| Plan Review Notes For Project Z22090013 |
| Project Number |
Z22090013 |
|
| Review Stop |
SURVEY |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2022-10-11 10:10:07 | 1. REPLAT WILL BE REQUIRED. | | | 2. IT APPEARS THAT THE APPLICANT IS REQUESTING THAT THE | | | ALLEY PROCEEDS BE USED TO FUND THE CONNECTOR ROAD AND | | | THAT THE CITY COMPLETE THE ROADWAY PRIOR TO T.C.O. THIS | | | WILL REQUIRE ADMIN. APPROVAL AND AGREEMENT FOR CITY TO | | | CONTRUCT ROADWAY. | | | 3. IS CONNECTOR ROAD TO BE A RIGHT-OF-WAY OR EASEMENT? | | | 4. REMOVE PROPOSED METER ASSEMBLY OUT OF EVERNIA | | | RIGHT-OF-WAY. | | | 5. SHOW PROPOSED NEW FPL POLE AT INTERSECTION OF ALLEY | | | AND RAILROAD. | | | 6. EXISTING SANITARY IN FEC R/W TO BE REMOVED OR | | | GROUTED IN PLACE. | | | 7. DRAINAGE MH EX-1 NOT SHOWN ON SURVEY. | | | 8. IS LINE BETWEEN ST-1 AND EX-3 EXISTING OR PROPOSED? | | | 9. ANY AERIAL ENCROACHMENTS INTO RIGHTS-OF-WAY WILL | | | REQUIRE AN EASEMENT. |
| |
Print |
|