Plan Review Notes For Project Z22090013
Project Number Z22090013
Review Stop STORM
Sequence Number 1
Notes
Date Text
2022-10-12 23:54:24THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL
 DETAILS, DESIGN CALCULATIONS AND THE POLLUTION
 PREVENTION PLAN WILL BE REVIEWED AS PART OF THE
 ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT
 APPLICATION PROCESSES.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE
 PLAN APPROVAL:
  
 1. LABEL ALL UTILITIES (SIZE, MATERIAL).
  
 2. REVIEW SFWMD ERP APPLICATION 140917-4 REGARDING THE
 MANHOLE SHOWN WITHIN THE RAILROAD TRACKS AND THE PIPES
 CONNECTED TO THE MANHOLE. THE DEMOLITION PLAN FOR THE
 BRIGHTLINE STATION PERMIT CALLED FOR THESE TO BE
 REMOVED.
  
 3. THERE MAY BE A STORM PIPE CONNECTED TO THE NORTH
 SIDE OF THE CATCH BASIN ON THE NORTH SIDE OF FERN ST.
 WEST OF THE F.E.C. R/W.
  
 4. IDENTIFY WHERE THE BRICKSLOT TRENCH DRAINS WILL BE
 CONSTRUCTED.
  
 5. EXPLAIN HOW STORM WATER QUALITY TREATMENT AND PEAK
 ATTENUATION WILL BE PROVIDED.
  
 6. EXPLAIN WHAT THE WEST PIPE CONNECTED TO STRUCTURE
 YD-1 IS FOR.
  
 7. IS THE SOLID HATCHING IN THE NORTH-SOUTH ALLEY ALONG
 THE WEST PROPERTY LINE NECESSARY? IT IS COVERING UP
 MANY UTILITY LINES IN THE ALLEY.
  
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO
 ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL.
  
 1. DRAINAGE SYSTEM TO BE DESIGNED TO MEET SFWMD ERP
 CRITERIA. STORMWATER CALCULATIONS WILL BE REVIEWED WITH
 THE ENGINEERING PERMIT SUBMITTAL.
  
 2. PROVIDE COPY OF SFWMD ERP PERMIT BEFORE START OF
 CONSTRUCTION.
  
 3. PROVIDE EROSION AND SEDIMENT CONTROL PLAN WITH THE
 ENGINEERING PERMIT SUBMITTAL.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120 (O)
 [email protected]
  