| 2023-02-23 11:39:40 | THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE |
| | 2/17/2023 SUBMITTAL: |
| | |
| | 1. [NOT SATISFIED] THE CITY'S OFFICIAL VERTICAL DATUM |
| | IS NGVD1929. THE CITY HAS ALLOWED THE USE OF NAVD1988 |
| | AS LONG AS THE CONVERSION EQUATION TO NGVD1929 AT THE |
| | PROJECT LOCATION IS PROVIDED. PROVIDE VERTICAL DATUM |
| | CONVERSION TO NGVD1929 ON THE SURVEYS. SEVERAL OF THE |
| | SURVEYS LIST NAVD1988 AS THE VERTICAL DATUM BUT THERE |
| | MAY NOT BE ELEVATION DATA ON THE SURVEYS. EVERY SHEET |
| | WITH ELEVATION INFORMATION SHOULD LIST THE VERTICAL |
| | DATUM AND THE CONVERSION EQUATION TO NGVD1929. |
| | |
| | 2. [NOT SATISFIED] PROVIDE SCALE BAR ON THE |
| | ARCHITECTURAL PLANS. THE LISTED SCALES (1/8 INCH = 1 |
| | FEET) ON THE FLOOR PLANS (SHEETS A2.2, ETC.) ARE DOUBLE |
| | THE SCALE OF WHAT IS PRESENTED ON THE DRAWINGS. |
| | |
| | 3. [SATISFIED] SHOW UTILITIES ON THE LANDSCAPE PLANS. |
| | |
| | 4. [PARTIALLY SATISFIED] SHOW AND LABEL ALL EXISTING |
| | UTILITY LINES (SIZE, MATERIAL, TYPE - STORM, SAN., WM, |
| | ETC.) ON THE ENGINEERING PLANS. |
| | |
| | 5. [NOT SATISFIED - FENCE SHOULD BE REMOVED] PORTIONS |
| | OF NORTH AND EAST EXISTING CHAIN LINK FENCING IS ON |
| | PROPERTY NOT OWNED BY THE APPLICANT. |
| | |
| | 6. [SATISFIED] PORTION OF PROPOSED NORTH DRIVEWAY APRON |
| | TO W. RAILROAD AVE WILL BE ON PROPERTY NOT OWNED BY |
| | APPLICANT. |
| | |
| | 7. [SATISFIED] PORTION OF ROADWAY, SIDEWALK AND |
| | DRAINAGE SYSTEM IN THE MIDDLE OF THE DEVELOPMENT IS |
| | LOCATED ON PROPERTY NOT OWNED BY THE APPLICANT. |
| | |
| | 8. [NOT SATISFIED] PROPOSED SIDEWALK ON ADJACENT |
| | PROPERTY TO THE NORTH ALONG W. RAILROAD AVE DOES NOT |
| | ALIGN WITH THE EXISTING SIDEWALK. |
| | |
| | 9. [NOT SATISFIED - RESPONSE TO COMMENT NOT FOUND] |
| | SIDEWALK EASEMENT WILL BE NEEDED FOR THE PROPOSED |
| | SIDEWALK ALONG THE SOUTH AND EAST PROPERTY LINES AND |
| | POSSIBLY THE SIDEWALK ENCROACHMENT ON THE WEST PROPERTY |
| | LINE. |
| | |
| | 10. [SATISFIED] SHOW SIDEWALK CONNECTION AND CURB RAMP |
| | TO THE CROSSWALK ON 3RD STREET. |
| | |
| | 11. [NOT SATISFIED] SIDEWALK EAST OF EAST DRIVEWAY TO |
| | 3RD STREET WILL BE ON PROPERTY NOT OWNED BY THE |
| | APPLICANT NOR DOES THE PROPOSED SIDEWALK ALIGN WITH THE |
| | EXISTING SIDEWALK. |
| | |
| | 12. [NOT SATISFIED] DRIVEWAY APRONS WITHIN THE RIGHT OF |
| | WAY SHOULD BE CONCRETE. |
| | |
| | 13. [NOT SATISFIED] DRIVEWAY LOCATIONS WILL AFFECT |
| | EXISTING DRAINAGE STRUCTURES WITHIN THE RIGHT OF WAY. |
| | |
| | 14. [NOT SATISFIED] PROVIDE CROSS SECTIONS FOR THE |
| | FOLLOWING. SHOW, IF APPLICABLE, RIGHT OF WAY LINE, |
| | STREET NAME, GRADE BREAKS, SURFACE FEATURES, DIMENSIONS |
| | FROM RIGHT OF WAY TO BACK OF SIDEWALK, FACE OF |
| | BUILDING, HIGH POINTS OF DRIVEWAYS, BACK OF CURB, ETC. |
| | A. ALL DRIVEWAY CONNECTIONS TO THE RIGHT OF WAY. |
| | SECTION TO EXTEND FROM CENTERLINE OF RIGHT OF WAY TO 5 |
| | FEET BEYOND HIGH POINT OF DRIVEWAY. |
| | B. NORTH-SOUTH SECTION ON THE 4TH STREET DRIVE |
| | EXTENSION FROM FACE OF BUILDING TO FACE OF BUILDING. |
| | C. FROM CENTERLINE OF RIGHT OF WAY TO EACH BUILDING |
| | FACE. |
| | D. FROM NORTH FACE OF NORTH BUILDING TO THE EXISTING |
| | PARKING LOT ON THE PROPERTY TO THE NORTH. THE SECTION |
| | TO BE LOCATED WITHIN THE LONGER NORTH PROPERTY LINE. |
| | |
| | 15. [NOT SATISFIED] DRAW THE OUTLINE OF THE |
| | EXFILTRATION TRENCH TO THE DESIGN WIDTH (EXFILTRATION |
| | TRENCH DETAIL SHOWS 8 FEET WIDE TRENCH) ON THE PLANS. |
| | FOR THE EXFILTRATION TRENCH ALONG W. RAILROAD AVE., THE |
| | TRENCH WILL BE THE WIDTH OF THE SIDEWALK AND EXTEND |
| | FROM THE RIGHT OF WAY LINE TO THE BUILDING FACE. FOR |
| | THE EXFILTRATION TRENCH ALONG THE EXTENSION OF 4TH |
| | STREET, THE CENTER OF THE PIPE IS LESS THAN 5 FEET FROM |
| | THE SOUTH BUILDING. BUILDING FOUNDATIONS WILL NEED TO |
| | BE DESIGNED SO THAT THE SLAB WILL NOT BE UNDERMINED |
| | WHEN THE EXFILTRATION TRENCH WILL BE REPLACED WHEN IT |
| | IS NO LONGER FUNCTIONING AS DESIGNED. ANY SLAB OR TREE |
| | ROOT BARRIER ADJACENT TO THE TRENCH WILL IMPEDE THE |
| | FLOW OUT THAT SIDE OF THE TRENCH AND SHOULD BE |
| | ACCOUNTED FOR IN THE EXFILTRATION TRENCH EQUATION. |
| | |
| | 16. [NOT SATISFIED - RESPONSE TO COMMENT NOT FOUND] |
| | CONSIDER THERE WILL BE PROPER VERTICAL CLEARANCE FOR |
| | MAINTAINING THE DRAINAGE SYSTEM AND REPLACING THE |
| | EXFILTRATION TRENCH SYSTEM WHEN IT IS NO LONGER |
| | FUNCTIONING AS DESIGNED WITHIN THE ENCLOSED PARKING |
| | AREAS OF THE BUILDING. |
| | |
| | 17. [NOT SATISFIED - RESPONSE TO COMMENT NOT FOUND.] |
| | CONSIDER LOW IMPACT DEVELOPMENT DRAINAGE SYSTEMS IN |
| | LIEU OR IN COMBINATION WITH THE EXFILTRATION TRENCH |
| | SYSTEM. |
| | |
| | 18. [PARTIALLY SATISFIED - SOME STRUCTURES ARE MISSING |
| | RIM ELEVATIONS] NUMBER THE DRAINAGE STRUCTURES FOR EASE |
| | OF REFERENCE. NO DESIGN INFORMATION (RIM, INVERT |
| | ELEVATIONS) IS PROVIDED. |
| | |
| | 19. [PARTIALLY SATISFIED - LABEL WAS REMOVED. ADD THE |
| | LABEL BACK TO THE PGD PLAN AND POINT TO THE RIGHT |
| | CONNECTION] THE OUTFALL CONNECTION TO CITY DRAINAGE |
| | SYSTEM APPEARS TO BE MISLABELED. IT IS SHOWN POINTING |
| | TO THE FIRST NORTH-SOUTH PIPE SOUTH OF THE 4TH STREET |
| | EXTENSION AND EAST OF THE BUILDING. |
| | |
| | 20. [PARTIALLY SATISFIED] SIGNING AND PAVEMENT |
| | MARKINGS: |
| | A. [NOT SHOWN] STOP BAR AND SIGN NEEDED FOR SERVICE |
| | DRIVE DRIVEWAY AND GARAGE ACCESS DRIVEWAY TO W. |
| | RAILROAD AVE. |
| | B. [NOT SHOWN] STOP BAR AND SIGN NEEDED FOR THE TWO |
| | DRIVEWAYS TO 3RD STREET. |
| | C. [SATISFIED] DO NOT ENTER AND ONE-WAY SIGNS AT EAST |
| | END OF 4TH STREET EXTENSION DRIVE. |
| | D. [NOT SHOWN] ONE WAY SIGN AT WEST END OF 4TH STREET |
| | EXTENSION DRIVE. |
| | E. [NOT SHOWN] SHARED BIKE LANE SIGNS FOR N. ROSEMARY. |
| | F. [REVIEW COLOR OF CENTERLINE STRIPING] PROVIDE |
| | STRIPING PLAN FOR N. ROSEMARY AVE. IS THE PLAN TO NOT |
| | RESTORE THE NEIGHBORHOOD MUSICAL THEME PAVEMENT |
| | STRIPING? |
| | |
| | 21. [NOT SATISFIED] SHEET C-9 INCLUDES A VEHICULAR AREA |
| | PAVER DETAIL. PLEASE IDENTIFY WHERE THESE AREAS ARE ON |
| | THE PGD PLAN. |
| | NEW COMMENTS (2/17/2023 SUBMITTAL) |
| | |
| | 22. JUSTIFY THE OUTFALL DIAMETER LARGER THAN 15 INCHES. |
| | |
| | 23. THE EXISTING DRAINAGE STRUCTURE THAT THE OUTFALL |
| | PIPE CONNECTS INTO MAY NOT BE BIG ENOUGH TO ACCOMMODATE |
| | THE NEW PIPE CONNECTION. |
| | |
| | 24. IF THE PAVEMENT ADJACENT TO AN EXISTING CURB RAMP |
| | IS MODIFIED IN ANY MANNER (INCLUDING MILL AND |
| | RESURFACING), THE CURB RAMP IS TO BE RECONSTRUCTED TO |
| | MEET CURRENT ADA CRITERIA IF THE RAMP DOES NOT MEET ADA |
| | CRITERIA. |
| | |
| | 25. ALL ONSITE DRAINAGE INFRASTRUCTURE SHALL NOT |
| | ENCROACH INTO THE RIGHT OF WAY. |
| | |
| | CONDITIONS FOR SITE PLAN APPROVAL |
| | A. LIST VERTICAL DATUM REFERENCE AND CONVERSION |
| | EQUATION TO NGVD1929 ON ALL SHEETS WITH ELEVATION |
| | INFORMATION. |
| | |
| | B. SHOW AND LABEL ALL EXISTING UTILITY LINES (SIZE, |
| | MATERIAL, TYPE ? STORM, SAN., WM, ETC.) ON THE |
| | ENGINEERING PLANS. |
| | |
| | C. SHOW THE PROPOSED SIDEWALKS BEHIND A LANDSCAPE STRIP |
| | TRANSITIONING TO THE EXISTING SIDEWALKS ADJACENT TO THE |
| | CURB AT ALL PROPERTY LINES. |
| | |
| | D. DRIVEWAY APRONS WITHIN THE RIGHT OF WAY TO BE |
| | CONCRETE PER CITY DETAILS GC-5 AND GC-6. |
| | |
| | E. CALLOUT MODIFICATIONS TO EXISTING DRAINAGE |
| | STRUCTURES THAT WILL BE IMPACTED BY THE DEVELOPMENT. |
| | VALLEY GUTTER MAY BE NEEDED ACROSS DRIVEWAY CONNECTIONS |
| | TO THE STREET. |
| | |
| | F. PROVIDE CROSS SECTIONS PER COMMENT #14 ABOVE. |
| | SIDEWALK AREA ACROSS DRIVEWAY APRONS TO BE MEET WIDTH |
| | AND ADA CRITERIA. |
| | |
| | G. COORDINATE LANDSCAPING AND STORMWATER SYSTEM DESIGN. |
| | THE PROPOSED WIDTH OF THE AXFILTRATION TRENCHES WILL |
| | TAKE UP MOST IF NOT ALL OF THE PLANTING AREA WHERE SOME |
| | OF THE EXFILTRATION TRENCHES ARE LOCATED. |
| | |
| | H. EXFILTRATION TRENCHES LOCATED WITHIN THE BUILDING OR |
| | UNDERNEATH BUILDING SUFFICIENT VERTICAL CLEARANCE FOR |
| | MAINTENANCE VEHICLES TO CLEAN THE DRAINAGE SYSTEM AND |
| | FOR CONSTRUCTION EQUIPMENT TO REPLACE THE EXFILTRATION |
| | TRENCHES WHEN THEY DO NOT FUNCTION AS DESIGNED. |
| | |
| | I. PAVEMENT MARKINGS AND SIGNAGE TO BE IN ACCORDANCE |
| | WITH MUTCD. LABEL ALL PROPOSED MARKINGS AND SIGNS. |
| | |
| | J. SHOULD THE 4TH STREET EXTENSION EASEMENT BECOME |
| | PUBLIC RIGHT OF WAY, MAINTENANCE RESPONSIBILITY OF THE |
| | DRAINAGE SYSTEM WITHIN THE R/W SHALL BECOME THE |
| | RESPONSIBILITY OF THE DEVELOPER. |
| | |
| | |
| | TRACY WARD, PE |
| | SENIOR STORMWATER ENGINEER |
| | ENGINEERING SERVICES DEPARTMENT |
| | 561-494-1120 (O) |