Plan Review Notes
Plan Review Notes For Project Z22080021
Project Number Z22080021
Review Stop TRAFFIC
Sequence Number 2
Notes
Date Text
2023-05-08 11:46:47TRAFFIC COMMENTS
 1) SATISFIED. SCHEDULE A METHODOLOGY MEETING TO DISCUSS
 AND SETUP A QUEUE ANALYSIS THAT PROPERLY CAPTURES THE
 EXISTING QUEUEING ISSUE AT THE FACILITY AND PROVIDES A
 BASELINE TO COMPARE WITH THE PROPOSED DEVELOPMENT.
 MOREOVER, AN INTERSECTION ANALYSIS OF OLIVE AND
 SOUTHERN BLVD MAY BE NEEDED AND DATA COLLECTION SHOULD
 BE PERFORMED DURING THE REAL PEAK HOUR AT THE FACILITY
 2) SATISFIED. PROVIDE COUNTY TPS LETTER
  
 SITE COMMENTS
 3) SATISFIED. PROVIDE A TRANSPORTATION SPECIFIC SITE
 PLAN FOR THE GROUND FLOOR. SHOWCASING TRANSPORTATION
 RELATED FEATURES (E.G. ROADWAY WIDTHS, DRIVING AISLES,
 PARKING STALLS, SIDEWALK, CURB, GUTTER, DRIVEWAY,
 GATES, CROSSWALKS, VISIBILITY TRIANGLE, CORNER &
 DRIVEWAY SEPARATION DISTANCES, SLOPES, ETC.) PROPERLY
 LABELED AND DIMENSIONED. THE SITE PLAN SHOULD BE NAMED
 T-1.0
 4) SATISFIED. IN THE T-1.0 SITE PLAN, PLEASE SHOWCASE
 BASIC CURB DETAILS (E.G. DRIVEWAY, CURB CUTS, PAVEMENT
 MARKINGS, PARKING STALLS, ETC.) ON THE OPPOSITE SIDE OF
 THE ROADS SURROUNDING THE PROPOSED DEVELOPMENT
 5) SATISFIED. PROVIDE A SIGNAGE AND PAVEMENT MARKING
 PLAN. INCLUSIVE OF ALL FEATURES WITHIN THE PROPOSED
 DEVELOPMENT AND ALONG ALL ROADS FRONTING THE SITE. SUCH
 PLAN IS PART OF THE TRANSPORTATION REVIEW AND SHOULD BE
 NAMED ACCORDINGLY (E.G. T-1.1 OR T-2.0)
 6) SATISFIED. PROVIDE AUTOTURN ANALYSIS FOR GARBAGE
 TRUCK AND/OR SERVICE VEHICLES DRIVING IN AND OUT OF THE
 PROPOSED DEVELOPMENT WITH VEHICLE DYNAMIC ENVELOPES AND
 WHEEL PATHS CLEARLY DISTINCT AND DEFINED IN DIFFERENT
 COLORS. PROVIDE THE ANALYSIS IN A SEPARATE SHEET. SUCH
 PLAN(S) CONTAINING THE ANALYSIS ARE PART OF THE
 TRANSPORTATION REVIEW AND SHOULD BE NAMED ACCORDINGLY
 (E.G. T1.2, T-3.0)
 7) SATISFIED. WILL THE DRIVEWAY ON SOUTHERN BLVD BE
 OPEN FOR CUSTOMERS TO ENTER THE FACILITY? BASED ON THE
 CONCEPTUAL ENGINEERING PLAN, IT SEEMS THAT VEHICLES
 ENTERING FROM THE SOUTHERN BLVD DRIVEWAY ARE NOT ABLE
 OR FORBIDDEN TO TURNAROUND AND ENTER THE CARWASH QUEUE.
 PLEASE CLARIFY.
 8) SATISFIED. THERE IS A CONFLICT POINT BETWEEN
 VEHICLES ENTERING FROM THE SOUTHERN BLVD DRIVEWAY AND
 THE ONES EXITING THE CAR WASH FACILITY. ASSUMING
 ENTERING VEHICLES HAVE THE RIGHT-OF-WAY, THE ONES FROM
 THE CAR WASH SHOULD COME TO A STOP, BEFORE HEADING
 SOUTH. THUS, PROPER PAVEMENT MARKING AND SIGNAGE (I.E.
 STOP/YIELD) SHOULD BE INSTALLED TO REGULATE INTERNAL
 CIRCULATION
 9) SATISFIED. THE PROPOSED DRIVEWAY ON OLIVE DOES NOT
 SEEM TO MEET THE MINIMUM CORNER CLEARANCE DISTANCE. A
 VARIANCE MAY BE REQUIRED
 10) SATISFIED. IT IS RECOMMENDED TO MAKE THE PROPOSED
 DRIVEWAY ON OLIVE AS ENTRY-ONLY, AND INSTALL ANOTHER
 DRIVEWAY EXIT-ONLY ON MALVERNE RD
 11) SATISFIED. A RIGHT-TURN STORAGE/DECELERATION LANE
 SHOULD BE INSTALLED ALONG OLIVE NORTH OF THE DRIVEWAY,
 SO TO PROVIDE EXTRA STACKING AND REDUCE THE POSSIBILITY
 OF QUEUE SPILLBACKS
 12) SATISFIED. PROVIDE A CROSSWALK ACROSS MALVERNE AT
 THE INTERSECTION WITH OLIVE AVE
  
 VALERIO ORICCHIO
 CITY TRANSPORTATION ENGINEER
 561-494-1092
 [email protected]
  