A SEPARATE DOCUMENT OR
 INCLUDED IN THE T1 SITE PLAN. SEVERAL SIGNAGE AND
 PAVEMENT MARKINGS, ESPECIALLY RELATED TO THE ALLEY ARE
 MISSING
 7) NOT SATISFIED. PROVIDE AUTOTURN ANALYSIS FOR GARBAGE
 TRUCK AND/OR SERVICE VEHICLES DRIVING IN AND OUT OF THE
 PROPOSED DEVELOPMENT WITH VEHICLE DYNAMIC ENVELOPES AND
 WHEEL PATHS CLEARLY DISTINCT AND DEFINED IN DIFFERENT
 COLORS. PLEASE PROVIDE A HIGHER RESOLUTION BACKGROUND
 IMAGE, INSERT EXACT MEASUREMENTS OF ALLEY WIDTH, AS THE
 ACTUAL DRIVABLE SURFACE IS MUCH LESS THAN 11-FEET. ANY
 OBSTRUCTION, SUCH AS LIGHT POLES AND TREES MUST BE
 IDENTIFIED AND TAKEN INTO ACCOUNT. THERE ARE MAJOR
 ENCROACHMENTS SHOWN AT THE MOMENT.
 8) SATISFIED. PROVIDE A PARKING TABLE SHOWCASING THE
 NUMBER OF REQUIRED AND PROVIDED PARKING SPACES,
 INCLUSIVE OF ADA AND BICYCLE ONES
 9) SATISFIED. ARE THERE ANY GATES PROPOSED? IF SO,
 CLEARLY SHOWCASE THE REQUIRED 20 FEET SETBACK DISTANCE
 FROM THE BACK OF THE SIDEWALK OR EDGE OF TRAVEL LANES
 10) SATISFIED. IS VALET SERVICE PROPOSED? IF SO,
 PROVIDE AN OPERATIONAL ANALYSIS
 11) NOT SATISFIED. ALLEY SHOULD BE DESIGNATED ONE-WAY,
 INSTALL PAVEMENT MARKINGS AND SIGNAGE ACCORDINGLY.
 PLEASE COORDINATE WITH PUBLIC WORKS PERTAINING
 PREFERRED DIRECTIONALITY. THE PROPOSED DEVELOPMENT IS
 GENERATING A SIGNIFICANT NUMBER OF NEW TRIPS THAT WILL
 TRAVERSE THE ALLEY; THUS, IN ORDER TO PROVIDE SAFE AND
 OPTIMAL VEHICULAR OPERATIONS, PROPER MITIGATION
 MEASURES, SUCH AS RE-PAVEMENT WITH AT LEAST
 ONE-AND-ONE-HALF-INCH ASPHALT THICKNESS, EXTENSIVE
 SIGNAGE AND PAVEMENT MARKINGS, AND REMOVAL OF OBSTACLES
 AND OBSTRUCTIONS ARE WARRANTED. PLEASE DO SHOW THE
 EFFECTIVE PAVEMENT WIDTH, BASED ON ACTUAL & CURRENT
 FIELD MEASUREMENTS AND OBSERVATIONS.
 12) NOT SATISFIED. SHOWCASE THE ALLEYWAY AND ALL
 RELATED TRANSPORTATION FEATURES THROUGHOUT ITS ENTIRE
 LENGTH FROM SAPODILLA TO ROSEMARY. LATEST
 TRANSPORTATION SITE PLAN IS EXTREMELY DEFICIENT IN
 ADDRESSING THIS COMMENT.
 13) THE PROPOSED LOADING ZONE DOES NOT SEEM PROPERLY
 LOCATED FOR SAFE AND ATTAINABLE VEHICULAR OPERATIONS
 AND MANEUVERINGS. A DEDICATED AND MORE DETAILED (E.G.
 SHOWCASE EXACT ROAD CONFIGURATION, HIGHLIGHT ANY
 OBSTRUCTIONS/OBSTACLES, ETC.) AUTOTURN ANALYSIS SHOULD
 BE PERFORMED TO PROVE ITS FEASIBILITY
  
 VALERIO ORICCHIO
 CITY TRANSPORTATION ENGINEER
 561-494-1092
 [email protected]
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved