| Plan Review Notes For Project Z22090016 |
| Project Number |
Z22090016 |
|
| Review Stop |
STORM |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2022-10-13 00:09:11 | THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL | | | DETAILS, DESIGN CALCULATIONS AND THE POLLUTION | | | PREVENTION PLAN WILL BE REVIEWED AS PART OF THE | | | ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT | | | APPLICATION PROCESSES. | | | | | | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE | | | PLAN APPROVAL: | | | | | | 1. SHOW AND LABEL THE 2 FEET OF LANDSCAPE OVERHANG FOR | | | THE GROUND FLOOR PARKING SPACES. | | | | | | 2. UNDERGROUND PARKING MAY PRECLUDE THE USE DRAINAGE | | | STRUCTURES AND EXFILTRATION TRENCH ON THE GROUND FLOOR. | | | | | | | | | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO | | | ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING | | | BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL. | | | | | | 1. DRAINAGE SYSTEM TO BE DESIGNED TO MEET SFWMD ERP | | | CRITERIA. STORMWATER CALCULATIONS WILL BE REVIEWED WITH | | | THE ENGINEERING PERMIT SUBMITTAL. | | | | | | 2. PROVIDE COPY OF SFWMD ERP PERMIT BEFORE START OF | | | CONSTRUCTION. | | | | | | 3. PROVIDE EROSION AND SEDIMENT CONTROL PLAN WITH THE | | | ENGINEERING PERMIT SUBMITTAL. | | | | | | | | | TRACY WARD, PE | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | 561-494-1120 (O) | | | [email protected] | | | |
| |
Print |
|