2022-11-11 02:42:02TRAFFIC COMMENTS
 1) SATISFIED. PROVIDE A DETAILED TRAFFIC STUDY. A
 METHODOLOGY MEETING SHALL BE SCHEDULED PRIOR TO
 DRAFTING THE ANALYSIS.
 2) PLEASE INSERT PERTINENT SUMMARY TABLES AND FIGURES
 WITHIN THE MAIN BODY OF THE REPORT, SUCH AS DRIVEWAY
 VOLUMES, SITE LOCATION, TRIP GENERATION, LOS SUMMARY,
 ETC. APPENDIX SHOULD BE USED AND REFERENCED FOR LARGE
 TABLES AND FIGURES SUCH AS SYNCHRO OUTPUTS, SIGNAL
 PLANS, BACKGROUND VOLUMES, ETC. SEVERAL SAMPLE TRAFFIC
 STUDIES HAVE BEEN PROVIDED. PLEASE REFER TO THOSE
 STUDIES FOR PROPER FORMATTING AND REFERENCING
 3) PLEASE NAME AND/OR NUMBER EACH TABLE, FIGURE AND
 REFERENCED DOCUMENT
 4) PLEASE INSERT PAGE NUMBERING THROUGHOUT THE REPORT,
 INCLUDING THE APPENDIX, AND UPDATE THE TABLE OF CONTENT
 ACCORDINGLY
 5) PLEASE REVISE FIGURE 2. PERCENTAGES SHOULD BE PLACED
 MID-BLOCK AND PROPERLY ADD-UP. IT SEEMS ONLY 50% OF THE
 TRAFFIC IS COMING IN/OUT OF THE SITE
 6) PLEASE REVISE FIGURE 3. TURNING MOVEMENTS WITH NO
 VOLUMES SHOULD BE REMOVED, DAILY TRAFFIC VOLUMES
 PROVIDED
  
 SITE COMMENTS
 7) NOT SATISFIED. PROVIDE A CLEAN TRANSPORTATION
 SPECIFIC SITE PLAN FOR THE GROUND FLOOR. SHOWCASING
 TRANSPORTATION RELATED FEATURES (E.G. ROADWAY WIDTHS,
 DRIVING AISLES, PARKING STALLS, SIDEWALK, CURB, GUTTER,
 DRIVEWAY, GATES, CROSSWALKS, VISIBILITY TRIANGLE,
 CORNER & DRIVEWAY SEPARATION DISTANCES, SLOPES, ETC.)
 PROPERLY LABELED AND DIMENSIONED. THE SITE PLAN SHOULD
 BE NAMED T-1.0. PLEASE PROVIDE A SPECIFIC SITE PLAN AS
 REQUESTED. SHEET A1 AND C5 DO NOT PROPERLY DEPICT NOR
 PROVIDE ALL THE REQUESTED ITEMS. MOREOVER, ITEMS
 IMPACTING PEDESTRIAN MOVEMENT SUCH AS PLANTERS AND
 TRAFFIC/UTILITY POLES ALONG THE SIDEWALK AREAS MUST BE
 SHOWN; BASED ON THOSE ITEMS AND ALONG CHOKE POINTS, THE
 EFFECTIVE SIDEWALK WIDTH SHOULD BE PROPERLY SHOWN AND
 DIMENSIONED
 8) NOT SATISFIED. IN THE T-1.0 SITE PLAN, PLEASE
 SHOWCASE BASIC CURB DETAILS (E.G. DRIVEWAY, CURB CUTS,
 PAVEMENT MARKINGS, PARKING STALLS, GARAGE ENTRANCES,
 ETC.) ON THE OPPOSITE SIDE OF THE ROADS SURROUNDING THE
 PROPOSED DEVELOPMENT. PLEASE PROVIDE A SPECIFIC
 TRANSPORTATION SITE PLAN AS REQUESTED
 9) PARTIALLY SATISFIED. THE PAVEMENT, MARKING & SIGNAGE
 PLAN IS INCOMPLETE. PLEASE PROVIDE ALL EXISTING AND
 PROPOSED FEATURES WITHIN THE PROPOSED DEVELOPMENT AND
 ALONG ALL THE ROADS FRONTING THE SITE. THIS SITE PLAN
 CAN BE CONSIDERED PART OF THE TRANSPORTATION REVIEW AND
 COULD BE EITHER INCLUDED IN THE T-1 SITE PLAN OR NAMED
 T-1.2. RESPONSE LETTER INDICATES SHEET C-7, CORRECT
 SHEET WOULD BE C-8. NONETHELESS, INSTALL A ONE-WAY SIGN
 ON THE EAST LEG OF THE ROSEMARY & 4TH ST INTERSECTION,
 STOP SIGN AND STOP BARS SHOULD BE INSTALLED AT EACH
 GARAGE AND DRIVEWAY EXITS, SERVICE DRIVEWAYS SHOULD BE
 INDICATED AD SIGNED AS SUCH, DEAD-END DRIVEWAYS SHOULD
 BE SIGNED AS SUCH.
 10) NOT SATISFIED. PROVIDE AUTOTURN ANALYSIS FOR
 GARBAGE TRUCK AND/OR SERVICE VEHICLES DRIVING IN AND
 OUT OF THE PROPOSED DEVELOPMENT WITH VEHICLE DYNAMIC
 ENVELOPES AND WHEEL PATHS CLEARLY DISTINCT AND DEFINED
 IN DIFFERENT COLORS. SITE PLAN(S) CONTAINING THE
 ANALYSIS SHOULD BE CONSIDERED PART OF THE
 TRANSPORTATION REVIEW AND NAMED ACCORDINGLY (E.G. T1.2,
 T-3). ENGINEERING SERVICES CAN PROVIDE SAMPLE AUTOTURN
 ANALYSES
 11) SATISFIED. IDENTIFY AND DESIGNATE AN EASILY
 ACCESSIBLE MICRO-MOBILITY STATION AREA (MINIMUM 8 X 20
 FEET) AND PROVIDE BASIC ELECTRIFICATION READINESS WITH
 THE FOLLOWING SPECS: A CONDUIT (2-INCH SCHEDULE 40 PVC)
 TO THE POWER SOURCE WITH AN ELECTRICAL PULL BOX (240V -
 10,000W CIRCUIT). PLEASE INSERT THIS ITEM IN THE T-1 OR
 T-2 SITE PLAN
 12) PARTIALLY SATISFIED. DEPENDING ON THE OUTCOME OF
 THE TRAFFIC ANALYSIS, PROVIDE TRANSPORTATION DEMAND
 MANAGEMENT (TDM) MEASURES. PLEASE PROVIDE A NUMBERED
 AND SPECIFIC LIST OF POTENTIAL TDMS IN THE TRAFFIC
 STUDY
 13) SATISFIED. PROVIDE A PARKING TABLE SHOWCASING THE
 NUMBER OF REQUIRED AND PROVIDED PARKING SPACES,
 INCLUSIVE OF ADA AND BICYCLE ONES
 14) SATISFIED. IN THE PAVEMENT, MARKING & SIGN PLAN,
 PROVIDE A TABLE SHOWCASING THE NUMBER OF EXISTING AND
 PROPOSED ON-STREET PARKING STALLS. PROVIDE THE NUMBER
 OF METERED STALLS THAT ARE BEING REMOVED OR RELOCATED,
 IF ANY
 15) SATISFIED. ARE THERE ANY GATES PROPOSED? IF SO,
 CLEARLY SHOWCASE THE REQUIRED 20 FEET SETBACK DISTANCE
 FROM THE BACK OF THE SIDEWALK
 16) SATISFIED. IS VALET SERVICE PROPOSED? IF SO,
 PROVIDE AN OPERATIONAL ANALYSIS. DETAILS OF THE
 ANALYSIS SHOULD BE DISCUSSED DURING THE METHODOLOGY
 MEETING
 17) PARTIALLY SATISFIED. PROVIDE AND PROPERLY MARK A
 TURN-AROUND SPACE/STALL AT EACH DEAD-END OF THE GARAGE.
 FROM SHEET A2.1 IT IS NOT CLEAR WHERE AND IF THE
 LOADING ZONE IS CONNECTED TO THE FIRST FLOOR OF THE
 NORTHERN GARAGE. PLEASE CLARIFY, AS A TURN-AROUND SPACE
 MAY BE NEEDED AT THAT LOCATION OTHERWISE. SEVERAL
 DEAD-ENDS ARE MISSING OR THE TURN-AROUND SPACES ARE NOT
 PROPERLY MARKED
 18) IN THE GARAGE PLANS, ALL THE DRIVE AISLES, RAMPS
 AND AT LEAST A SET OF PARKING SPACES IN EACH FLOOR
 SHOULD BE DIMENSIONED
 19) PER CITY CODE SEC94-111(C)(1): ???IN THOSE CASES
 WHERE THE SIDE OF ANY STALL IS ADJACENT TO A WALL,
 FENCE, BUILDING, OR OTHER PHYSICAL OBSTRUCTION, THE
 STALL WIDTHS SHALL BE INCREASED BY A MINIMUM OF ONE
 FOOT. WHERE THERE IS AN OBSTRUCTION ON BOTH SIDES OF
 THE STALL, THE STALL WIDTHS SHALL BE INCREASED BY A
 MINIMUM OF TWO FEET.???
 20) HOW MANY GARAGE FLOORS ARE THERE? SHEET A2.3 SHOWS
 TWO UP-RAMPS FROM THE THIRD FLOOR, IS THERE A FOURTH?
 PLEASE CLARIFY OR CORRECT THE TEXT/ARROWS
 21) INSTALL CROSSWALKS ON THE NORTHERN AND EASTERN LEG
 OF THE ROSEMARY AND 4TH ST INTERSECTION
 22) SHEET C-8 POINTS AT GATE(S) AT THE EASTERN LEG OF
 THE ROSEMARY AND 4TH INTERSECTION. ARE THOSE PEDESTRIAN
 AND/OR VEHICULAR GATES? IF SO, THEY MAY NEED TO BE
 MOVED FURTHER EAST TO ACCOMMODATE THE PEDESTRIAN
 CROSSING
 23) PROVIDE BIKE RACKS WITHIN OR NEARBY THE PUBLIC OPEN
 SPACE AREA
 24) PROVIDE A CONSTRUCTION MANAGEMENT PLAN. PLEASE
 REFER TO CITY CODE 86-246 FOR DETAILS.
  
 VALERIO ORICCHIO
 CITY TRANSPORTATION ENGINEER
 561-494-1092
 [email protected]
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved