2022-10-13 00:06:45THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL
 DETAILS, DESIGN CALCULATIONS AND THE POLLUTION
 PREVENTION PLAN WILL BE REVIEWED AS PART OF THE
 ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT
 APPLICATION PROCESSES.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE
 PLAN APPROVAL:
  
 1. OKEECHOBEE BLVD IS MAINTAINED BY FDOT. CONGRESS AVE
 IS MAINTAINED BY PALM BEACH COUNTY. ANY WORK WITHIN
 EITHER R/W WILL REQUIRE APPROVAL FROM THE RESPECTIVE
 AGENCY.
  
 2. REPLACE THE DRIVEWAY APRONS AND DROP CURBS FOR THE
 DRIVEWAYS THAT WILL ARE BEING ELIMINATED FROM THE SITE
 PLAN.
  
 3. INDICATE IF THE EXISTING BOLLARDS ALONG THE SOUTH
 PROPERTY LINE ARE TO BE REMOVED OR REPLACED. THE
 CONSTRUCTION OF THE STORM PIPE MAY HAVE AN IMPACT ON
 SOME OF THE BOLLARDS.
  
 4. CONSIDER PROVIDING 2 FEET OF LANDSCAPE OVERHANG FOR
 THE PARKING SPACES ALONG THE SOUTH PROPERTY LINE AND
 CONSTRUCTING TYPE D CURB INSTEAD OF TYPE F CURB AND
 GUTTER. CONSIDER PROVIDING 2 FEET OF LANDSCAPE OVERHANG
 FOR THE PARKING SPACES ALONG THE EAST PROPERTY LINE.
  
 5. THE EXISTING WEST PIPE TO STRUCTURE #19 IS SHOWN TO
 BE REMOVED ON THE DEMOLITION PLAN BUT A NEW PIPE IS NOT
 SHOWN ON THE PDG PLAN.
  
 6. CONSIDER USING A DIAGONAL HATCH PATTERN ON THE
 DEMOLITION PLAN TO INDICATE THE ITEMS TO BE REMOVED.
  
 7. BE CONSISTENT IN THE VERTICAL DATUM USED ON THE
 SURVEY AND ENGINEERING PLANS. THE SURVEY LISTS
 NGVD1929. THE ENGINEERING PLANS LIST NAVD1988. PROVIDE
 THE CONVERSION EQUATION BETWEEN NGVD1929 AND NAVD1988
 IF NAVD1988 IS USED. LIST THE VERTICAL DATUM AND
 CONVERSION EQUATION (IF APPLICABLE) ON EVERY SHEET WITH
 ELEVATION INFORMATION.
  
 8. INCLUDE PRB???S IN STRUCTURES ATTACHED TO
 EXFILTRATION TRENCHES TO PROLONG THE LIFE OF THE
 EXFILTRATION TRENCHES. PROVIDE A PRB DETAIL.
  
 9. CONSIDER ADDING A TRENCH DRAIN AT THE BOTTOM OF THE
 RAMP ON THE WEST SIDE OF THE PROPOSED BUILDING TO
 COLLECT THE RUNOFF COMING DOWN THE RAMP.
  
 10. THE SURVEY DOES NOT IDENTIFY THE AE13.4 FLOOD ZONE
 AT THE NORTHEAST AREA OF THE SITE.
  
 11. STRUCTURES WITHIN A SPECIAL FLOOD HAZARD AREA ARE
 REQUIRED TO HAVE A MINIMUM OF 2 FEET OF FREEBOARD ABOVE
 THE BASE FLOOD ELEVATION.
  
 12. PROVIDE A SCALE BAR ON THE SURVEY.
  
 13. THE PGD PLAN CALLS OUT TWO CONTROL STRUCTURES.
  
 14. ADD LEADERS TO THE STRUCTURE AND PIPE LABELS. WHERE
 IS STRUCTURE #8?
  
 15. DON???T SHOW ON THE PGD PLAN EXISTING STORM PIPE
 AND STRUCTURES THAT ARE BEING REMOVED.
  
 16. CONTROL STRUCTURE DETAIL LABELS THE WEIR ELEVATION
 AS 13.50 FEET NAVD1988. THE EXFILTRATION TRENCH DETAIL
 LABELS THE WEIR ELEVATION AS 16.50 FT NAVD AND THE
 LOWEST FINISHED GRADE AS 15.00 FT NAVD.
  
 17. LABEL EXISTING UTILITIES (SIZE, MATERIAL) ON THE
 PGD PLAN.
  
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO
 ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL.
  
 1. DRAINAGE SYSTEM TO BE DESIGNED TO MEET SFWMD ERP
 CRITERIA. STORMWATER CALCULATIONS WILL BE REVIEWED WITH
 THE ENGINEERING PERMIT SUBMITTAL.
  
 2. PROVIDE COPY OF SFWMD ERP PERMIT BEFORE START OF
 CONSTRUCTION.
  
 3. PROVIDE EROSION AND SEDIMENT CONTROL PLAN WITH THE
 ENGINEERING PERMIT SUBMITTAL.
  
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120 (O)