2022-09-04 08:41:43PLEASE PROVIDE WRITTEN RESPONSES TO THE FOLLOWING:
 -ADD COVER SHEET TO CIVIL PLANS WITH MAP OF LOCATION.
 -ADD WATER AND SEWER DEMAND CALCULATIONS TO UTILITY
 PLAN SHEETS.
 -FOR CIVIL PLAN SET, ADD STANDARD DETAILS SHEET WITH
 REFERENCED STANDARD DETAILS.
 -DIXIE HWY IS FDOT ROW.
 -ADD WORDING ABOVE-GROUND TO THE LABELS OF THE PROPOSED
 6 INCH AND 4 INCH METERS.
 -SURVEY IS NOT SIGNED, SEALED, AND DATED.
 -SURVEY SHOWS EXISTING UTILITY EASEMENTS RUNNING
 THROUGH PROPERTY, BUT THEY ARE NOT SHOWN AND LABELED ON
 CIVIL PLANS.
 -STRUCTURES MAY NOT BE BUILT ON UTILITY EASEMENTS
 WITHOUT APPROVAL OF CITY.
 -CIVIL PLANS SHOW CONFLICTS WITH UTILITY POLES AND GUY
 WIRES. ADD DEMO PLAN SHEET IF THOSE ARE BEING REMOVED,
 RELOCATED, OR UNDERGROUNDED.
 -SHOW AND LABEL ANY PROPOSED TRANSFORMER PADS.
 -JUSTIFICATION DOCUMENT SAID THERE ARE PROPOSED
 RESTAURANTS, BUT DID NOT SEE ANY GREASE TRAPS. SHOW AND
 LABEL ANY GREASE TRAPS WHICH ARE PROPOSED OUTSIDE OF
 BUILDING.
 -PROPOSED TAPS ON 20 INCH WATER MAIN WOULD REQUIRE
 APPROVAL OF MICHAEL TECHNOW.
 -SHEET C501. UTILITY OR LIGHT POLES APPEAR TO BE CLOSE
 TO WATER UTILITIES. PROVIDE AT LEAST SEVERAL FEET OF
 HORIZONTAL CLEARANCE DISTANCE BETWEEN THEM.
 -ADD A LANDSCAPING SHEET SHOWING ALL TREES, BUSHES, AND
 UTILITIES. ENSURE THERE IS ADEQUATE CLEARANCE DISTANCE
 BETWEEN PLANTS AND UTILITIES.
 -ON LANDSCAPING, CIVIL, AND ARCHITECTURAL PLANS, ADD
 LEGEND IDENTIFYING SYMBOLS USED.
 -THE SOUTHERN BUILDING SHOWS SOMETHING THAT LOOKS LIKE
 OUTDOOR TABLES ADJACENT THE NORTH SIDE. CIVIL PLANS
 SHOW ABOVE-GROUND WATER METER, TRAFFIC SIGN, AND LIGHT
 POLE THERE ALSO. WILL THERE BE ADEQUATE WIDTH FOR
 PEDESTRIAN MOVEMENT THERE?
 -BYPASS OF 6 INCH WATER METER FOR SOUTHERN BUILDING
 CANNOT BE IN OR UNDER CURB.
 -WHAT IS THE PLAN FOR THE AREA BETWEEN THE BULBOUTS?
 ARE THEY PARKING SPOTS? SHOW OR DETAIL MORE CLEARLY ON
 PLANS.
 -SHOW TRAFFIC SIGN NEAR NORTHEAST CORNER OF SOUTHERN
 BUILDING ON UTILITY PLANS. CALLOUT MINIMUM 18 INCH
 CLEARANCE DISTANCE BETWEEN SIGN AND BACKFLOW ASSEMBLY.
 ALSO WILL TRAFFIC SIGN CONFLICT WITH TRAFFIC GATE
 OPENING?
 -IS THE DRIVE PATH ON THE EAST SIDE OF SOUTHERN
 BUILDING ONE WAY? SHOW OR DETAIL MORE CLEARLY ON PLANS.
 ALSO THE NORTHEAST CURB ISLAND DOES NOT ALIGN WITH IT.
 -PAVEMENT RESTORATION LIMITS FROM UTILITY WORK ARE
 LIKELY MUCH LARGER THAN SHOWN ON CIVIL PLANS.
 -LIGHT POLE SHOWING IN DRIVEWAY ON SHEET C501.
 -BACKFLOW ASSEMBLIES FOR NORTH BUILDING MAY BE
 CONFLICTING WITH A WALL. CALLOUT THE OBJECT AND RESOLVE
 ANY LOCATION CONFLICTS.
 -ATTEMPT TO REPOSITION THE WATER SERVICES FOR THE NORTH
 BUILDING SUCH THAT THE FIRE SERVICE DOES NOT RUN
 UNDERNEATH TWO OTHER LARGE WATER SERVICES.
 -WATER METER BOXES MAY NOT ENCROACH INTO CURBS. WATER
 VALVE BOXES SHOULD ALSO NOT BE LOCATED IN CURBS.
 -C500. PROPOSED BACKFLOW ASSEMBLIES CONFLICTING WITH
 EXISTING STORM MANHOLE AND CLEANOUT AS SHOWN ON SURVEY.
 -PLANS DO NOT SHOW ANY OF THE EXISTING NORTH SOUTH OR
 EAST WEST CROSSWALKS.
 -APPLICANT MAY BE REQUIRED TO REROUTE OR BUILD NEW
 WATER MAIN FOR THE ONE THAT IS PROPOSED FOR REMOVAL.
 -ADD ADJACENT PROPERTY ADDRESSES ON CIVIL PLANS.
 -SHOW AND LABEL FDC IF THEY ARE NEEDED OR REQUIRED.
 ENSURE THEY ARE ACCEPTABLE DISTANCE FROM FIRE HYDRANT.
 RESPECTFULLY,