| Date |
Text |
| 2023-01-04 13:15:39 | -ADDRESS COMMENTS FROM LAST REVIEW NOTING EVIDENCE OF |
| | EXISTING MAIN THAT HAS A PROPOSED TAP |
| | -PLEASE READ THROUGH GIVEN CHECKLIST TO ADDRESS |
| | STANDARD COMMENTS THAT HAVE NOT BEEN FULFILLED, I.E.: |
| | -5 PROVIDE VERTICAL DATUM AND DATUM CONVERSION |
| | INFORMATION (NAVD 1988 AND NGVD 1929). |
| | -6 SHOW PROJECT ADDRESS ON ALL PLAN SHEETS. |
| | -10 PROVIDE CCTV VIDEO AND PIPE RUN REPORT OF EXISTING |
| | GRAVITY INFRASTRUCTURES ALONG ENTIRE PROJECT FRONTAGE. |
| | (MANHOLE TO MANHOLE) |
| | -11 ADD NOTE TO PROVIDE 50 FT. PAVEMENT RESTORATION |
| | TRANSITION ON EACH SIDE OF PROPOSED TRENCH IN CITY |
| | MAINTAINED ROADWAY AREAS PER CITY OF WPB STANDARD |
| | DETAIL GC-8. |
| | -PROVIDE PROFILE AND VERTICAL CLEARANCES BETWEEN WATER, |
| | SEWER AND STORM LINES PER CITY OF WEST PALM BEACH |
| | STANDARD DETAIL GN-2 SERIES, AT ALL UTILITY CROSSINGS. |
| | SHOW EXISTING UNDERGROUND UTILITIES ON THE PROFILE TO |
| | EASILY DENOTE UTILITY CROSSINGS. THE PROFILE SHOULD |
| | SHOW PROPOSED PIPE FROM TIE-IN AT THE MAIN TO POINT OF |
| | SERVICE. |
| | -SHOW STATIONING AND HORIZONTAL SEPARATION CLEARANCE |
| | BETWEEN PROPOSED UTILITIES AND EXISTING UTILITIES |
| | AND/OR BASELINE. |
| | -LABEL WATER LINES AS PRIVATE WHERE APPLICABLE. |
| | -SHOW EXISTING AND PROPOSED DEDICATED UTILITY EASEMENTS |
| | TO ALLOW ACCESS FOR CITY PERSONNEL TO PROPOSED UTILITY |
| | WATER METERS. VERIFY THAT THERE ARE NO STRUCTURES |
| | WITHIN EASEMENT. |
| | - SHOW DIRECTION OF FLOW ON PLAN VIEW FOR ALL SANITARY |
| | AND STORM SEWERS. |
| | |
| | |
| | |
| | |
| | |
| | |
| |
Print |