Plan Review Notes
Plan Review Notes For Project Z22090013
Project Number Z22090013
Review Stop SURVEY
Sequence Number 1
Notes
Date Text
2022-10-11 10:10:071. REPLAT WILL BE REQUIRED.
 2. IT APPEARS THAT THE APPLICANT IS REQUESTING THAT THE
 ALLEY PROCEEDS BE USED TO FUND THE CONNECTOR ROAD AND
 THAT THE CITY COMPLETE THE ROADWAY PRIOR TO T.C.O. THIS
 WILL REQUIRE ADMIN. APPROVAL AND AGREEMENT FOR CITY TO
 CONTRUCT ROADWAY.
 3. IS CONNECTOR ROAD TO BE A RIGHT-OF-WAY OR EASEMENT?
 4. REMOVE PROPOSED METER ASSEMBLY OUT OF EVERNIA
 RIGHT-OF-WAY.
 5. SHOW PROPOSED NEW FPL POLE AT INTERSECTION OF ALLEY
 AND RAILROAD.
 6. EXISTING SANITARY IN FEC R/W TO BE REMOVED OR
 GROUTED IN PLACE.
 7. DRAINAGE MH EX-1 NOT SHOWN ON SURVEY.
 8. IS LINE BETWEEN ST-1 AND EX-3 EXISTING OR PROPOSED?
 9. ANY AERIAL ENCROACHMENTS INTO RIGHTS-OF-WAY WILL
 REQUIRE AN EASEMENT.
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved