Plan Review Notes
Plan Review Notes For Project Z22070024
Project Number Z22070024
Review Stop STORM
Sequence Number 1
Notes
Date Text
2022-08-11 06:53:32THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL
 DETAILS, DESIGN CALCULATIONS AND THE POLLUTION
 PREVENTION PLAN WILL BE REVIEWED AS PART OF THE
 ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT
 APPLICATION PROCESSES.
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE
 PLAN APPROVAL:
  
 1. THE CITY?S OFFICIAL VERTICAL DATUM IS NGVD1929. THE
 CITY HAS ALLOWED THE USE OF NAVD1988 AS LONG AS THE
 CONVERSION EQUATION TO NGVD1929 AT THE PROJECT LOCATION
 IS PROVIDED. PROVIDE THE VERTICAL DATUM CONVERSION TO
 NGVD1929 ON THE SURVEY.
  
 2. PROVIDE CROSS SECTIONS FROM CENTERLINE OF RIGHTS OF
 WAY AND WEST PROPERTY LINE TO THE BUILDING FACES. SHOW
 AND LABEL SURFACE FEATURES, GRADE BREAKS, GENERAL
 SURFACE SLOPES, FINISHED FLOOR ELEVATION, RIGHT OF WAY
 LINES WITH THE STREET IDENTIFIED, DIMENSIONS FROM RIGHT
 OF WAY TO SURFACE FEATURES. NOTE THERE IS OVER A FOOT
 DIFFERENCE BETWEEN THE PROPOSED FFE AND THE EXISTING
 GRADES ON 10TH ST.
  
 3. SHOW UTILITIES ON THE LANDSCAPE PLANS AND COORDINATE
 PLANTINGS WITH THE UTILITIES.
  
 4. CONSIDER REDUCING THE PARKING SPACE DEPTHS FROM 18.5
 FEET TO 18 FEET (INCLUDING THE 2 FEET OF OVERHANG).
  
 5. SOUTH DRIVEWAY ENCROACHING ONTO ADJACENT PROPERTY.
  
 6. DRIVEWAY APRON WITHIN THE RIGHT OF WAY SHOULD BE
 CONCRETE.
  
 7. INSTALL TYPE F CURB AND GUTTER ALONG THE FRONTAGE OF
 10TH STREET.
  
 8. REMOVE CONCRETE WALKWAY BETWEEN CURB AND SIDEWALK ON
 10TH STREET.
  
 9. LABEL PROPOSED SIDEWALKS, CURB TYPES, ETC. ON- AND
 OFF-SITE THAT WILL INCLUDED WITH THIS PROJECT.
  
 10. ON ENGINEERING PLANS, INCLUDE ALL HATCHING PATTERNS
 IN THE SHEET LEGEND. THE LEGEND INCLUDES PROPOSED
 TRUEGRID. IDENTIFY WHERE THIS WILL BE INSTALLED AND
 PROVIDE DETAILS FOR IT.
  
 11. STOP BAR AND SIGN WILL BE NEEDED.
  
 12. PROVIDE EXISTING SPOT GRADES FOR THE ALLEY.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO
 ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL.
  
 1. DRAINAGE SYSTEM TO BE DESIGNED TO MEET SFWMD ERP
 CRITERIA. STORMWATER CALCULATIONS WILL BE REVIEWED WITH
 THE ENGINEERING PERMIT SUBMITTAL.
  
 2. PROVIDE COPY OF SFWMD ERP PERMIT MODIFICATION BEFORE
 START OF CONSTRUCTION.
  
 3. PROVIDE EROSION AND SEDIMENT CONTROL PLAN WITH THE
 ENGINEERING PERMIT SUBMITTAL.
  
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120 (O)
 561-351-0510 (M)
 [email protected]
  