Date Text
2022-09-06 09:20:00*** THE PROJECT AREA DOES NOT MATCH THE INFORMATION
 PROVIDED IN THE SIGNED AND SEALED SURVEY AND AS A
 RESULT, THE CALCULATIONS FOR THE PROJECT ARE
 INCONSISTENT AND EXCEEDS THE STANDARDS/REQUIREMENTS OF
 THE CITY'S COMPREHENSIVE PLAN AND ZONING AND LAND
 DEVELOPMENT REGULATIONS (ZLDRS). ADDITIONALLY, PER SEC.
 94-207(A)(1)(B), THE DENSITY AND INTENSITY OF A PROJECT
 CANNOT EXCEED THE DENSITY AND INTENSITY STANDARDS
 PROVIDED IN COMPREHENSIVE PLAN, FUTURE LAND USE ELEMENT
 POLICY 1.1.3. ***
  
 GENERAL COMMENTS:
  
 1.) AS MENTIONED BY STAFF DURING THE PRE-APPLICATION
 MEETING WITH THE APPLICANT, PUBLIC OUTREACH ON THE
 PROPOSED DEVELOPMENT PROJECT IS CRITICAL (AND PRIOR TO
 THE FORMAL SUBMITTAL OF THE PROJECT). DOCUMENTATION OF
 ANY PUBLIC OUTREACH (AND RESULTS/FEEDBACK FROM THESE
 MEETINGS) WITH THE SURROUNDING NEIGHBORS IS REQUIRED
 AND SHALL BE SUBMITTED TO PLANNING STAFF.
  
 2.) THE MAXIMUM ALLOWABLE FAR IS 1.5 (RESIDENTIAL +
 NON-RESIDENTIAL). BASED ON THE INFORMATION PROVIDED IN
 THE PLAN SET, THE PROPOSED FAR FOR THE PROJECT IS 1.62,
 WHICH EXCEEDS THE MAXIMUM AND IS NOT PERMITTED. PLEASE
 ADJUST PROJECT TO COMPLY. [ZLDR S.94-145(8)(D)]
  
 3.) THE MAXIMUM ALLOWABLE RESIDENTIAL DENSITY HAS BEEN
 EXCEEDED. PER ZLDR S.94-145(9)(B), THE MAXIMUM
 ALLOWABLE DENSITY IS 32.27 DU/ACRE. THE PROPOSED
 PROJECT CURRENTLY HAS A DENSITY OF 32.7 DU/ACRE WHICH
 IS NOT PERMITTED. PLEASE ADDRESS.
  
 4.) THE PROJECT DOES NOT APPEAR TO FACTOR IN THE
 BUILDING HEIGHT SETBACK ADJACENT TO RESIDENTIAL ZONING
 DISTRICTS. PER THE ZLDRS, IF A STRUCTURE ABUTS A
 RESIDENTIAL ZONING DISTRICT IN EXCESS OF 30 FT., THE
 FOLLOWING ADDITIONAL SETBACK SHALL BE PROVIDED: A) 1
 FT. OF HEIGHT ABOVE 30 FT. FOR EACH 2 FT. OF SETBACK
 WHEN ABUTTING A SINGLE-FAMILY RESIDENTIAL ZONING
 DISTRICT AND B) 1 FT. OF HEIGHT ABOVE 30 FT. FOR EACH 1
 FT. OF SETBACK WHEN ABUTTING ANY MULTIFAMILY
 RESIDENTIAL ZONING DISTRICT. THE BUILDING HEIGHT
 SETBACK IS IN ADDITION TO THE MINIMUM SETBACK
 REQUIREMENTS PROVIDED IN ZLDR S.94-145(2). [ZLDR
 S.94-145(6)]
  
 5.) PROJECT INFORMATION IS INCONSISTENT THROUGHOUT THE
 JUSTIFICATION STATEMENT. PLEASE REVISE JUSTIFICATION
 STATEMENT TO ADDRESS ANY CORRECTIONS/INACCURACIES.
  
 6.) JUSTIFICATION ON THE REQUESTED WAIVERS NEED TO BE
 EXPANDED TO IDENTIFY ANY MITIGATION MEASURES AND
 BENEFITS OF EACH WAIVER REQUEST TO THE GENERAL
 PUBLIC/SURROUNDING NEIGHBORHOOD.
  
 7.) TABLES PRESENTED WITHIN THE PLAN SET DOES NOT
 EFFECTIVELY PRESENT INFORMATION AND CAN BE IMPROVED
 AND/OR SIMPLIFIED. ALSO, DATA/CALCULATIONS PRESENTED
 ARE EITHER INCORRECT/INCOMPLETE OR DIFFICULT TO
 UNDERSTAND. PLEASE CONTACT STAFF FOR EXAMPLES ON DATA
 PRESENTATION (IF NECESSARY).
  
 8.) PLANNED DEVELOPMENTS ARE NOT PERMITTED IN HISTORIC
 DISTRICTS. THEREFORE, ALL PD ASSOCIATED ZONING
 REQUIREMENTS MUST BE ADDRESSED ON THE PARCEL(S) OF THE
 PROPOSED CPD. THERE APPEARS TO BE A PROPOSED LANDSCAPE
 BUFFER ON THE PROPERTY OF 309 BARCELONA (WITHIN THE EL
 CID HISTORIC DISTRICT). THIS IS NOT PERMITTED. [ZLDR
 S.94-207(A)(2)]
  
 9.) REQUIRED OWNER'S CONSENT FORMS HAVE NOT BEEN
 PROPERTY EXECUTED. PLEASE ADDRESS.
  
 10.) A TRAFFIC PERFORMANCE STANDARDS (TPS) REVIEW
 LETTER FROM THE PALM BEACH COUNTY TRAFFIC DIVISION IS
 REQUIRED (561-684-4030). ALL INFORMATION PROVIDED IN
 THE TPS LETTER MUST MATCH PROJECT INFORMATION FOR
 CONSISTENCY.
  
 11.) INFORMATION IN THE TRAFFIC STUDY (PREPARED BY
 BRYAN G. KELLEY, P.E., OF SIMMONS AND WHITE, DATED
 8/8/2022) IS INCONSISTENT WITH THE PROJECT INFORMATION
 PRESENTED IN THE PLAN SET (I.E. BUILDING SQUARE
 FOOTAGE; ALSO, RESIDENTIAL DENSITY PROPOSED (59 UNITS)
 IS NOT PERMITTED AS IT EXCEEDS THE MAXIMUM ALLOWABLE
 DENSITY). PLEASE ADDRESS FOR CONSISTENCY.
  
 12.) INFORMATION IN THE SHARED PARKING STATEMENT
 (PREPARED BY BRYAN G. KELLEY, P.E., OF SIMMONS AND
 WHITE, DATED 8/8/2022) IS INCONSISTENT WITH THE PROJECT
 INFORMATION PRESENTED IN THE PLAN SET (I.E. BUILDING
 SQUARE FOOTAGE; ALSO, RESIDENTIAL DENSITY PROPOSED (59
 UNITS) IS NOT PERMITTED AS IT EXCEEDS THE MAXIMUM
 ALLOWABLE DENSITY). PLEASE ADDRESS FOR CONSISTENCY.
  
 13.) A NEW SCAD LETTER FROM THE SCHOOL DISTRICT OF PALM
 BEACH COUNTY IS REQUIRED. THE SCAD LETTER INCLUDED IN
 THE APPLICATION SUBMITTAL CONTAINS OUTDATED INFORMATION
 AND IS EXPIRED. INFORMATION IN THE SCAD LETTER MUST
 MATCH THE PROJECT INFORMATION FOR CONSISTENCY.
  
 14.) THE HEIGHT OF STRUCTURES, INCLUDING EXEMPT ITEMS
 OR EQUIPMENT, SHALL NOT EXCEED LIMITATIONS PRESCRIBED
 BY THE FEDERAL AVIATION ADMINISTRATION (FAA) WITHIN
 DESIGNATED FLIGHT APPROACH PATTERNS OF AIRPORTS OR
 RELATED AVIATION FACILITIES. ALTHOUGH STAFF DOES NOT
 BELIEVE THIS WILL BE AN ISSUE, PLEASE PROVIDE A LETTER
 FROM THE FAA INDICATING THAT THE PROPOSED PROJECT IS NO
 HAZARD TO AIR NAVIGATION. [ZLDR S.94-306(B)]
  
 15.) AN ADDRESS LIST, RADIUS MAP AND EXECUTED ADDRESS
 LIST AFFIDAVIT IS REQUIRED PER THE INSTRUCTIONS ON PAGE
 4 OF THE 2022 DEVELOPMENT APPLICATION. THIS INFORMATION
 WAS NOT INCLUDED IN THE APPLICATION SUBMITTAL.
  
 16.) PROVIDE WRITTEN CONFIRMATION THAT THE PUBLIC
 UTILITIES DEPARTMENT HAS REVIEWED THE PROPOSAL FOR
 WATER, SEWAGE TREATMENT, STORM DRAINAGE AND GARBAGE
 COLLECTION SERVICES. PLEASE CONTACT THE CITY OF WEST
 PALM BEACH ENGINEERING SERVICES DEPARTMENT
 (561-494-1117).
  
 17.) PROVIDE LETTERS FROM ALL PUBLIC UTILITIES
 CONFIRMING THAT THE PROPOSED PROJECT DOES NOT ENCROACH
 INTO THEIR EASEMENTS OR OTHERWISE INTERFERE WITH THE
 PROVISIONS OF THEIR SERVICES.
  
 18.) PER SEC. 94-207(B)(10)(C), THE APPLICATION SHALL
 INCLUDE THE PROPOSED SCHEDULE OF DEVELOPMENT WHICH
 IDENTIFIES THE ANTICIPATED PROJECT START AND COMPLETION
 DATES, STAGES OF DEVELOPMENT (IF ANY), AND THE AREA AND
 LOCATION OF COMMON OPEN SPACE TO BE PROVIDED AT EACH
 STAGE. THIS INFORMATION HAS NOT BEEN PROVIDED IN THE
 APPLICATION SUBMITTAL.
  
 19.) ALL PLAN SHEETS SHALL MATCH FOR CONSISTENCY. NOT
 ALL PLAN SHEETS MATCH. PLEASE ENSURE ALL PLAN SHEETS
 MATCH PRIOR TO THE RESUBMITTAL.
  
  
 SITE PLAN COMMENTS:
  
 1) ANY PETITION FOR A PLANNED DEVELOPMENT SHALL BE
 ACCOMPANIED BY A MASTER DEVELOPMENT PLAN OF THE
 DEVELOPMENT COMPRISED OF THE ELEMENTS LISTED IN SEC.
 94-207(B)(9) AND THE SITE PLAN CHECKLIST ON PAGE 16/30
 OF THE 2022 DEVELOPMENT APPLICATION. THE MASTER
 DEVELOPMENT PLAN IS REQUIRED TO SHOW THE PROJECT IN
 RELATIONSHIP TO ITS IMMEDIATE SURROUNDINGS AND WITH
 EXISTING STRUCTURES. IT IS ALSO CRITICAL TO INCLUDE ALL
 RELEVANT INFORMATION/DATA IN THE PLAN (I.E.
 BUILDING/STRUCTURAL SETBACKS, CRITICAL DIMENSIONS,
 BICYCLE PARKING, ZONING AND WAIVER TABULARS, ETC.).
  
 2.) A WAIVER TABULAR, SPECIFYING EACH WAIVER REQUESTED
 FOR THE PROJECT AND ANY PERTINENT INFORMATION (I.E.
 REFERENCE CODE SECTION, INFORMATION ON
 REQUIRED/PROPOSED, ETC.) SHALL BE INCLUDED IN THE PLAN
 SET FOR REFERENCE.
  
 3.) THE FOLLOWING SHEETS ARE MISSING FROM THE PLAN SET
 (REFERENCE: COVER SHEET A0.00): A) OPEN SPACE DIAGRAM
 (A0.04) B) BUILDING SECTION (A3.01)
  
 4.) MORE INFORMATION IS REQUIRED ON THE CALCULATIONS
 FOR THE MAXIMUM LOT COVERAGE BY BUILDINGS (MAXIMUM IS
 60%; PROVIDED 68%). ILLUSTRATE WITH DIAGRAMS WHERE
 NECESSARY. [ZLDR S.94-145(3)]
  
 5.) MORE INFORMATION IS REQUIRED ON THE CALCULATIONS
 FOR MAXIMUM LOT COVERAGE BY IMPERMEABLE SURFACE
 (MAXIMUM IS 85%); NO INFORMATION ON THE PROVIDED
 IMPERVIOUS SURFACE COVERAGE. ILLUSTRATE WITH DIAGRAMS
 WHERE NECESSARY TO DEMONSTRATE COMPLIANCE. [ZLDR
 S.94-145(4)]
  
 6.) MORE INFORMATION IS REQUIRED ON THE MINIMUM OPEN
 SPACE AND LANDSCAPE AREA CALCULATIONS. ILLUSTRATE WITH
 DIAGRAMS WHERE NECESSARY. [ZLDR S.94-145(5)]
  
 7.) PLANS MUST CLEARLY SHOW THE PROVIDE BUILDING
 SETBACKS FOR THE PROJECT. THE BUILDING SETBACK IS
 MEASURED FROM THE OUTSIDE WALL(S) OF THE BUILDING TO
 THE PROPERTY LINE(S). ADDITIONALLY, INCLUDE DIMENSIONS
 FOR ALL STRUCTURAL OVERHANGS, INCLUDING BUT NOT LIMITED
 TO BALCONIES, CORNICES, BUTTERS, EAVES AND ROOF
 OVERHANG PROJECTIONS; STRUCTURAL OVERHANGS SHALL NOT
 EXTEND FARTHER THAN 33 FT. INTO A REQUIRED SETBACK.
 [ZLDR S.94-305(B)(2)]
  
 8.) ARCHITECTURAL ELEVATIONS SHOW AWNINGS. AWNINGS
 SHALL NOT PROJECT MORE THAN 4 FT. INTO ANY REQUIRED
 SETBACK OR BE SUPPORTED BY ANY MEANS OTHER THAN
 ATTACHMENT TO THE BUILDING. IF AWNINGS ARE PROPOSED,
 THE AWNING MUST BE CLEARLY LABELED/IDENTIFIED IN THE
 PLANS; THE OUTLINE FOR THE AWNING MUST HAVE DIMENSIONS
 TO DEMONSTRATE COMPLIANCE WITH THE ZLDRS. ADDITIONALLY,
 IF THE AWNING ENCROACHES BEYOND THE PROPERTY LINE AND
 INTO A RIGHT-OF-WAY, ADDITIONAL APPROVALS FROM THE
 REGULATING AGENCY WILL BE REQUIRED. [ZLDR
 S.94-305(B)(5)]
  
 9.) AT ANY ROAD INTERSECTIONS, VISIBILITY SHALL NOT BE
 OBSCURED BY THE CONSTRUCTION, PLACEMENT, OR MAINTENANCE
 OF A STRUCTURE WALL, SIGN, FENCE, BERM, PLANT MATERIAL,
 SHRUBS OR ANY SIMILAR ITEM BETWEEN 18 INCHES OR 8 FT.
 WITHIN THE VISIBILITY TRIANGLE. BASED ON STAFF?S REVIEW
 OF THE ARCHITECTURAL ELEVATIONS, THERE ARE AWNINGS
 ILLUSTRATED ON THE BUILDING WHICH APPEARS TO ENCROACH
 INTO THE VISIBILITY TRIANGLE. PLEASE ADDRESS FOR
 CONSISTENCY WITH THE ZLDRS AND PLAN SET. [ZLDR
 S.94-305(E)]
  
 10.) IN NON-RESIDENTIAL DISTRICTS, NO FENCE, HEDGE OR
 WALL SHALL EXCEED 8 FT. IN HEIGHT WITHIN THE REQUIRED
 SIDE AND REAR SETBACKS. FENCES/WALLS SHALL NOT EXCEED
 48 INCHES IN HEIGHT WITHIN THE REQUIRED FRONT SETBACK.
 SHOW HEIGHT (AND DETAIL, IF APPLICABLE) OF ALL WALL
 SEGMENTS PROPOSED WITHIN THE PROJECT TO DEMONSTRATE
 COMPLIANCE. [ZLDR S.94-302(C)]
  
 11.) THE MAXIMUM NUMBER OF ACCESS POINTS TO A PUBLIC
 RIGHT-OF-WAY IS TWO (2). THERE APPEARS TO BE THREE (3)
 ACCESS POINTS FOR THE EL FLAMINGO BUILDING ALONG
 FLAMINGO DRIVE. PLEASE ADDRESS. [ZLDR S.94-312(1)(A)]
  
 12.) THE PROJECT DOES NOT COMPLY WITH THE MINIMUM
 REQUIREMENTS FOR SEPARATION OF ACCESS POINTS. PLEASE
 ADDRESS. [ZLDR S.94-312(2)]
  
  
 PARKING COMMENTS:
  
 1.) PARKING CALCULATIONS REQUIRE FURTHER BREAKDOWN OF
 USES (I.E. NUMBER OF SEATS, SQUARE FOOTAGES, RESERVED
 SPACES, ETC.). TO CLEARLY SHOW PARKING REQUIREMENTS AND
 HOW THEY?VE BEEN MET. ALSO, THE PARKING CALCULATIONS
 PROVIDED ARE INACCURATE AND MUST BE CORRECTED FOR
 ACCURACY (I.E. RETAIL SQUARE FOOTAGE; WHERE?S THE
 GALLERY?).
  
 2.) SHARED PARKING ANALYSIS (PREPARED BY BRYAN G.
 KELLEY, P.E., OF SIMMONS & WHITE, DATED 8/8/2022) AND
 CALCULATIONS APPEAR TO BE INCONSISTENT WITH THE
 REQUIREMENTS OF SEC. 94-484. ADDITIONALLY, PARKING
 SPACES WHERE ARE RESERVED FOR USE BY SPECIFIED
 INDIVIDUALS OR CLASSES OF INDIVIDUALS SHALL NOT BE
 COUNTED TOWARDS MEETING THE SHARED PARKING
 REQUIREMENTS. PLEASE ADDRESS FOR CONSISTENCY WITH THE
 ZLDRS. [ZLDR S.94-484]
  
 3.) PLEASE IDENTIFY THE LOCATION OF TURNAROUND SPACES
 IN THE PARKING GARAGE(S) WHERE NECESSARY TO ADDRESS
 ADEQUATE VEHICULAR CIRCULATION.
  
 4.) PROVIDE AN AUTO-TURN DIAGRAM FOR LOADING. PLEASE
 NOTE THAT CONFIGURATION WHICH REQUIRE BACKING DIRECTLY
 ONTO A STREET FROM A PARKING OR LOADING SPACE FOR A
 MIXED-USE PROJECT IS PROHIBITED IN ALL RESIDENTIAL AND
 NON-RESIDENTIAL ZONING DISTRICTS. THERE SHALL BE A
 MINIMUM OF 10 FT. BETWEEN ACCESS DRIVES. ALSO, PLEASE
 NOTE THAT THE JUSTIFICATION STATEMENT MENTIONS THE
 AUTO-TURN DIAGRAM WHICH HAS NOT BEEN FOUND. [ZLDR
 S.94-485(J)]
  
 5.) ALL NECESSARY DIMENSIONS IN THE PARKING LAYOUT
 SHALL BE PROVIDED IN THE PLANS TO DEMONSTRATE
 COMPLIANCE WITH THE ZLDRS. [ZLDR S.94-485(N)(2)]
  
 6.) IN ADDITION TO THE PARKING LAYOUT FOR THE PROJECT,
 A PARKING STALL DETAIL IN COMPLIANCE WITH THE MINIMUM
 REQUIREMENTS OF THE ZLDRS SHALL BE PROVIDED. THE DETAIL
 MUST BE INCLUDED TO DEMONSTRATE COMPLIANCE WITH THE
 ZLDRS. [ZLDR S.94-485(N)]
  
 7.) ARE ANY COMPACT PARKING SPACES PROPOSED IN THE
 PROJECT? IF SO, INFORMATION ON THE COMPACT PARKING
 SPACES SHALL BE PROVIDED/COMPLY WITH THE COMPACT
 PARKING REQUIREMENTS OF THE ZLDRS. [ZLDR S.94-485(N)]
  
 8.) IS THERE ANY ON-STREET PARKING PROPOSED FOR THE
 PROJECT? IF SO, PLEASE PROVIDE MORE INFORMATION (I.E.
 LOCATION, DIMENSIONS, CALCULATIONS, ETC.).
  
 9.) THERE IS INSUFFICIENT INFORMATION PROVIDED ON
 ACCESSIBLE PARKING SPACES. PLEASE PROVIDE CALCULATIONS
 (REQUIRED AND PROPOSED) AND SHOW LOCATION OF ACCESSIBLE
 PARKING SPACES WITHIN THE PLANS TO DEMONSTRATE
 COMPLIANCE/CONSISTENCY WITH THE ZLDRS. [ZLDR
 S.94-485(O)]
  
 10.) REQUIRED/PROPOSED LOADING SPACE
 INFORMATION/CALCULATIONS MISSING FROM THE PLAN SET.
 [ZLDR S.94-485(P)]
  
 11.) BICYCLE PARKING REQUIREMENT FOR THE PROJECT HAS
 NOT BEEN ADDRESSED. THE PLANS MUST SHOW THE
 CALCULATIONS (REQUIRED AND PROVIDED), LOCATION AND
 DETAIL CONSISTENT WITH THE ZLDRS AND THE CITY?S BICYCLE
 PARKING GUIDELINES (CONTACT STAFF FOR DOCUMENT). [ZLDR
 S.94-485(Q)]
  
 12.) WHEEL STOPS ARE ILLUSTRATED FOR ALL TANDEM PARKING
 SPACES. TO ACCURATELY DEPICT THE FUNCTION OF THE TANDEM
 PARKING SPACES, THE WHEEL STOPS SHOULD BE REMOVED FROM
 THE OUTER STALL OF THE TANDEM PARKING. ALSO, PLANS MUST
 ALSO SHOW WHICH TANDEM SPACES ARE RESERVED FOR
 RESIDENTIAL AND WHICH ARE RESERVED FOR VALET (PER
 JUSTIFICATION STATEMENT).
  
 13.) A NOTE CLEARLY STATING THAT THE TANDEM PARKING
 SPACES WILL BE CLEARLY MARKED AND RESERVED FOR
 VALET/RESIDENTIAL SHALL BE PROVIDED IN THE PLANS.
  
  
 ARCHITECTURAL COMMENTS:
  
 1.) BUILDING HEIGHT INFORMATION INCOMPLETE IN THE
 ELEVATIONS. PLEASE PROVIDE MEASUREMENTS IN ACCORDANCE
 AND CONSISTENT WITH SEC. 94-145 (GENERAL COMMERCIAL
 DISTRICT), SEC. 94-306 (HEIGHT EXCEPTIONS) AND SEC.
 94-611 (HEIGHT OF STRUCTURE).
  
 2.) PLEASE ADDRESS THE FOLLOWING IN THE FLOOR PLANS: A)
 PROVIDE A LEGEND THAT IDENTIFIES WHAT THE COLOR
 COORDINATION MEANS. B) NOT ALL SPACES IN THE FLOOR PLAN
 SHEETS HAVE BEEN LABELED. THIS IS CRITICAL TO DETERMINE
 IF THE SPACES SHOULD/SHOULD NOT BE INCLUDED IN THE FAR
 CALCULATIONS. C) NOTATE NON AIR-CONDITIONED SPACES. IT
 IS IMPORTANT IN VERIFYING WHETHER OR NOT SPACES SHOULD
 BE INCLUDED IN THE FAR CALCULATIONS.
  
 3.) IN THE FAR BUILDING AREA TABLE (SHEET A0.03), WHAT
 ARE THE NOTATIONS IN THE PARENTHESIS?
  
 4.) HOW MANY BEDROOMS ARE PROVIDED IN THE GROUND LEVEL
 FLATS? THE INFORMATION SHOULD BE NOTATED IN THE PLANS.
  
  
 LIGHTING/PHOTOMETRIC COMMENTS:
  
 1.) NO LIGHTING/PHOTOMETRIC PLAN/INFORMATION PROVIDED
 WITH THE APPLICATION SUBMITTAL. PER ZLDR
 S.94-207(D)(8), ANY SOURCE OF ILLUMINATION LOCATED WITH
 A CPD SHALL NOT EXCEED ONE FOOTCANDLE AT OR BEYOND THE
 BOUNDARIES OF SUCH DEVELOPMENT. PLEASE PROVIDE
 INFORMATION AND A PHOTOMETRIC PLAN TO DEMONSTRATE
 COMPLIANCE; SETBACK DIMENSIONS FROM POLE FIXTURE(S) (IF
 APPLICABLE) TO THE PROPERTY LINE(S) SHALL ALSO BE
 PROVIDED. PHOTOMETRIC SPILLOVER BEYOND THE PROPERTY
 LINE(S) IS ALSO REQUIRED TO SHOW COMPLIANCE.
  
 2.) PROVIDE THE FOLLOWING NOTE IN THE PLANS FOR
 CONSISTENCY WITH THE ZLDRS FOR EXTERIOR LIGHTING: ALL
 OUTDOOR LIGHTING SHALL BE SHIELDED TO REDUCE GLARE AND
 SHALL BE ARRANGED TO REFLECT LIGHT, OR GLARE AWAY FROM
 ALL ADJACENT RESIDENTIAL DISTRICTS, ADJACENT
 RESIDENCES, OR PUBLIC THOROUGHFARES.
  
  
 SIGNAGE COMMENTS:
  
 1.) THERE IS A CONFLICT WITH THE SIGNAGE INFORMATION
 PRESENTED FOR THE PROJECT. THE JUSTIFICATION STATEMENT
 INCLUDES A WAIVER TO SIGNAGE (BUT NO SPECIFIC DETAILS);
 HOWEVER, THE PLAN SHEETS STATE: "ALL PROPOSED SIGANGE
 SHALL COMPLY WITH THE SIGNAGE REGULATIONS OF THE
 UNDERLYING ZONING DISTRICT." PLEASE ADDRESS FOR
 CONSISTENCY. THE APPLICATION MUST CLEARLY STATE WHAT IS
 THE WAIVER TO THE SIGN CODE REQUIREMENTS, MUST INCLUDE
 SIGNAGE PROPOSAL FOR THE PROJECT (SIGN PROGRAM,
 INCLUDING DIMENSIONS, ETC.), JUSTIFICATION, MITIGATION
 MEASURES (IF APPLICABLE) AND BENEFIT TO THE COMMUNITY
 IF A WAIVER IS BEING SOUGHT FOR SIGNAGE.
  
  
 INSTRUCTIONS FOR RESUBMITTAL:
  
 * PLEASE PROVIDE RESPONSES TO REVIEW COMMENTS IN
 WRITTEN FORMAT.
  
 * WHEN RESUBMITTING, PLEASE PROVIDE A MINIMUM OF FOUR
 (4) PAPER COPIES AND ONE (1) SET IN 11 INCHES X 17
 INCHES, AND AN ELECTRONIC COPY OF ALL PLANS AND
 DOCUMENTS. THREE (3) HARD COPY SETS SHALL BE PROVIDED
 IN FULL COLOR.
  
 * ANY CHANGES ON THE RESUBMITTED PLANS MAY RESULT IN
 ADDITIONAL COMMENTS.
  
 * PLEASE NOTE THAT YOU WILL BE PERMITTED ONE (1)
 RESUBMITTAL AT NO ADDITIONAL COST. IF PREVIOUSLY-ISSUED
 COMMENTS CONTINUE TO NOT BE SUFFICIENTLY ADDRESSED, THE
 APPLICANT WILL BE ASSESSED A RESUBMITTAL FEE. SUCH FEE
 WILL BE 20 PERCENT OF THE ORIGINAL APPLICATION FEE
 ($600).
  
 * CONTACT LINDA LOUIE @ (5661) 822-1458 IF THERE ARE
 QUESTIONS.
  
  
 NOTES:
  
 * DEDICATION, RESERVATION OR IMPROVEMENT OF PROPERTY
 FOR PUBLIC RIGHTS-OF-WAY, STREETS, SCHOOLS, PARKS, MASS
 TRANSIT FACILITIES OR OTHER PUBLIC FACILITIES MAY BE
 REQUIRED AS A CONDITION OR REQUIREMENT OF THE PLANNED
 DEVELOPMENT. [ZLDR S.94-207(B)(3)]
  
 * ALL UTILITIES, INCLUDING TELEPHONE, CABLE TELEVISION
 AND ELECTRICAL SERVICE SYSTEMS, SHALL BE INSTALLED
 UNDERGROUND. [ZLDR S.94-207(B)(5)]
  
 * OUTDOOR STORAGE FACILITIES ARE PROHIBITED. [ZLDR
 S.94-207(D)(9)]
  
 * DEVELOPMENT SHALL PROVIDE FOR ADEQUATE DRAINAGE AND
 STORMWATER
  