Plan Review Notes
Plan Review Notes For Project Z22080030
Project Number Z22080030
Review Stop TRAFFIC
Sequence Number 2
Notes
Date Text
2022-12-01 00:27:201) SATISFIED. PROVIDE COUNTY TPS LETTER
 2) NOT SATISFIED. IN THE TRAFFIC STUDY, PROVIDE TRIP
 GENERATION REFERENCE (I.E. COUNTY TABLE OR ITE LAND USE
 PAGE WITH ADOPTED RATES) AND LATEST SITE MAP IN THE
 APPENDIX. UPDATED TRAFFIC STATEMENT WAS NOT PROVIDED IN
 THE LATEST RESUBMISSION. INSIGNIFICANT DOES NOT HAVE
 ANY MERIT FOR THIS COMMENT. PLEASE PROVIDE THE ACTUAL
 REFERENCE ITE TRIP GENERATION PAGES AND/OR COUNTY TRIP
 GENERATION TABLE. LATEST SITE PLAN WAS NOT PROVIDED IN
 LATEST REVISION. LASTLY, STUDY STILL MENTIONS A FULL
 ACCESS DRIVEWAY ON HOGAN, WHILE LATEST SITE PLAN
 SHOWCASES A ONE WAY DRIVEWAY WITH ENTRANCE FROM HOGAN
 AND EXIT TO 20TH ST
 3) SATISFIED. PROVIDE AN OPERATIONAL ANALYSIS OF THE
 VALET SERVICE
 4) NOT SATISFIED. PROVIDE A TRANSPORTATION SPECIFIC
 SITE PLAN FOR THE GROUND FLOOR. SHOWCASING
 TRANSPORTATION RELATED FEATURES (E.G. ROADWAY WIDTHS,
 DRIVING AISLES, PARKING STALLS, SIDEWALK, CURB, GUTTER,
 DRIVEWAY, GATES, CROSSWALKS, VISIBILITY TRIANGLE,
 CORNER & DRIVEWAY SEPARATION DISTANCES, SLOPES, ETC.)
 PROPERLY LABELED AND DIMENSIONED. THE SITE PLAN SHOULD
 BE NAMED T-1.0
 5) NOT SATISFIED. IN THE T-1.0 SITE PLAN, PLEASE
 SHOWCASE BASIC CURB DETAILS (E.G. DRIVEWAY, CURB CUTS,
 PAVEMENT MARKINGS, PARKING STALLS, ETC.) ON THE
 OPPOSITE SIDE OF THE ROADS SURROUNDING THE PROPOSED
 DEVELOPMENT
 6) NOT SATISFIED. PROVIDE A SIGNAGE AND PAVEMENT
 MARKING PLAN. INCLUSIVE OF ALL FEATURES WITHIN THE
 PROPOSED DEVELOPMENT AND ALONG ALL ROADS FRONTING THE
 SITE. SUCH PLAN IS PART OF THE TRANSPORTATION REVIEW
 AND SHOULD BE NAMED ACCORDINGLY (E.G. T-1.1 OR T-2.0)
 7) SATISFIED. IF PERTINENT, PROVIDE AUTOTURN ANALYSIS
 FOR GARBAGE TRUCK AND/OR SERVICE VEHICLES DRIVING IN
 AND OUT OF THE PROPOSED DEVELOPMENT WITH VEHICLE
 DYNAMIC ENVELOPES AND WHEEL PATHS CLEARLY DISTINCT AND
 DEFINED IN DIFFERENT COLORS. PROVIDE THE ANALYSIS IN A
 SEPARATE SHEET. SUCH PLAN(S) CONTAINING THE ANALYSIS
 ARE PART OF THE TRANSPORTATION REVIEW AND SHOULD BE
 NAMED ACCORDINGLY (E.G. T1.2, T-3.0)
 8) NOT SATISFIED. PROVIDE ENGINEERING REFERENCE AND
 SPECS SHEETS FOR EACH OF THE PROPOSED TRANSPORTATION
 FEATURES (E.G. CURB, RAMP, GATE, SIGNAGE, PAVEMENT
 MARKING, SIGNAL, ADA STALL, BIKE RACK, ETC.)
 9) SATISFIED. PROVIDE NUMBER AND LOCATION OF THE
 REQUIRED BICYCLE PARKING/RACKS
 10) SATISFIED. THE NUMBER OF PROVIDED PARKING STALL IS
 EXCESSIVELY HIGHER THAN THE REQUIRED. PLEASE PROVIDE AN
 EXPLANATION
 11) PARTIALLY SATISFIED. THE ADA STALL IS MISSING THE 5
 FEET SIDE BUFFER. IS THE ACCESS AISLE FLUSH WITH THE
 STALL? OTHERWISE A RAMP WOULD BE REQUIRED
 12) SATISFIED. EXTEND THE EXISTING SIDEWALK SOUTH OF
 THE PROPERTY SO TO CONNECT TO THE PROPOSED PEDESTRIAN
 GATE
 13) SATISFIED. HAS THE DEVELOPMENT ON THE EAST SIDE OF
 THE PROPOSED PARKING LOT BEEN PERMITTED AND UNDER
 CONSTRUCTION?
 14) EXISTING SIDEWALK ALONG DIXIE IS 7-FEET WIDE. SUCH
 WIDTH MUST BE KEPT THROUGHOUT PROPOSED DEVELOPMENT
 FRONTAGE, PLEASE REVISE THE SITE PLAN ACCORDINGLY
  
 VALERIO ORICCHIO
 CITY TRANSPORTATION ENGINEER
 561-494-1092
 [email protected]
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved