2023-06-27 14:37:09THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE
 5/11/2023 SUBMITTAL.
  
 1. [SATISFIED] FLORIDA MANGO IS MAINTAINED BY PALM
 BEACH COUNTY.
  
 2. [SATISFIED] THE CITY'S OFFICIAL VERTICAL DATUM IS
 NGVD1929. THE CITY HAS ALLOWED THE USE OF NAVD1988 AS
 LONG AS THE CONVERSION EQUATION TO NGVD1929 AT THE
 PROJECT LOCATION IS PROVIDED. PROVIDE THE VERTICAL
 DATUM CONVERSION TO NGVD1929 ON THE SURVEY. PROVIDE
 VERTICAL DATUM REFERENCE AND CONVERSION EQUATION ON
 EVERY ENGINEERING SHEET WITH ELEVATION INFORMATION.
  
 3. [SATISFIED] SITE IS WITHIN A SPECIAL FLOOD HAZARD
 AREA. STRUCTURES ARE TO HAVE MINIMUM TWO FEET OF
 FREEBOARD ABOVE THE BASE FLOOD ELEVATION.
  
 4. [SATISFIED - THE BLEEDER IS LOCATED DOWNSTREAM FROM
 WEIR THAT SURCHARGES THE EXFILTRATION TRENCHES.] THE
 CITY DOES NOT ALLOW THE USE OF BLEEDERS WITHIN THE WEIR
 WITH EXFILTRATION TRENCH SYSTEMS.
  
 5. [PARTIALLY SATISFIED - SEE NEW COMMENTS BELOW]
 PROVIDE CROSS SECTIONS FOR ALL SIDES OF THE PROPERTY
 FROM 10 FEET OUTSIDE THE PROPERTY TO THE BUILDING FACE.
 SHOW AND LABEL SURFACE FEATURES, GRADE BREAKS, PROPERTY
 LINE, SURFACE SLOPES, STREET NAMES, ETC.
  
 6. [PARTIALLY SATISFIED - SEE NEW COMMENTS BELOW]
 PROVIDE CROSS SECTIONS AT THE DRIVEWAYS FROM CENTERLINE
 OF THE ROAD TO 5 FEET PAST THE HIGH POINT. SHOW AND
 LABEL SURFACE FEATURES, GRADE BREAKS, RIGHT OF WAY
 LINE, STREET NAME, SURFACE SLOPES, ETC.
  
 7. [PARTIALLY SATISFIED - THE WEIR ELEVATION IS ONLY
 4??? BELOW THE TOP SLAB OF THE CONTROL STRUCTURE. IF
 THE SYSTEM WAS MODELED WITH A H&H MODEL, WHAT WERE THE
 PEAK STAGES OVER THE WEIR?] THE GRATE ELEVATION OF
 STRUCTURES CB#1 AND CB#8 ARE AT OR BARELY HIGHER THAN
 THE WEIR ELEVATION. THERE WILL BE PONDING AROUND THESE
 STRUCTURES WHENEVER THERE IS DISCHARGE INTO THE CANAL.
  
 8. [PARTIALLY SATISFIED - LABEL ON PGD PLANS AND WATER
 & SEWER PLANS] LABEL EXISTING UTILITIES (SIZE,
 MATERIAL).
  
 9. [NOT SATISFIED - TRENCH CUTS INTO THE RIGHT OF WAY
 PAVEMENT TO INSTALL UTILITY SERVICES WILL REQUIRE MILL
 AND OVERLAY PER THE COUNTY DETAILS] SHOW MILL AND
 RESURFACING LIMITS.
  
 10. [SATISFIED] SHOW THE EXISTING CURB AND GUTTER ALONG
 FLORIDA MANGO. SHOW DROP CURB ACROSS THE PROPOSED
 DRIVEWAYS.
  
 11. [SATISFIED] CAN SOUTH DRIVEWAY BE ADJUSTED TO AVOID
 THE EXISTING CATCH BASIN?
  
 12. [SATISFIED] DRIVEWAY APRONS SHOULD BE CONCRETE
 WITHIN THE RIGHT OF WAY.
  
 13. [SATISFIED] SHOW AND LABEL AND PERIMETER BERM THAT
 WILL BE NEEDED.
  
 NEW COMMENTS (5/11/2023 SUBMITTAL)
  
 14. SECTION A-A
  A. SHOULD THE CONCRETE DRIVEWAY DIMENSION EXTEND TO
 THE BACK OF SIDEWALK (WEST PROPERTY LINE)?
  B. LABEL THE R/W AS N. FLORIDA MANGO ROAD.
  
 15. SECTION B-B
  A. SHOULD THE 14??? CONCRETE DRIVEWAY DIMENSION EXTEND
 TO THE BACK OF SIDEWALK (WEST PROPERTY LINE)?
  B. LABEL THE R/W AS N. FLORIDA MANGO ROAD.
  
 16. SECTIONS D-D, E-E, F-F, G-G
  A. IN ADDITION TO THE PERIMETER BERM AT OR NEAR THE
 PROPERTY LINE, SHOW A SWALE WITHIN THE BERM TO PREVENT
 DIRECT RUNOFF TO THE ADJACENT PROPERTIES.
  
 17. PROVIDE WRITTEN RESPONSES EXPLAINING HOW THESE
 COMMENTS WERE ADDRESSED.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120 (O)
 [email protected]
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved