2023-06-16 11:21:16-PROVIDE CCTV OF ALL EXISTING SANITARY SEWER MAIN
 FRONTING PROJECT LIMITS BEFORE AND AFTER CONSTRUCTION.
 -REHABILITATE EXISTING SANITARY SEWER PIPE, LATERALS,
 AND MANHOLES AS NEEDED PER PROVIDED CCTV (MANHOLE
 CORING WILL REQUIRE REHAB AS WELL)
 -PROVIDE TYPICAL ROADWAY CROSS-SECTIONS SHOWING
 PLACEMENT OF ALL EXISTING AND NEW UTILITIES (BOTH
 CITY-MAINTAINED AND DRY UTILITIES) CALL OUT HORIZONTAL
 SEPARATION, DEPTH/MIN COVER, ETC.
 -REFER TO THE CITY???S STANDARD DETAILS FOR PLACEMENT
 OF DDCA AND CITY???S POINT OF SERVICE (POS) WHICH
 REQUIRES A SECOND VALVE AT R/W
 -CALL OUT SAMPLE POINTS
 -SET UP ALL PLAN SHEETS TO PRINT TO SCALE ON 11X17
 -SHOW ALL EXISTING WATER SERVICES/METER BOXES/VALVES
 VAULTS, AND SANITARY SEWER LATERALS AND THE MAINS THEY
 ARE CONNECTED TO WITHIN PROJECT LIMITS.
 -ADD NOTE TO PLANS THAT EXISTING PRESSURE PIPE (WM/FM)
 NEEDS TO REMAIN ACTIVE UNTIL FDOH APPROVAL FOR TIE-IN
 IS RECEIVED. THE PROPOSED PRESSURE PIPE CANNOT BE IN
 THE SAME ALIGNMENT AS EXISTING. SEE DETAIL P-6 FOR
 DOUBLE VALVE OR PHYSICAL GAP AT THE SOURCE OF SUPPLY
 FOR CONSTRUCTION WATER. (ADDITIONAL VALVES WILL BE
 REQUIRED TO KEEP NEW PRESSURE PIPE AND EXISTING
 PRESSURE PIPE PRESSURIZED IN PREPARATION FOR TIE-IN)
 -WHEREVER POSSIBLE, INSTALL UTILITIES 5 FEET OR MORE
 FROM THE CURB LINE
 -PROVIDE PROFILES FOR ALL CONNECTIONS TO EXISTING
 CITY-MAINTAINED UTILITIES FROM THE POINT OF CONNECTION
 TO THE POINT OF SERVICE.
 -PROVIDE A BLOW-UP DETAIL FOR ALL CONNECTION POINTS TO
 CITY-MAINTAINED UTILITIES.
 -ON PROFILE VIEW, SHOW ALL EXISTING AND PROPOSED
 UTILITIES (CITY-MAINTAINED AND DRY UTILITIES), CALL OUT
 UTILITY TYPE, DIMENSIONS, PIPER MATERIAL, AND VERTICAL
 CLEARANCE OD TO OD AT EACH UTILITY CROSSING.
 -SINGLE WATER TAPS SERVING DOMESTIC, FIRE LINE,
 IRRIGATION, AND FIRE HYDRANT PRESENTS ISSUES FOR FUTURE
 MAINTENANCE/REPAIRS/REPLACEMENTS ETC. AS SHUTDOWN WILL
 DISRUPT SERVICE. IF FEASIBLE, CALL FOR MULTIPLE TAPS.
 -CONFORM TO SAMPLING/TESTING PROCEDURES AS MENTIONED IN
 AWWA???S C651 4.10 FOR CONNECTIONS GREATER THAN ONE
 PIPE LENGTH. (18 FT)
 -EXISTING WATER AND SEWER SERVICES CURRENTLY SERVING
 THE PROPERTY, IF NOT USED, NEED TO BE CUT AND CAP AT
 MAIN. REMOVAL IS REQUIRED IF LARGER THAN 2??? IN
 DIAMETER, OR AS REQUIRED BY THE RIGHT-OF-WAY???S
 GOVERNING AGENCY.
 -ADHERE TO GENERAL NOTES SECTION OF CITY???S STANDARD
 DETAILS FOR GUIDANCE ON VERTICAL AND HORIZONTAL
 SEPARATION OF UTILITIES.
 -PROVIDE LOS CALCULATIONS, AS WELL AS CHANGE IN DEMAND
 BETWEEN EXISTING CONDITIONS AND PROPOSED CONDITIONS ON
 PLANS.
 -ADD NOTE TO PLANS SPECIFYING THE LIFT STATION THAT THE
 PROJECT IS UPSTREAM FROM.
 -NEW TAP FOR PROPOSED WATER RECOMMENDED AS TO MINIMIZE
 LENGTH OF PIPE REQUIRING CITY MAINTENANCE
 -CONFIGURATION SHOWN ON PLANS FOR BOTH WATER AND SEWER
 DO NOT MATCH EXISTING CONFIGURATION PER CITY RECORDS
 -NEW SEWER MAIN MUST BE INSTALLED IN R/W