| 2022-09-06 16:19:05 | PLEASE PROVIDE WRITTEN RESPONSES TO THE FOLLOWING: |
| | -SOUTHWESTERN PROPOSED DRIVEWAY FLARE IS EXTENDING PAST |
| | PROPERTY LINE. |
| | -SHOW AND LABEL 12 FOOT D.E. RUNNING THROUGH PROPERTY |
| | ON CIVIL PLANS AS SHOWN ON SURVEY. |
| | -40 FOOT CANAL EASEMENT IS NOT SHOWING ON CIVIL PLANS |
| | AS SHOWN ON SURVEY. PLEASE UPDATE. |
| | -SURVEY NOTE NUMBER 5 SAYS THAT THERE MAY BE ADDITIONAL |
| | EASEMENTS OR RESTRICTIONS NOT SHOWN ON SURVEY. |
| | -ADD DEMO PLAN SHEET TO ENGINEERING PLAN SET IF THERE |
| | WILL BE DEMOLITION. |
| | -SHOW AND LABEL EXISTING AND PROPOSED RIGHT OF WAY |
| | SIDEWALK. |
| | -WILL THE NORTHERN SWING GATE HIT THE DUMPSTER |
| | STRUCTURE WHEN OPENS? ALSO WILL THAT SWING GATE HIT |
| | VEHICLES TRAVELING NORTH PAST IT? |
| | -WILL MARQUEE SIGN REMAIN, OR IS REPLACEMENT PROPOSED? |
| | ALSO, PLEASE SHOW AND LABEL IT ON ENGINEERING PLANS. |
| | -SHOW AND LABEL ALL UTILITY POLES AND LIGHT POLES NEAR |
| | PROPERTY AND WHAT IS HAPPENING TO THEM. |
| | -HISTORIC PICTURES SHOW EXISTING FENCES AT SOUTH AND |
| | EAST SIDES OF PROPERTY. WHO OWNS THOSE FENCES AND ARE |
| | THE PROPOSED FENCES ADDITIONS OR REPLACEMENTS? |
| | -PROPOSED SOUTHWESTERN DRIVEWAY LOOKS TO CONFLICT WITH |
| | EXISTING STORM STRUCTURE. |
| | -UTILITY BILLING SYSTEM IS SHOWING EXISTING FIRELINE |
| | WATER SERVICE FOR THE ADDRESS. VERIFY IF THAT IS |
| | CORRECT AND IF SO, SHOW AND LABEL ON PLANS. |
| | -VERIFY IF PROPOSED PRIVATE FIRE SYSTEM WILL HAVE ANY |
| | AUXILIARY WATER SUPPLIES SUCH AS WELLS CONNECTED TO IT. |
| | -EXISTING DOMESTIC METER SIZE IS 1.5 INCH PER UTILITY |
| | BILLING SYSTEM. |
| | -ADD WATER AND SEWER DEMAND CALCULATIONS TO WATER PLAN. |
| | -SHOW AND LABEL EXISTING SEWER LATERAL AND WHAT IS |
| | HAPPENING TO IT. |
| | -CALLOUT HORIZONTAL CLEARANCE DISTANCE BETWEEN SEWER |
| | LATERAL AND POTABLE PLUMBING. |
| | -ARCHITECTURAL PLAN SHOWS ADDITIONAL DUMPSTER NOT SHOWN |
| | ON ENGINEERING PLAN. |
| | -ADD ENGINEERING PLAN SHEET SHOWING RV PARKING BEFORE |
| | PHASE II IS COMPLETE. |
| | -ON LP2, SOME OF THE RV PARKING SPOTS LOOK PROBLEMATIC |
| | WHERE THE RV?S MAY HIT THE SWING GATES COMING OUT OF |
| | THE PARKING SPOTS. |
| | -WILL THE IRRIGATION RUN OFF OF DOMESTIC WATER SERVICE, |
| | OR IS A SEPARATE METERED IRRIGATION WATER SERVICE |
| | NEEDED? |
| | RESPECTFULLY, |
| | MARK HURLEY [email protected] |
| |