| Plan Review Notes For Project Z22080012 |
| Project Number |
Z22080012 |
|
| Review Stop |
PU |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2023-01-24 10:21:44 | -MANHOLES WITH LATERALS BEING CORED INTO THEM WILL | | | REQUIRE REHABBING | | | -DENOTE ANY AND ALL WATER SERVICES THAT ARE TO BE | | | REMOVED AND CAPPED AT MAIN | | | -PROVIDE CALCULATIONS ON PLANS OF EXISTING AND PROPOSED | | | CONDITIONS FOR WATER AND SEWER | | | -ALL INSTALLED WATER MAIN MUST BE DIP PER CITY | | | STANDARDS | | | -DOUBLE VALVING AND JUMPER ASSEMBLY WILL BE NECESSARY | | | FOR TIE-INS TO EXISTING WATER MAIN FOR PIGGING AND | | | FLUSHING TESTING PER CITY DETAIL P-6 | | | -LABEL ALL FITTING THAT ARE TO BE INSTALLED | | | -INCLUDE ALL DRY UTILITIES ON THE PLANS, INCLUDING | | | THOSE PROPOSED FOR INSTALLATION | | | -PROFILE 4 SHOWS PROPOSED WATER MAIN TO ONLY BE 9.5 | | | INCHES ABOVE EXISTING 30" SEWER MAIN | | | -HAVE AN EMERGENCY PREPAREDNESS PLAN IN THE EVENT OF | | | THE 30" SEWER MAIN COLLAPSING DURING CONSTRUCTION | | | | | | RICKY ELIZONDO [email protected] | | | | | | | | | |
| |
Print |
|