Plan Review Notes
Plan Review Notes For Project Z22080023
Project Number Z22080023
Review Stop STORM
Sequence Number 2
Notes
Date Text
2023-01-09 13:28:10THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE
 11-22-2022 SUBMITTAL:
  
 1. [PARTIALLY SATISFIED] THE CITY???S OFFICIAL VERTICAL
 DATUM IS NGVD1929. THE CITY HAS ALLOWED THE USE OF
 NAVD1988 AS LONG AS THE CONVERSION EQUATION TO NGVD1929
 AT THE PROJECT LOCATION IS PROVIDED. PROVIDE THE
 VERTICAL REFERENCE AND DATUM CONVERSION TO NGVD1929 ON
 EACH ENGINEERING PLAN SHEET WITH ELEVATION INFORMATION.
 ADDITIONAL COMMENT: ADD REQUESTED INFORMATION TO SHEETS
 C-200, C-201, C-600, C-601, T-1.0, T-1.1, T-2.0, T-2.1,
  
 2. S. DIXIE HWY IS MAINTAINED BY FDOT. FDOT TO APPROVE
 ALL PROPOSED IMPROVEMENTS WITHIN THE R/W.
  
 3. [SATISFIED ??? SEE ADDITIONAL COMMENTS BELOW]
 PROVIDE CROSS SECTIONS FROM CENTERLINE OF RIGHTS OF WAY
 AND THE EAST PROPERTY LINES TO THE BUILDING FACES. SHOW
 AND LABEL SURFACE FEATURES, GRADE BREAKS, GENERAL
 SURFACE SLOPES, FINISHED FLOOR ELEVATION, RIGHT OF WAY
 LINES WITH THE STREET IDENTIFIED, DIMENSIONS FROM RIGHT
 OF WAY TO SURFACE FEATURES. IT APPEARS FFE ARE 1 FT OR
 HIGHER THAN R/W GRADES.
  
 4. [NOT SATISFIED] PROVIDE CROSS SECTIONS FOR ALL
 DRIVEWAYS FROM THE CENTERLINE OF THE ROAD TO 5 FEET
 PAST THE HIGH POINT OF THE DRIVEWAY. SHOW AND LABEL THE
 RIGHT OF WAY LINE, R/W STREET NAME, SURFACE FEATURES,
 SURFACE SLOPES, GRADE BREAKS, ETC.
  
 5. [SATISFIED] SUGGEST PUTTING TRENCH DRAINS AT THE
 BACK OF SIDEWALKS (AND OUTSIDE THE R/W) TO REDUCE
 TRIPPING HAZARD.
  
 6. [NOT SATISFIED] PROVIDE SURFACE FLOW ARROWS ON THE
 GRADING AND DRAINAGE PLANS.
  
 7. [SATISFIED] LABEL EXISTING UTILITIES (SIZE,
 MATERIAL).
  
 8. [NOT SATISFIED ??? HATCHING NOT FOUND ON SHEETS
 T-1.1 (OR T-1.0)] SHOW MILL AND RESURFACING LIMITS THAT
 MEET CITY DETAILS.
  
 9. [SATISFIED] PROVIDE STRIPING PLAN FOR DISTURBED
 PAVEMENT AREAS.
  
 NEW COMMENTS (11/22-2022 SUBMITTAL)
  
 10. TWO SHEETS NUMBERED T-2.0 AND TWO SHEETS NUMBERED
 T-2.1.
  
 11. PROVIDE SIGN LEGEND ON SHEETS T-1.0 AND T-1.1.
  
 12. DEMOLITION PLAN SHEET C-200 CALLS OUT THE REMOVAL
 OF THE EXISTING FDOT DRAINAGE STRUCTURE ON S. DIXIE HWY
 SOUTH OF FLAMINGO DRIVE. THE CONCEPTUAL GRADING AND
 DRAINAGE PLAN DOES NOT SHOW THE STRUCTURE BEING
 REPLACED. WILL IT BE CONVERTED TO A MANHOLE TOP? HOW
 WILL SURFACE RUNOFF ON S. DIXIE HWY ENTER THE DRAINAGE
 SYSTEM?
  
 13. DEMOLITION PLAN SHEET C-201 CALLS OUT THE REMOVAL
 OF THE EXISTING FDOT DRAINAGE STRUCTURE ON S. DIXIE HWY
 SOUTH OF BARCELONA ROAD. THE CONCEPTUAL GRADING AND
 DRAINAGE PLAN DOES NOT SHOW THE STRUCTURE BEING
 REPLACED. WILL IT BE CONVERTED TO A MANHOLE TOP? HOW
 WILL SURFACE RUNOFF ON S. DIXIE HWY ENTER THE DRAINAGE
 SYSTEM?
  
 14. PROVIDE PROPOSED EDGE OF PAVEMENT ELEVATIONS FOR
 THE CURB AND GUTTER AND VALLEY GUTTER ON S. DIXIE
 HIGHWAY. FDOT MAY REQUIRE SPREAD CALCULATIONS TO SEE
 HOW MUCH OF THE TRAVEL MAY BE AFFECTED BY THE
 RELOCATION OF THE CURB AND GUTTER AND ELIMINATION OF
 DRAINAGE STRUCTURES.
  
 15. PROVIDE PROPOSED EDGE OF PAVEMENT ELEVATIONS FOR
 THE CURB AND GUTTER AND VALLEY GUTTER ON FLAMINGO
 DRIVE.
  
 16. SOUTH CURB LINE ON FLAMINGO DRIVE IS BEING MOVED
 TOWARD THE CENTERLINE BY ~5 FEET. HOW WILL THE PROPOSED
 CURB CONNECT INTO THE EXISTING CURB LINE EAST OF THE
 PROJECT SITE?
  
 17 LABEL THE STREET NAMES ON THE SECTIONS ON SHEETS
 C-400 AND C-401.
  
 18. SECTION A-A???
 A. INDICATE WHERE THE TRAVEL LANE CONSTRUCTION WILL
 MATCH EXISTING ELEVATION.
 B. CONFIRM NONE OF THE SIDEWALK CROSS SLOPE WILL EXCEED
 2 PERCENT.
  
 19. SECTION B-B???
 A. REVIEW THE DIMENSIONS FOR THE PROPOSED TRAVEL LANE
 (13 FEET FROM ROAD CENTERLINE TO EDGE OF PAVEMENT
 ADJACENT TO THE VALLEY GUTTER) AND PROPOSED PARKING (11
 FEET FROM FACE OF D???CURB TO EDGE OF TRAVEL LANE ???
 INCLUDES THE VALLEY GUTTER). IN PLAN VIEW, THE PROPOSED
 EDGE OF PAVEMENT IS 13.5 FEET FROM THE ROAD CENTERLINE
 AND 10.5 FEET FROM THE FACE OF PROPOSED D-CURB.
 B. CONFIRM NONE OF THE SIDEWALK CROSS SLOPE WILL EXCEED
 2 PERCENT.
 C. THE EXISTING CROWN OF ROAD APPEARS TO BE 5 FEET
 SOUTH OF THE ROAD CENTERLINE.
  
 20. SECTION C-C???
  A. PLAN VIEW APPEARS TO SHOW A CURB ALONG THE WEST
 SIDE OF THE TRAVEL LANE.
  
 21. SECTION E-E???
 A. INDICATE WHERE THE TRAVEL LANE CONSTRUCTION WILL
 MATCH EXISTING ELEVATION.
 B. THE EXISTING ROAD CROWN APPEARS TO BE APPROX.. 4
 FEET WEST OF THE ROAD CENTERLINE.
  
 22. SECTION F-F???
 A. INDICATE WHERE THE TRAVEL LANE CONSTRUCTION WILL
 MATCH EXISTING ELEVATION.
  
 23. FOR ENGINEERING PERMIT, PROVIDE PLAN AND PROFILE
 SHEET OF THE RECONSTRUCTION OF BARCELONA ROAD FROM THE
 CENTERLINE OF S. DIXIE HWY TO APPROXIMATELY 230 FEET
 EAST OF THE S. DIXIE HWY CENTELINE. SHOW PROFILES OF
 ALL UTILITIES WITHIN THE R/W AND CROSS SECTIONS OF THE
 UTILITIES CROSSING THESE UTILITIES.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120 (O)
 561-351-0510 (M)
 [email protected]
  