2023-03-23 12:53:21ZONING AND PLANNING
  
 PROJECT: SOLESTE FSPR 22-19
 DATE: 03.23.23
  
 CONTACT: CLAUDIA IBAVEN, CITY URBAN DESIGNER, AT
 561-822-1402 OR VIA [email protected].
 I HAVE REVIEWED THE ABOVE REFERENCED PETITION AND
 PROVIDE THE FOLLOWING COMMENTS:
  
  
 ZONING DATA AND DIAGRAMS
  
 1. ON SHEET A1.5, ACTIVE USE: PLEASE REVISE BOTH
 DIMENSIONS AND TABLE CALCULATIONS BASED ON THE
 FOLLOWING:
 - FACING N ROSEMARY AVE, THE DIMENSIONS OF THE
 'BUILDABLE LOT FRONTAGE' OF THE NORTH BUILDING SHOULD
 BE FROM THE SETBACK TO THE SOUTH END OF THE OPEN SPACE.
 ACTIVE USE DIMENSION (179FT) IS NOT SHOWN ON THE TABLE.
  
 DIMENSIONS AND TABLE UPDATED
  
 Z 03.15.23 ??? SATISFIED
  
 - FACING N ROSEMARY AVE, THE DIMENSIONS OF THE
 'BUILDABLE LOT FRONTAGE' OF THE SOUTH BUILDING SHOULD
 BE FROM THE SETBACK TO NORTH END OF OPEN SPACE.
 COURTYARD SHOULD BE INCLUDED AS ACTIVE USE.
  
 DIMENSIONS AND TABLE UPDATED
  
 Z 03.15.23 ??? SATISFIED
  
 - FACING W RAILROAD AVE, THE DIMENSION OF 'BUILDABLE
 LOT FRONTAGE' OF 196FT AND 'ACTIVE USE' OF 77FT DO NOT
 MATCH THE TABLE.
 DIMENSIONS AND TABLE UPDATED
  
 Z 03.15.23 ??? SATISFIED
  
 - FACING 3RD STREET, PLEASE NOTE ENCLOSED STAIRS DO NOT
 COUNT AS ACTIVE USE, PLEASE EXCLUDE FROM DIMENSIONS AND
 CALCULATIONS.
 DIMENSIONS AND TABLE UPDATED
  
 Z 03.15.23 ??? SATISFIED
  
  
 2. ON SHEET A1.5, PLANAR BREAKS: THE COURTYARD ALSO IS
 A PLANAR BREAK, PLEASE INCLUDE IN YOUR CALCULATIONS.
  
 DIMENSIONS AND TABLE UPDATED
  
 Z 03.15.23 ??? SATISFIED
  
 3. ON SHEET A1.5, HORIZONTAL PROJECTIONS: THERE ARE
 DOTTED LINES THAT SEEM TO BE HORIZONTAL PROJECTIONS BUT
 ARE NOT COUNTED AS SUCH, PLEASE REVIEW. AND, PLEASE
 MAKE SURE HORIZONTAL PROJECTIONS MATCH OTHER PLANS AND
 RENDERINGS.
  
 DIMENSIONS AND GRAPHICS UPDATED
  
 Z 03.15.23 ??? SATISFIED
  
 4. ON SHEET A1.4 - OPEN SPACE: PLEASE NOTE, THERE IS NO
 BREAKDOWN SHOWING WHERE THE 2,270SQ.FT. OF SEMI-OPEN
 SPACE IS COMING FROM. IN ADDITION, THERE ARE SOME
 WALK-UP GARDENS THAT LOOK DIFFERENT IN CONFIGURATION
 FROM THE SAMPLES. AND SAMPLES ARE SHOWING OVERHEAD
 COVERAGES DIFFERENT FROM FLOOR PLANS AND RENDERINGS.
  
 SQUARE FOOTAGES OF THE THREE SEMI-PUBLIC OPEN SPACE
 ZONES ADDED. TOTAL SEMI-PUBLIC AREA UPDATED. FOUR
 ADDITIONAL SAMPLE WALK-UP GARDEN DETAILS ADDED (SHEET
 A1.4A). OVERHEAD COVERING GRAPHICS UPDATED.
  
 Z 03.15.23 ??? NOT SATISFIED.
  
 ON SHEETS A1.4 AND A1.4A, WALK-UP GARDENS:
 ??? PLEASE REVISE ON TABLES, THE ACTIVE USE ABUTMENT
 REQUIREMENTS
  
 TABLES REVISED TO REFLECT REQUIREMENTS FROM ZONING
 TABLE.
  
 Z 03.23.23 ??? SATISFIED. MINOR EDIT, COURTYARD FACING
 ROSEMARY RD PROVIDES 2 SIDES ONLY, NOT 3. THE OTHER 2
 ARE ROW AND CIRCULATION HALL THAT IS NOT ACTIVE USE.
  
 Z 03.23.23 ??? SATISFIED.
  
 ??? WALK-UP GARDENS SQ.FT. TOTALS DO NOT MATCH WHEN
 ADDING UP, PLEASE REVIEW AND REVISE CALCULATIONS.
  
 ALL WALK UP GARDENS LABELED TO SHOW INDIVIDUAL AREAS.
 TOTAL SEMI-PUBLIC AREA UPDATED.
  
 Z 03.23.23 ??? SATISFIED. MINOR EDIT, ON SHEET A1.4,
 LABELS CALLING OUT SEMI???PUBLIC OPEN SPACE HAVE SOME
 SQUARE FOOTAGE ON THEM THAT DOES NOT ADD UP, PLEASE
 REMOVE THEM.
  
 ??? WALK-UP GARDEN SECTION SHOWS A BALCONY PROJECTION
 LESS THAN THE MINIMUM REQUIRED OF 3 FEET, PLEASE
 REVISE, AND REVISE ANY CALCULATIONS ON YOUR PLANS.
 PLEASE NOTE, ON SECTION IN SHEET L-1A, THE PROJECTION
 MEASURES 3 FEET.
  
 BALCONY PROJECTION IN SECTION REVISED TO 3 FEET.
  
 Z 03.23.23 ??? SATISFIED.
  
 ??? AS SHOWN ON WALK-UP GARDEN SECTION, PLEASE CONSIDER
 THE USE OF A FENCE INSTEAD OF A WALL SO PEDESTRIANS ON
 SIDEWALK CAN SEE VEGETATED AREAS.
  
 WE WILL EXPLORE, PRIOR TO DAC SUBMITTAL, INCORPORATING
 MORE TRANSPARENCY FOR THE WALL UP GARDENS, WITH LOWER
 WALLS AND/OR METAL RAILING.
  
 Z 03.23.23 ??? ACKNOWLEDGED.
  
 ??? NOTE, SHADING SYSTEMS SHOULD NOT AFFECT TREES
 CANOPY ON OPEN SPACES.
  
 SHADING SYSTEMS ADJUSTED TO CLEAR CANOPIES.
  
 Z 03.23.23 ??? PARTIALLY SATISFIED. COURTYARD FACING
 ROSEMARY AVE HAS JAPANESE FERN TREES WITH A 12???
 HEIGHT, THE DRAWINGS SHOW THAT THE OVERHEAD COVER (MIN.
 10% REQUIRED) MIGHT LOWER IMPACTING THE TREES. PLEASE
 REVISE.
  
 NOTE, ON SHEET A1.4B, SOME AREAS OUTSIDE THE PRIVATE
 OPEN SPACE DOTTED LINE ARE NOT SHADED.
  
 HATCH GRAPHICS ADJUSTED ON SHEET A1.4B.
  
 Z 03.23.23 ??? SATISFIED.
  
  
 5. ON SHEET A1.6, PLEASE CLARIFY WHY THE BUILDING'S
 FACADE DIMENSIONS ARE NOT MATCHING OTHER PLANS,
 EXAMPLE, ON SHEET A1.0 AND A1.5, THE NORTH BUILDING
 FRONTAGE IS 150FT. PLEASE ALSO REVIEW, SEC. 94-109,
 FIGURE IV-33 TO SEE TRANSPARENCY SAMPLE CALCULATION.
  
 BUILDING FA??ADE DIMENSIONS UPDATED.
  
 Z 03.15.23 ???NOT SATISFIED. ON SHEET A1.6:
 ??? ON TABLE, REQUIRED SF DOES NOT MATCH THE DIMENSIONS
 ??? GARAGE ENTRANCES CANNOT BE COUNTED TOWARDS
 TRANSPARENCY CALCULATIONS. ENCLOSED NON-ACTIVE USE CAN
 BE EXCLUDE FROM TRANSPARENCY CALCULATIONS AS IT IS NOT
 TECHNICALLY A ???STOREFRONT???. HOWEVER FOR ENCLOSED
 NON-ACTIVE USE FACADES, PLEASE PROVIDE AN ARCHITECTURAL
 TREATMENT (SEE SEC. 94-109, TABLE IV-4).
  
 DIAGRAMS REVISED TO INCLUDE ONLY ???STOREFRONT???
 AREAS. NON-ACTIVE USE AREAS HAVE BEEN IMPROVED TO
 INCORPORATE ARTICULATION AND RHYTHM AND SHOW VARIATION
 IN COLOR.
  
 Z 03.23.23 ??? SATISFIED.
  
 6. PLEASE EXPLAIN WHAT IS THE 'MARKET ROOM' ON THE
 NORTH BUILDING.
 THE MARKET ROOM WILL BE A SMALL AMENITY SPACE FOR
 SNACKS, COFFEE AND VENDING MACHINES. IT WILL BE
 SELF-SERVICE FOR RESIDENTS ONLY.
  
 Z 03.15.23 ??? SATISFIED. PLEASE MAKE SURE TO EXPLAIN
 IN YOUR JUSTIFICATION LETTER.
  
  
  
 PARKING
  
 1. PLEASE NOTE, AS PER SEC. 94-111 (C) IN THOSE CASES
 WHERE THE SIDE OF ANY STALL IS ADJACENT TO A WALL,
 FENCE, BUILDING, OR OTHER PHYSICAL OBSTRUCTION, THE
 STALL WIDTHS SHALL BE INCREASED BY A MINIMUM OF ONE
 FOOT. WHERE THERE IS AN OBSTRUCTION ON BOTH SIDES OF
 THE STALL, THE STALL WIDTHS SHALL BE INCREASED BY A
 MINIMUM OF TWO FEET. ON A2.2 SHEET, TANDEM PARKING
 SPACES LOCATED ON THE SOUTHEAST OF THE PARKING GARAGE
 IN THE SOUTH BUILDING ARE SHOWING AGAINST WALLS
 ENCLOSING STAIRS.
  
 THE TWO AFFECTED TANDEM SPACES HAVE BEEN REMOVED.
  
 Z 03.15.23 ??? SATISFIED
  
 2. PLEASE PROVIDE ADA RAMPS SHOWING SLOPE RATIO AND
 DIMENSIONS. PLEASE MAKE SURE CHANGES ARE REFLECTED ON
 ALL PLANS.
  
 DIMENSIONS AND SLOPE ADDED TO ADA RAMPS.
  
 Z 03.15.23 ??? SATISFIED
  
  
 3. PLEASE CLARIFY IF THE PARKING GARAGE GATES ARE NO
 LONGER PROPOSED AND PARKING LOTS ARE ACCESSIBLE 24/7.
 AND, WHAT SECURITY MEASURES WILL BE PROPOSED FOR
 OPERATIONS?
  
 PARKING ENTRANCES HAVE BEEN REVISED TO SHOW ROLL-UP
 ACCESS GATES.
  
 Z 03.15.23 ??? SATISFIED
  
  
 4. PER SEC. 94-111, ALL PARKING STRUCTURE ENTRANCES
 FACING A STREET FRONTAGE SHALL BE REQUIRED TO TREAT THE
 INTERIOR PORTION OF THE GARAGE ENTRY TO A DEPTH OF AT
 LEAST 20 FEET FROM THE BUILDING FACADE. TREATMENT MAY
 INCLUDE, BUT SHALL NOT BE LIMITED TO, STUCCO OR
 PLASTER, FINISHED AND PAINTED COMPARABLE TO A HABITABLE
 SPACE. ALL MECHANICAL, ELECTRICAL, AND PLUMBING SYSTEMS
 SHALL BE COVERED OR SCREENED.
  
 PARKING ENTRANCES WILL BE TREATED WITH SCORED STUCCO,
 PAINTED TO MATCH ADJACENT ACTIVE USE AREAS. NOTE ALSO
 ADDED TO SITE PLAN INDICATING EXTENT OF WALL TREATMENT.
  
 Z 03.15.23 ??? SATISFIED
  
  
  
 STREETSCAPE AND LANDSCAPE
  
 1. OPEN SPACE DIAGRAMS DO NOT MATCH LANDSCAPE PLANS AND
 WE ARE UNABLE TO DETERMINE ON WHETHER THESE SPACES MEET
 THE LANDSCAPE AND OPEN SPACE REQUIREMENTS. PLEASE NOTE,
 LOADING AREAS AND TRAVEL ROUTES CANNOT GO OVER
 LANDSCAPE, TREES, OR SIDEWALKS. SEE ALSO ZONING DATA
 AND DIAGRAMS COMMENT #4.
  
 LANDSCAPE LAYOUT UPDATED ON SITE PLAN. OPEN SPACE
 DIAGRAMS UPDATED TO SHOW LANDSCAPE LAYOUT.
  
 Z 03.15.23 ??? SATISFIED. PLEASE NOTE, ON ANY PLAN
 SUBMITTED AFTER 3.10.23, PLEASE MAKE SURE TO ADD
 REVISION INFO ON THE TABLE (NO., DATE, REVISIONS).
 PLEASE REVISE SHEET L-2 AND A1.4B.
  
 2. ON SHEET A1.0, EXISTING CROSSING ON N ROSEMARY AND
 4TH ST DOES NOT MEET SIDEWALK. CROSSWALK GRAPHICS
 REVISED TO SHOW CONNECTION TO SIDEWALK.
  
 Z 03.15.23 ??? NOT SATISFIED. CROSSWALKS SHOULD MATCH
 SIDEWALK ON ROSEMARY AVE ON ROSEMARY AVE AND 3RD
 STREET, SEE BELOW SKETCH:
  
 CROSSWALKS UPDATED TO MATCH SIDEWALK.
  
 Z 03.23.23 ??? SATISFIED.
  
  
 3. PLEASE NOTE ON ENGINEERING PLANS YOU ARE SHOWING
 CURB RAMPS ON CROSSINGS AND DRIVEWAYS, PLEASE MAKE SURE
 TO ADD THOSE TO THE SITE PLAN.
 CURB CUTS AND CROSSING ADDED TO SITE PLAN
  
  
 Z 03.15.23 ??? NOT SATISFIED. ON ACCESS TO PARKING
 GARAGES, SIDEWALKS AND LANDSCAPE WERE REMOVED. AND, L-1
 AND L-3 DO NOT MATCH ARCH OR CIVIL PLANS. AS PER CODE,
 CURB CUTS, PARKING ENTRANCES, EXITS, AND DRIVEWAYS
 SHALL NOT BE WIDER THAN 25 FEET AS MEASURED PARALLEL TO
 THE STREET AT THE CURB. PLEASE REVISE SITE PLAN AND ALL
 APPLICABLE PLANS.
  
 ENTRANCES TO GARAGE REVISED SHOW SOW CURBS AND
 LANDSCAPING.
  
 Z 03.23.23 ??? SATISFIED.
  
 4. PLEASE PROVIDE DETAILS ON THE TYPE OF PAVEMENT
 TREATMENT ON CROSSINGS, WALKWAYS, OPEN SPACES, ETC.,
 SUCH AS STAMP CONCRETE, PAVERS, ETC.
  
 SIDEWALKS AND OPEN SPACES WILL BE CONCRETE PAVERS. SEE
 THE LANDSCAPE PLAN AND SITE PLAN FOR NOTES.
  
 Z 03.15.23 ??? NOT SATISFIED. PLEASE ADD LABELS FOR
 SIDEWALK, OPEN SPACES (COURTYARD, WALKUP GARDENS,
 TERRACES), AND LOBBY ENTRANCES PAVEMENT TREATMENT IF
 DIFFERENT FROM CONCRETE PAVERS. AS OF NOW, AREAS HAVE
 DIFFERENT HATCHING AND COLORS THAT COULD INDICATE
 DIFFERENT PAVEMENT MATERIALS.
  
 LABELS UPDATED TO SHOW CONCRETE PAVERS FOR SIDEWALKS,
 PUBLIC OPEN SPACES, AND ENTRANCES/WALK-UP GARDENS. EACH
 COLOR ON THE SITE PLAN REPRESENTS A DIFFERENT CONCRETE
 PAVING COLOR/SIZE/PATTERN.
  
 Z 03.23.23 ??? SATISFIED.
  
 5. PLEASE SHOW LIGHTING POLES ON SITE PLAN AS PROPOSED
 IN YOUR PHOTOMETRIC PLANS E1. PLEASE NOTE, YOU WILL
 NEED TO UPDATE YOUR PHOTOMETRIC PLANS BASED ON CHANGES.
  
 PHOTOMETRIC PLANS HAVE BEEN UPDATED TO REFLECT CURRENT
 SITE PLAN. LIGHT POLES ARE SHOWN ON SITE PLAN SHEET
 A1.0.
  
 Z 03.15.23 ??? SATISFIED. MAKE SURE YOU LABEL THE LIGHT
 POLES ON SITE PLAN.
  
  
  
 ELEVATIONS
  
 1. PLEASE CLARIFY IF THE SCREENING ON THE BRIDGE IS
 DIFFERENT ON BOTH FACADES, NORTH AND SOUTH, AS SHOWN ON
 ELEVATIONS. ALSO CLARIFY, IF COLUMNS ON BRIDGE ARE
 DIFFERENT IN SIZE; ON THE WEST ELEVATION, COLUMNS LOOK
 WIDER AND PAINTED BLUE, ON EAST ELEVATION, COLUMNS AND
 ARE THINNER AND PAINTED WHITE.
  
 BRIDGE SCREENING HAS BEEN REVISED TO SHOW WIDE COLUMNS,
 PAINTED BLUE, ON BOTH SIDES.
  
 Z 03.15.23 ??? SATISFIED.
  
 2. PLEASE MAKE SURE TO ALSO POINT OUT PILASTERS ON
 SHEET A3.2A OR ANY OTHER DECORATIVE TREATMENT PROPOSED
 ON FACADES. AND, PLEASE ADD METAL RAILINGS DETAIL.
  
 SAMPLE IMAGES ADDED FOR PILASTERS AND METAL RAILINGS.
  
 Z 03.15.23 ??? NOT SATISFIED. SEE COMMENT ZONING DATA
 AND DIAGRAMS #5, 3RD STREET AND RAILROAD ELEVATIONS
 ENCLOSING NON-ACTIVE USE. AND, PLEASE NOTE, FOR THE DAC
 PRESENTATION ELEVATIONS AND RENDERINGS WILL NEED TO BE
 CLEANED UP.
  
 ELEVATIONS UPDATED TO SHOW ARCHITECTURAL TREATMENT FOR
 NON-ACTIVE USE FACADES.
  
 RENDERINGS/ELEVATIONS WILL BE CLEANED UP FOR DAC
 PRESENTATION.
  
 Z 03.23.23 ??? SATISFIED.
  
 3. PLEASE NOTE, SOME DOORS ON ELEVATIONS DO NOT MEET
 THE SIDEWALK LEVEL AND HAVE NOT STEPS. SEE EAST
 ELEVATION CLOSER TO THE NORTH AND ADD ELEVATION LEVEL
 TO SIDEWALKS.
  
 EAST ELEVATION REVISED TO SHOW CORRECT DOOR ELEVATIONS
 AND/OR STEPS.
  
 Z 03.15.23 ??? SATISFIED.
  
  
 SECTIONS
  
 1. PLEASE ADD ELEVATION LEVELS TO SIDEWALKS. SPOT
 ELEVATIONS ADDED.
  
 Z 03.15.23 ??? SATISFIED.
  
 2. ON SHEET A4.1, SECTION A, SOME STAIRS ON LOBBIES ARE
 NOT MEETING THE SIDEWALK LEVELS. SECTION GRAPHICS
 UPDATED.
  
 Z 03.15.23 ??? SATISFIED.
  
 3. ON SHEET A4.2, SECTION C DOES NOT MATCH FLOOR PLAN
 AS PARKING CLOSER TO THE WEST IS AT 6FT LEVEL. IN
 ADDITION, THE MAIL ROOM SEEMS TO BE CONNECTED TO THE
 PACKAGE ROOM AND MAIL ROOM LOOKS LIKE IT IS AT 6FT
 LEVEL AND PACKAGE ROOM AT 3FT LEVEL. AND, UNITS ON
 SECTION ARE NOT AT 6FT LEVEL AS SHOWN ON FLOOR PLANS.
  
 YES, MAIL ROOM ACCESS IS CONNECTED TO PACKAGE ROOM.
 PACKAGE ROOM ACCESS HAS BEEN UPDATED TO SHOW STEPS DOWN
 TO LOWER LEVEL. SECTION GRAPHICS UPDATED TO SHOW UNITS
 ON ELEV +6???.
  
 Z 03.15.23 ??? SATISFIED.
  
 4. ON SHEET A4.1 SECTION B AND SHEET A3.2, SOUTH
 ELEVATION- 4TH ST. PLEASE EXPLAIN HOW THESE MAIN
 ENTRANCES TO THE BUILDINGS ARE HIGHLIGHTED WITH THE
 DESIGN. PERHAPS MORE TRANSPARENCY CAN BE ADDED OR USE
 OF DIFFERENT MATERIALS OR COLORS. AS WELL AS
 LANDSCAPING OR HARDSCAPE TO ELEVATE THE DESIGN.
  
 LOBBY ENTRANCES UPDATED TO SHOW MORE GLAZING ON THE
 FA??ADE AS WELL AS ACCENT COLORS AND STUCCO FRAMING
 DETAILS.
  
 Z 03.15.23 ??? SATISFIED.
  
  
  
 RENDERS
  
 1. PLEASE MAKE SURE RENDERS MATCH LANDSCAPING AND
 STREETSCAPE. RENDERED VIEWS UPDATED.
  
 Z 03.15.23 ??? PARTIALLY SATISFIED. I DO NOT THINK
 RENDERS SHOW ALL LANDSCAPING, SPECIALLY VEGETATED AREAS
 ON OPEN SPACES AND LANDSCAPE STRIP ADJACENT TO THE
 SIDEWALKS.
  
 Z 03.23.23 ??? SATISFIED. MAKE SURE PROPOSED
 LANDSCAPING IS REFLECTED ON RENDERS.
  
  
 CONDITIONS OF APPROVAL:
 ??? PRIOR TO FINAL SITE PLAN APPROVAL, THE APPLICANT
 SHALL SUBMIT FINAL SET OF PLANS.
 ??? ALL TANDEM PARKING SPACES WITHOUT LIFTS PROVIDED IN
 THE PARKING STRUCTURE SHALL BE DEDICATED TO RESIDENTIAL
 USE ONLY AND TO THE SAME RESIDENTIAL UNIT. THE
 DEDICATION OF TANDEM PARKING SPACES TO THE SAME
 RESIDENTIAL UNIT SHALL BE ESTABLISHED AND RECORDED IN A
 RESTRICTIVE COVENANT ON CITY APPROVED FORMS AND
 RECORDED IN THE PUBLIC RECORDS PRIOR TO THE ISSUANCE OF
 FINAL C.O.
 ??? TREES ADJACENT TO VISIBILITY TRIANGLES WILL HAVE AN
 8??? CLEAR TRUNK.
 ??? THE PROJECT, AS IT INCLUDES RESIDENTIAL
 MICRO-UNITS, WILL CONTRIBUTE A TROLLEY FEE PER UNIT PER
 MONTH TO SUPPORT THE OPERATION OF THE CITY'S TROLLEY
 SYSTEM, AS ESTABLISHED BY RESOLUTION OF THE CITY
 COMMISSION FROM TIME TO TIME.
 ??? THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE
 RESPONSIBLE FOR THE PERMITTING AND INSTALLATION OF
 MICRO MOBILITY/BIKE SHARE STATION APPROVED WITH THIS
 PETITION. INSTALLATION SHALL BE COMPLETED PRIOR T.C.O.
 ??? ALL PARKING STRUCTURE ENTRANCES FACING A STREET
 FRONTAGE SHALL BE REQUIRED TO TREAT THE INTERIOR
 PORTION OF THE GARAGE ENTRY TO A DEPTH OF AT LEAST 20
 FEET FROM THE BUILDING FA??ADE. TREATMENT MAY INCLUDE,
 BUT SHALL NOT BE LIMITED TO, STUCCO OR PLASTER,
 FINISHED AND PAINTED COMPARABLE TO A HABITABLE SPACE.
 ALL MECHANICAL, ELECTRICAL, AND PLUMBING SYSTEMS SHALL
 BE COVERED OR SCREENED.
  