Plan Review Notes
Plan Review Notes For Project Z22080012
Project Number Z22080012
Review Stop TRAFFIC
Sequence Number 3
Notes
Date Text
2023-02-16 17:01:49TRAFFIC COMMENTS
 1) SATISFIED. PROVIDE A DETAILED TRAFFIC STUDY. A
 METHODOLOGY MEETING SHALL BE SCHEDULED PRIOR TO
 DRAFTING THE ANALYSIS.
 2) SATISFIED. PLEASE INSERT PERTINENT SUMMARY TABLES
 AND FIGURES WITHIN THE MAIN BODY OF THE REPORT, SUCH AS
 DRIVEWAY VOLUMES, SITE LOCATION, TRIP GENERATION, LOS
 SUMMARY, ETC. APPENDIX SHOULD BE USED AND REFERENCED
 FOR LARGE TABLES AND FIGURES SUCH AS SYNCHRO OUTPUTS,
 SIGNAL PLANS, BACKGROUND VOLUMES, ETC. SEVERAL SAMPLE
 TRAFFIC STUDIES HAVE BEEN PROVIDED. PLEASE REFER TO
 THOSE STUDIES FOR PROPER FORMATTING AND REFERENCING
 3) SATISFIED. PLEASE NAME AND/OR NUMBER EACH TABLE,
 FIGURE AND REFERENCED DOCUMENT
 4) SATISFIED. PLEASE INSERT PAGE NUMBERING THROUGHOUT
 THE REPORT, INCLUDING THE APPENDIX, AND UPDATE THE
 TABLE OF CONTENT ACCORDINGLY
 5) SATISFIED. PLEASE REVISE FIGURE 2. PERCENTAGES
 SHOULD BE PLACED MID-BLOCK AND PROPERLY ADD-UP. IT
 SEEMS ONLY 50% OF THE TRAFFIC IS COMING IN/OUT OF THE
 SITE
 6) SATISFIED. PLEASE REVISE FIGURE 3. TURNING MOVEMENTS
 WITH NO VOLUMES SHOULD BE REMOVED, DAILY TRAFFIC
 VOLUMES PROVIDED
 7) PLEASE PROVIDE A CONCLUSION PARAGRAPH IN THE TRAFFIC
 STUDY, SUMMARIZING ALL FINDINGS AND HIGHLIGHTING ALL
 DEFICIENCIES AND SIGNIFICANT IMPACTS, TOGETHER WITH
 PROPOSED/POTENTIAL MITIGATION MEASURES, IF ANY
 SITE COMMENTS
 8) SATISFIED. PROVIDE A CLEAN TRANSPORTATION SPECIFIC
 SITE PLAN FOR THE GROUND FLOOR. SHOWCASING
 TRANSPORTATION RELATED FEATURES (E.G. ROADWAY WIDTHS,
 DRIVING AISLES, PARKING STALLS, SIDEWALK, CURB, GUTTER,
 DRIVEWAY, GATES, CROSSWALKS, VISIBILITY TRIANGLE,
 CORNER & DRIVEWAY SEPARATION DISTANCES, SLOPES, ETC.)
 PROPERLY LABELED AND DIMENSIONED. THE SITE PLAN SHOULD
 BE NAMED T-1.0. PLEASE PROVIDE A SPECIFIC SITE PLAN AS
 REQUESTED. SHEET A1 AND C5 DO NOT PROPERLY DEPICT NOR
 PROVIDE ALL THE REQUESTED ITEMS. MOREOVER, ITEMS
 IMPACTING PEDESTRIAN MOVEMENT SUCH AS PLANTERS AND
 TRAFFIC/UTILITY POLES ALONG THE SIDEWALK AREAS MUST BE
 SHOWN; BASED ON THOSE ITEMS AND ALONG CHOKE POINTS, THE
 EFFECTIVE SIDEWALK WIDTH SHOULD BE PROPERLY SHOWN AND
 DIMENSIONED
 9) SATISFIED. IN THE T-1.0 SITE PLAN, PLEASE SHOWCASE
 BASIC CURB DETAILS (E.G. DRIVEWAY, CURB CUTS, PAVEMENT
 MARKINGS, PARKING STALLS, GARAGE ENTRANCES, ETC.) ON
 THE OPPOSITE SIDE OF THE ROADS SURROUNDING THE PROPOSED
 DEVELOPMENT. PLEASE PROVIDE A SPECIFIC TRANSPORTATION
 SITE PLAN AS REQUESTED
 10) SATISFIED. THE PAVEMENT, MARKING & SIGNAGE PLAN IS
 INCOMPLETE. PLEASE PROVIDE ALL EXISTING AND PROPOSED
 FEATURES WITHIN THE PROPOSED DEVELOPMENT AND ALONG ALL
 THE ROADS FRONTING THE SITE. THIS SITE PLAN CAN BE
 CONSIDERED PART OF THE TRANSPORTATION REVIEW AND COULD
 BE EITHER INCLUDED IN THE T-1 SITE PLAN OR NAMED T-1.2.
 RESPONSE LETTER INDICATES SHEET C-7, CORRECT SHEET
 WOULD BE C-8. NONETHELESS, INSTALL A ONE-WAY SIGN ON
 THE EAST LEG OF THE ROSEMARY & 4TH ST INTERSECTION,
 STOP SIGN AND STOP BARS SHOULD BE INSTALLED AT EACH
 GARAGE AND DRIVEWAY EXITS, SERVICE DRIVEWAYS SHOULD BE
 INDICATED AD SIGNED AS SUCH, DEAD-END DRIVEWAYS SHOULD
 BE SIGNED AS SUCH.
 11) NOT SATISFIED. PROVIDE AUTOTURN ANALYSIS FOR
 GARBAGE TRUCK AND/OR SERVICE VEHICLES DRIVING IN AND
 OUT OF THE PROPOSED DEVELOPMENT WITH VEHICLE DYNAMIC
 ENVELOPES AND WHEEL PATHS CLEARLY DISTINCT AND DEFINED
 IN DIFFERENT COLORS. SITE PLAN(S) CONTAINING THE
 ANALYSIS SHOULD BE CONSIDERED PART OF THE
 TRANSPORTATION REVIEW AND NAMED ACCORDINGLY (E.G. T1.2,
 T-3). ENGINEERING SERVICES CAN PROVIDE SAMPLE AUTOTURN
 ANALYSES. LATEST AUTOTURN DOES NOT PROVIDE THE
 REQUESTED FEATURES.
 12) SATISFIED. IDENTIFY AND DESIGNATE AN EASILY
 ACCESSIBLE MICRO-MOBILITY STATION AREA (MINIMUM 8 X 20
 FEET) AND PROVIDE BASIC ELECTRIFICATION READINESS WITH
 THE FOLLOWING SPECS: A CONDUIT (2-INCH SCHEDULE 40 PVC)
 TO THE POWER SOURCE WITH AN ELECTRICAL PULL BOX (240V -
 10,000W CIRCUIT). PLEASE INSERT THIS ITEM IN THE T-1 OR
 T-2 SITE PLAN
 13) PARTIALLY SATISFIED. DEPENDING ON THE OUTCOME OF
 THE TRAFFIC ANALYSIS, PROVIDE TRANSPORTATION DEMAND
 MANAGEMENT (TDM) MEASURES. PLEASE PROVIDE A NUMBERED
 AND SPECIFIC LIST OF POTENTIAL TDMS IN THE TRAFFIC
 STUDY. PLEASE PROVIDE PAGE NUMBER WHERE THIS ITEM IS
 ADDRESSED
 14) SATISFIED. PROVIDE A PARKING TABLE SHOWCASING THE
 NUMBER OF REQUIRED AND PROVIDED PARKING SPACES,
 INCLUSIVE OF ADA AND BICYCLE ONES
 15) SATISFIED. IN THE PAVEMENT, MARKING & SIGN PLAN,
 PROVIDE A TABLE SHOWCASING THE NUMBER OF EXISTING AND
 PROPOSED ON-STREET PARKING STALLS. PROVIDE THE NUMBER
 OF METERED STALLS THAT ARE BEING REMOVED OR RELOCATED,
 IF ANY
 16) SATISFIED. ARE THERE ANY GATES PROPOSED? IF SO,
 CLEARLY SHOWCASE THE REQUIRED 20 FEET SETBACK DISTANCE
 FROM THE BACK OF THE SIDEWALK
 17) SATISFIED. IS VALET SERVICE PROPOSED? IF SO,
 PROVIDE AN OPERATIONAL ANALYSIS. DETAILS OF THE
 ANALYSIS SHOULD BE DISCUSSED DURING THE METHODOLOGY
 MEETING
 18) SATISFIED. PROVIDE AND PROPERLY MARK A TURN-AROUND
 SPACE/STALL AT EACH DEAD-END OF THE GARAGE. FROM SHEET
 A2.1 IT IS NOT CLEAR WHERE AND IF THE LOADING ZONE IS
 CONNECTED TO THE FIRST FLOOR OF THE NORTHERN GARAGE.
 PLEASE CLARIFY, AS A TURN-AROUND SPACE MAY BE NEEDED AT
 THAT LOCATION OTHERWISE. SEVERAL DEAD-ENDS ARE MISSING
 OR THE TURN-AROUND SPACES ARE NOT PROPERLY MARKED
 19) SATISFIED. IN THE GARAGE PLANS, ALL THE DRIVE
 AISLES, RAMPS AND AT LEAST A SET OF PARKING SPACES IN
 EACH FLOOR SHOULD BE DIMENSIONED
 20) SATISFIED. PER CITY CODE SEC94-111(C)(1): ???IN
 THOSE CASES WHERE THE SIDE OF ANY STALL IS ADJACENT TO
 A WALL, FENCE, BUILDING, OR OTHER PHYSICAL OBSTRUCTION,
 THE STALL WIDTHS SHALL BE INCREASED BY A MINIMUM OF ONE
 FOOT. WHERE THERE IS AN OBSTRUCTION ON BOTH SIDES OF
 THE STALL, THE STALL WIDTHS SHALL BE INCREASED BY A
 MINIMUM OF TWO FEET.???
 21) PARTIALLY SATISFIED. HOW MANY GARAGE FLOORS ARE
 THERE? SHEET A2.3 SHOWS TWO UP-RAMPS FROM THE THIRD
 FLOOR, IS THERE A FOURTH? PLEASE CLARIFY OR CORRECT THE
 TEXT/ARROWS. AWAITING NEXT ROUND OF PLANS TO CLEAR THIS
 COMMENT
 22) NOT SATISFIED. INSTALL CROSSWALKS ON THE NORTHERN
 AND EASTERN LEG OF THE ROSEMARY AND 4TH ST
 INTERSECTION. THERE IS A PORTION OF THE ONE-WAY DRIVE
 WITHIN PUBLIC ROW; THUS, A CROSSWALK AND CORRESPONDING
 RAMPS ARE WARRANTED. DRAWINGS CAN BE REVISED AT
 ENGINEERING PERMITTING. HOWEVER, AGREEMENT AND
 CONFIRMATION OF THE CROSSWALKS IMPLEMENTATION SHOULD BE
 PROVIDED AT THIS STAGE
 23) SATISFIED. SHEET C-8 POINTS AT GATE(S) AT THE
 EASTERN LEG OF THE ROSEMARY AND 4TH INTERSECTION. ARE
 THOSE PEDESTRIAN AND/OR VEHICULAR GATES? IF SO, THEY
 MAY NEED TO BE MOVED FURTHER EAST TO ACCOMMODATE THE
 PEDESTRIAN CROSSING
 24) SATISFIED. PROVIDE BIKE RACKS WITHIN OR NEARBY THE
 PUBLIC OPEN SPACE AREA
 25) SATISFIED. PROVIDE A CONSTRUCTION MANAGEMENT PLAN.
 PLEASE REFER TO CITY CODE 86-246 FOR DETAILS
 26) DUE TO THE PROXIMITY TO THE INTERSECTION AND THE
 ROAD CONFIGURATION, THE DRIVEWAY ON 3RD ST SHOULD BE
 RIGHT-IN ONLY, NO LEFT-TURNING INBOUND MOVEMENTS SHOULD
 BE ALLOWED. PLEASE INSTALL AN ISLAND AT THE DRIVEWAY
 DESIGNED TO ENFORCE SUCH VEHICULAR MOVEMENT PROHIBITION
  
  
  
 VALERIO ORICCHIO
 CITY TRANSPORTATION ENGINEER
 561-494-1092
 [email protected]
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved