| Date |
Text |
| 2022-08-11 06:50:55 | THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL |
| | DETAILS, DESIGN CALCULATIONS AND THE POLLUTION |
| | PREVENTION PLAN WILL BE REVIEWED AS PART OF THE |
| | ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT |
| | APPLICATION PROCESSES. |
| | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE |
| | PLAN APPROVAL: |
| | |
| | 1. THE CITY?S OFFICIAL VERTICAL DATUM IS NGVD1929. THE |
| | CITY HAS ALLOWED THE USE OF NAVD1988 AS LONG AS THE |
| | CONVERSION EQUATION TO NGVD1929 AT THE PROJECT LOCATION |
| | IS PROVIDED. PROVIDE THE VERTICAL DATUM CONVERSION TO |
| | NGVD1929 ON THE SURVEY. |
| | |
| | 2. ENGINEERING PLAN AND LANDSCAPE PLAN DO NOT MATCH |
| | ARCHITECTURAL SITE PLAN. |
| | |
| | 3. 24 FEET NEEDED AS BACKUP SPACE FOR 90-DEGREE |
| | PARKING. |
| | |
| | 4. ENGINEERING PLAN SHOWS DOORS OPENING AT BOTTOM OF |
| | EXTERIOR STAIRS. |
| | |
| | 5. SHOW UTILITIES ON THE LANDSCAPE PLANS AND COORDINATE |
| | PLANTINGS WITH THE UTILITIES. |
| | |
| | 6. PROVIDE A CONTROL STRUCTURE DETAIL. |
| | |
| | 7. PROVIDE CROSS SECTIONS FROM CENTERLINE OF RIGHTS OF |
| | WAY TO THE BUILDING FACES. SHOW AND LABEL SURFACE |
| | FEATURES, GRADE BREAKS, GENERAL SURFACE SLOPES, |
| | FINISHED FLOOR ELEVATION, RIGHT OF WAY LINES WITH THE |
| | STREET IDENTIFIED, DIMENSIONS FROM RIGHT OF WAY TO |
| | SURFACE FEATURES. |
| | |
| | 8. IDENTIFY THE GREEN DASHED LINE RUNNING NORTH-SOUTH |
| | BETWEEN THE GREASE TRAPS AND DRAINAGE SYSTEM ON SHEET |
| | C1.1. |
| | |
| | 9. SHOW MILL AND RESURFACE LIMITS. |
| | |
| | 10. CALLOUT WHERE NEW OR REPLACEMENT SIDEWALK WILL BE |
| | CONSTRUCTED AS PART OF THIS PROJECT. |
| | |
| | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO |
| | ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING |
| | BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL. |
| | |
| | 1. DRAINAGE SYSTEM TO BE DESIGNED TO MEET SFWMD ERP |
| | CRITERIA. STORMWATER CALCULATIONS WILL BE REVIEWED WITH |
| | THE ENGINEERING PERMIT SUBMITTAL. |
| | |
| | 2. PROVIDE COPY OF SFWMD ERP PERMIT MODIFICATION BEFORE |
| | START OF CONSTRUCTION. |
| | |
| | 3. PROVIDE EROSION AND SEDIMENT CONTROL PLAN WITH THE |
| | ENGINEERING PERMIT SUBMITTAL. |
| | |
| | TRACY WARD, PE |
| | SENIOR STORMWATER ENGINEER |
| | ENGINEERING SERVICES DEPARTMENT |
| | 561-494-1120 (O) |
| | 561-351-0510 (M) |
| | [email protected] |
| | |
| |