Plan Review Notes
Plan Review Notes For Project Z22080023
Project Number Z22080023
Review Stop STORM
Sequence Number 1
Notes
Date Text
2022-09-08 13:04:51THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL
 DETAILS, DESIGN CALCULATIONS AND THE POLLUTION
 PREVENTION PLAN WILL BE REVIEWED AS PART OF THE
 ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT
 APPLICATION PROCESSES.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE
 PLAN APPROVAL:
  
  
 1. THE CITY?S OFFICIAL VERTICAL DATUM IS NGVD1929. THE
 CITY HAS ALLOWED THE USE OF NAVD1988 AS LONG AS THE
 CONVERSION EQUATION TO NGVD1929 AT THE PROJECT LOCATION
 IS PROVIDED. PROVIDE THE VERTICAL REFERENCE AND DATUM
 CONVERSION TO NGVD1929 ON EACH ENGINEERING PLAN SHEET
 WITH ELEVATION INFORMATION.
  
 2. S. DIXIE HWY IS MAINTAINED BY FDOT. FDOT TO APPROVE
 ALL PROPOSED IMPROVEMENTS WITHIN THE R/W.
  
 3. PROVIDE CROSS SECTIONS FROM CENTERLINE OF RIGHTS OF
 WAY AND THE EAST PROPERTY LINES TO THE BUILDING FACES.
 SHOW AND LABEL SURFACE FEATURES, GRADE BREAKS, GENERAL
 SURFACE SLOPES, FINISHED FLOOR ELEVATION, RIGHT OF WAY
 LINES WITH THE STREET IDENTIFIED, DIMENSIONS FROM RIGHT
 OF WAY TO SURFACE FEATURES. IT APPEARS FFE ARE 1 FT OR
 HIGHER THAN R/W GRADES.
  
 4. PROVIDE CROSS SECTIONS FOR ALL DRIVEWAYS FROM THE
 CENTERLINE OF THE ROAD TO 5 FEET PAST THE HIGH POINT OF
 THE DRIVEWAY. SHOW AND LABEL THE RIGHT OF WAY LINE, R/W
 STREET NAME, SURFACE FEATURES, SURFACE SLOPES, GRADE
 BREAKS, ETC.
  
 5. SUGGEST PUTTING TRENCH DRAINS AT THE BACK OF
 SIDEWALKS (AND OUTSIDE THE R/W) TO REDUCE TRIPPING
 HAZARD.
  
 6. PROVIDE SURFACE FLOW ARROWS ON THE GRADING AND
 DRAINAGE PLANS.
  
 7. LABEL EXISTING UTILITIES (SIZE, MATERIAL).
  
 8. SHOW MILL AND RESURFACING LIMITS THAT MEET CITY
 DETAILS.
  
 9. PROVIDE STRIPING PLAN FOR DISTURBED PAVEMENT AREAS.
  
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO
 ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL.
  
 1. DRAINAGE SYSTEM TO BE DESIGNED TO MEET SFWMD ERP
 CRITERIA INCLUDING PEAK FLOW ATTENUATION. STORMWATER
 CALCULATIONS WILL BE REVIEWED WITH THE ENGINEERING
 PERMIT SUBMITTAL.
  
 2. PROVIDE COPY OF SFWMD ERP PERMIT BEFORE START OF
 CONSTRUCTION.
  
 3. PROVIDE EROSION AND SEDIMENT CONTROL PLAN WITH THE
 ENGINEERING PERMIT SUBMITTAL.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120 (O)
 561-351-0510 (M)