| 2023-04-05 07:09:55 | PLEASE PROVIDE WRITTEN RESPONSE TO THE FOLLOWING: |
| | -RESPONSE LETTER SAID WATER DEMAND CALCULATIONS, FDC, |
| | UTILITY EASEMENT, AND CLEANOUTS WERE ADDED, BUT CANNOT |
| | FIND IN ENGINEERING PLAN SET. ADD TO NEXT RESUBMITTAL. |
| | -RESPONSE LETTER SAID WATER SERVICE STANDARD DETAIL WS7 |
| | AND WS5 WAS ADDED, BUT CANNOT FIND IN ENGINEERING PLAN |
| | SET. ADD TO NEXT RESUBMITTAL. |
| | -RESPONSE LETTER SAID ENGINEERING PLANS UPDATED TO SHOW |
| | SOUTHEAST DRIVEWAYS ARE BEING REMOVED. PLEASE SHOW THAT |
| | MORE CLEARLY ON DEMOLITION AND PGD PLAN SHEETS. |
| | -ADD WATER SERVICE STANDARD DETAIL WS2 TO ENGINEERING |
| | PLAN SET. |
| | -LANDSCAPING PLAN SHOWS CONFLICTS BETWEEN LANDSCAPING |
| | AND UTILITIES. IT DOES ALSO NOT SHOW UPDATED UTILITY |
| | LOCATIONS. IN RESUBMITTAL PACKAGE, PROVIDE COPY OF |
| | LANDSCAPING PLANS WITH UPDATED UTILITY LOCATIONS SHOWN. |
| | ENSURE THERE ARE NO CONFLICTS BETWEEN LANDSCAPING AND |
| | UTILITIES. |
| | -NOTIFY FIRE SYSTEM PLAN DESIGNER THAT FIRE SYSTEM NEAR |
| | FIRELINE BACKFLOW ASSEMBLY MUST COMPLY WITH WPB |
| | ENGINEERING WATER SERVICE STANDARD DETAIL WS5. THEY |
| | NEED TO INCLUDE COPY OF THAT DETAIL IN THEIR PLAN SET |
| | AND ENSURE NO GALVANIZED PIPE IS USED UPSTREAM OF |
| | FIRELINE BACKFLOW ASSEMBLY. |
| | -ARCHITECTURAL AND ENGINEERING PLANS SHOW A |
| | MICRO-MOBILITY STATION BUT LANDSCAPING PLANS DO NOT. |
| | PLEASE MAKE SURE ALL PLAN SETS ACCURATELY SHOW ANY |
| | MICRO-MOBILITY STATIONS. |
| | -ON SHEET C2.2, CALLOUT LOCATION OF FIRELINE BACKFLOW |
| | ASSEMBLY. |