| Date |
Text |
| 2022-10-13 07:48:59 | TRAFFIC COMMENTS |
| | 1) PROVIDE A FULL DETAILED TRAFFIC STUDY. NOTE: THE |
| | STUDY MUST BE PRESENTED IN A SEPARATE DOCUMENT THAN THE |
| | INSIGNIFICANT TIS |
| | 2) PROVIDE COUNTY TPS LETTER, ONCE RECEIVED |
| | 3) PROVIDE TRANSPORTATION DEMAND MANAGEMENT (TDM) |
| | MEASURES |
| | |
| | SITE COMMENTS |
| | 4) PROVIDE A TRANSPORTATION SPECIFIC SITE PLAN FOR THE |
| | GROUND FLOOR. SHOWCASING TRANSPORTATION RELATED |
| | FEATURES (E.G. ROADWAY WIDTHS, DRIVING AISLES, PARKING |
| | STALLS, SIDEWALK, CURB, GUTTER, DRIVEWAY, GATES, |
| | CROSSWALKS, VISIBILITY TRIANGLE, CORNER & DRIVEWAY |
| | SEPARATION DISTANCES, SLOPES, ETC.) PROPERLY LABELED |
| | AND DIMENSIONED. THE SITE PLAN SHOULD BE NAMED T1 |
| | 5) IN THE T1 SITE PLAN, PLEASE SHOWCASE BASIC CURB |
| | DETAILS (E.G. DRIVEWAY, CURB CUTS, PAVEMENT MARKINGS, |
| | PARKING STALLS, ETC.) ON THE OPPOSITE SIDE OF THE ROADS |
| | SURROUNDING THE PROPOSED DEVELOPMENT |
| | 6) PROVIDE A SIGNAGE AND PAVEMENT MARKING PLAN, WHICH |
| | COULD BE A SEPARATE DOCUMENT OR INCLUDED IN THE T1 SITE |
| | PLAN |
| | 7) PROVIDE AUTOTURN ANALYSIS FOR GARBAGE TRUCK AND/OR |
| | SERVICE VEHICLES DRIVING IN AND OUT OF THE PROPOSED |
| | DEVELOPMENT WITH VEHICLE DYNAMIC ENVELOPES AND WHEEL |
| | PATHS CLEARLY DISTINCT AND DEFINED IN DIFFERENT COLORS |
| | 8) PROVIDE A PARKING TABLE SHOWCASING THE NUMBER OF |
| | REQUIRED AND PROVIDED PARKING SPACES, INCLUSIVE OF ADA |
| | AND BICYCLE ONES |
| | 9) ARE THERE ANY GATES PROPOSED? IF SO, CLEARLY |
| | SHOWCASE THE REQUIRED 20 FEET SETBACK DISTANCE FROM THE |
| | BACK OF THE SIDEWALK |
| | 10) IS VALET SERVICE PROPOSED? IF SO, PROVIDE AN |
| | OPERATIONAL ANALYSIS |
| | 11) ALLEY SHOULD BE DESIGNATED ONE-WAY, INSTALL |
| | PAVEMENT MARKINGS AND SIGNAGE ACCORDINGLY. PLEASE |
| | COORDINATE WITH PUBLIC WORKS PERTAINING PREFERRED |
| | DIRECTIONALITY |
| | 12) SHOWCASE THE ALLEYWAY AND ALL RELATED |
| | TRANSPORTATION FEATURES THROUGHOUT ITS ENTIRE LENGTH |
| | FROM SAPODILLA TO ROSEMARY |
| | |
| | VALERIO ORICCHIO |
| | CITY TRANSPORTATION ENGINEER |
| | 561-494-1092 |
| | [email protected] |
| | |
| |
Print |