Plan Review Notes
Plan Review Notes For Project Z22090010
Project Number Z22090010
Review Stop Z
Sequence Number 2
Notes
Date Text
2023-03-15 14:05:27CASE NO. PB 1222S
 BRAMAN EV CHARGERS
 2801 OKEECHOBEE BOULEVARD
  
 - CONTACT ERIC SCHNEIDER @ 561-822-1446,
 [email protected]
  
 - PLEASE PROVIDE RESPONSES TO REVIEW COMMENTS IN
 WRITTEN FORMAT.
  
 - WHEN RESUBMITTING, PLEASE PROVIDE A MINIMUM OF TWO
 (2) PAPER COPIES AND AN ELECTRONIC COPY IN .PDF FORMAT
 OF ALL PLANS. PLEASE NOTE THAT CHANGES ON THE
 RESUBMITTED PLANS OR THE SUBMITTAL OF INFORMATION/PLANS
 TO ADDRESS THE COMMENTS MAY RESULT IN ADDITIONAL
 COMMENTS.
  
 - PLEASE NOTE THAT IF THE PLANNING DIVISION HAS NOT
 RECEIVED A RESPONSE TO THESE COMMENTS WITHIN 60 DAYS
 FROM THE DATE OF THESE COMMENTS (BY MAY 15, 2023), THE
 PLANNING DIVISION MAY NOTIFY THE APPLICANT THAT THE
 CASE IS CONSIDERED WITHDRAWN. ANY FURTHER ACTION SHALL
 REQUIRE A NEW DEVELOPMENT APPLICATION.
  
 - PLEASE NOTE THAT SINCE PREVIOUSLY ISSUED COMMENTS
 WERE NOT BE SUFFICIENTLY ADDRESSED, THE APPLICANT WILL
 BE ASSESSED A RESUBMITTAL FEE. SUCH FEE WILL BE 20% OF
 THE ORIGINAL APPLICATION FEE ($60). THIS SPECIFICALLY
 PERTAINS TO THE FAILURE TO CORRECT COMMETNS #2 AND #4.
  
 1) THE HANDICAP PARKING (REQUIRED AND PROVIDED) HAS
 BEEN FLIPPED FROM THE PREVIOUS VERSIONS OF THE SITE
 PLANS. THERE ARE 11 SPACES REQUIRED AND 20 PROVIDED,
 THE WAY THIS IS CURRENTLY SHOWN WOULD BE AN ADA SPACE
 DEFICIENCY ON THE SITE.
  
 2) UPDATED REPEAT COMMENT: THE LANDSCAPE PLANS NEED TO
 BE UPDATED TO REFLECT THE WALKWAY WEST OF SHOWROOM D TO
 THE SERVICE AREA. *** THE RESPONSE STATES THAT THIS IS
 REFLECTED ON SHEET LP-1; HOWEVER, NO SHEET LP-1 WAS
 INCLUDED WITH THE RESUBMITTAL. SHEET LA-1 THAT WAS
 RESUBMITTED DOES NOT SHOW THE WALKWAY.
  
 3) UPDATED COMMENT: THE GOOGLE STREETVIEW SHOWS A TREE
 IN THE LOCATION OF THE PROPOSED PORSCHE CHARGE BOX. THE
 RESUBMITTED AFFECTED AREA 2 PLAN SHOWS THIS TREE BEING
 MOVED TO THE TERMINAL LANDSCAPE ISLAND NORTH OF THE
 PARKING ROW WITH THE BENTLEY EV CHARGER. WHILE THIS IS
 ACCEPTABLE TO STAFF, THE AFFECTED AREA 2 PLAN NEEDS TO
 CORRECTLY SHOW THAT THIS TREE WAS NOT ORIGINALLY
 RELOCATED FROM THE BENTLEY EV CHARGER LOCATION BUT IS
 RATHER A TREE THAT PREDATES THE INSTALLATION OF THE
 CHARGERS.
  
 4) UPDATED REPEAT COMMENT: THERE ARE STILL
 DISCREPANCIES WITH WHAT IS SHOWN ON THE LANDSCAPE PLAN
 AND THE PICTOMETRY/STREETVIEW FOR THE CHARGERS PROPOSED
 (AND EXISTING) WITHIN THE LANDSCAPE DIVIDER AT AFFECTED
 AREA 2. ALL PLANS MUST SHOW CONSISTENT, ACCURATE
 CONDITIONS. STAFF HAS PROVIDED PHOTOS ON A SEPARATE
 COVER THAT CLEARLY ILLUSTRATES THE INCONSISTENCIES
 BETWEEN THE ACTUAL TREE LOCATION AND WHERE THEY ARE
 SHOWN ON THE LANDSCAPE PLAN. NOTE: TWO OF THE FOUR
 TREES WITHIN THE DIVIDER MEDIAN HAVE BEEN RELOCATED
 WITHIN THE DIVIDER MEDIAN. THE LANDSCAPE PLAN NEEDS TO
 SHOW ACCURATE CONDITIONS.
  
 5) UPDATED COMMENT: A LANDSCAPE PERMIT IS REQUIRED FOR
 EACH OF THE EV INSTALLATIONS THAT REQUIRE SCREENING OF
 PANELS, TRANSFORMERS, CHARGE BOXES OR TREE RELOCATIONS.
 THE PERMIT PLANS MAY BE INDIVIDUALLY DONE FOR EACH
 INSTALLATION OR COVER THE ENTIRE PROJECT. THE LANDSCAPE
 PERMIT MUST CALL OUT THE HEIGHTS OF THE SHRUBS AT
 INSTALLATION THAT ARE BEING INSTALLED TO SCREEN THE
 CHARGE BOX, PANELS AND TRANSFORMERS.
  
  
  
  