2023-04-14 16:52:23TRAFFIC COMMENTS
 1) SATISFIED. SETUP A METHODOLOGY MEETING
 2) SATISFIED. PROVIDE A FULL DETAILED TRAFFIC ANALYSIS.
 NOTE: THIS SHOULD BE A SEPARATE DOCUMENT FROM THE
 TRAFFIC IMPACT STATEMENT
 3) SATISFIED. PROVIDE LATEST SITE PLAN IN THE ANALYSIS
 4) SATISFIED. PROVIDE COUNTY TPS LETTER, ONCE RECEIVED
 5) SATISFIED. PROVIDE VALID TRANSPORTATION DEMAND
 MANAGEMENT (TDM) MEASURES
  
 SITE COMMENTS
 6) NOT SATISFIED. PROVIDE A TRANSPORTATION SPECIFIC
 SITE PLAN FOR THE GROUND FLOOR. SHOWCASING
 TRANSPORTATION RELATED FEATURES (E.G. ROADWAY WIDTHS,
 DRIVING AISLES, PARKING STALLS, SIDEWALK, CURB, GUTTER,
 DRIVEWAY, GATES, CROSSWALKS, VISIBILITY TRIANGLE,
 CORNER & DRIVEWAY SEPARATION DISTANCES, SLOPES, ETC.)
 PROPERLY LABELED AND DIMENSIONED. SEVERAL DIMENSIONS
 MISSING IN LATEST RESUBMISSION, PLEASE REMOVE TREE
 CANOPY GRAPHICS. IT IS STRONGLY SUGGESTED TO SETUP A
 MEETING WITH TRAFFIC ENGINEERING TO CLARIFY CITY
 EXPECTATIONS ON THIS ITEM.
 7) SATISFIED. IN THE TRANSPORTATION SITE PLAN, PLEASE
 SHOWCASE BASIC CURB DETAILS (E.G. DRIVEWAY, CURB CUTS,
 PAVEMENT MARKINGS, PARKING STALLS, ETC.) ON THE
 OPPOSITE SIDE OF THE ROADS SURROUNDING THE PROPOSED
 DEVELOPMENT
 8) NOT SATISFIED. PROVIDE A SIGNAGE AND PAVEMENT
 MARKING PLAN. INCLUSIVE OF ALL FEATURES WITHIN THE
 PROPOSED DEVELOPMENT AND ALONG ALL ROADS FRONTING THE
 SITE. THIS CAN BE INCLUDED IN THE TRANSPORTATION SITE
 PLAN
 9) SATISFIED. PROVIDE AUTOTURN ANALYSIS FOR GARBAGE
 TRUCK VEHICLES
 10) SATISFIED. PROVIDE ENGINEERING REFERENCE AND SPECS
 SHEETS FOR EACH OF THE PROPOSED TRANSPORTATION FEATURES
 (E.G. CURB, RAMP, GATE, SIGNAGE, PAVEMENT MARKING,
 SIGNAL, ETC.)
 11) SATISFIED. IDENTIFY AND DESIGNATE AN EASILY
 ACCESSIBLE MICRO-MOBILITY STATION AREA (MINIMUM 8 X 20
 FEET) AND PROVIDE BASIC ELECTRIFICATION READINESS WITH
 THE FOLLOWING SPECS: A CONDUIT (2-INCH SCHEDULE 40 PVC)
 TO THE POWER SOURCE WITH AN ELECTRICAL PULL BOX (240V /
 10,000W CIRCUIT)
 12) SATISFIED. PROVIDE A PARKING TABLE SHOWCASING THE
 NUMBER OF REQUIRED AND PROVIDED PARKING SPACES,
 INCLUSIVE OF ADA AND BICYCLE ONES
 13) SATISFIED. ARE THERE ANY VEHICULAR GATES PROPOSED
 WITHIN 20-FEET FROM THE BACK OF THE SIDEWALK?
 14) SATISFIED. IS VALET SERVICE PROPOSED? IF SO,
 PROVIDE AN OPERATIONAL ANALYSIS. DETAILS OF THE
 ANALYSIS SHOULD BE DISCUSSED DURING THE METHODOLOGY
 MEETING
 15) SATISFIED. EXISTING SIDEWALK ON DATURA IS 10-FEET
 WIDE, THAT MEASUREMENT SHOULD BE PRESERVED IF NOT
 EXCEEDED
 16) SATISFIED. PER CITY CODE SEC 94-111(Q)(2):
 NON-PARKING RAMPS SHALL NOT EXCEED 16 PERCENT. IF THE
 RAMP IS GREATER THAN 14 PERCENT, A BREAK-OVER
 TRANSITION SHALL BE REQUIRED. THE PREFERRED STANDARD IS
 TEN PERCENT FOR NON-PARKING RAMP SLOPES. PLEASE PROVIDE
 SLOPE PERCENTAGES FOR EACH RAMP AND CONFORM TO CODE
 PERTAINING THE BREAK-OVER TRANSITION
 17) SATISFIED. PER CITY CODE SEC 94-111(C)(1): IN THOSE
 CASES WHERE THE SIDE OF ANY STALL IS ADJACENT TO A
 WALL, FENCE, BUILDING, OR OTHER PHYSICAL OBSTRUCTION,
 THE STALL WIDTHS SHALL BE INCREASED BY A MINIMUM OF ONE
 FOOT. WHERE THERE IS AN OBSTRUCTION ON BOTH SIDES OF
 THE STALL, THE STALL WIDTHS SHALL BE INCREASED BY A
 MINIMUM OF TWO FEET. PROVIDE DIMENSIONS FOR EACH
 PARKING STALL ADJACENT TO A WALL OR OBSTRUCTIONS
 18) PLEASE PROVIDE DETAILS PERTAINING STACKER
 OPERATIONS. WHO WILL BE USING/ACCESSING THEM AND HOW
 ARE OPERATIONS CONDUCTED AND MONITORED
  
 VALERIO ORICCHIO
 CITY TRANSPORTATION ENGINEER
 561-494-1092
 [email protected]
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved