| 2023-04-11 10:32:46 | NO RESPONSE LETTER WAS SUBMITTED. |
| | |
| | COMMENTS FROM LINDA M. QUINONES-CINTRON, PROJECT |
| | COORDINATOR, ENGINEERING SERVICES AT 561-494-1085 |
| | [email protected] |
| | |
| | CHECK TO SEE IF FDEP FORMS FOR PROPOSED SANITARY SEWER |
| | ARE REQUIRED. |
| | |
| | PROVIDE CCTV VIDEO OF EXISTING SANITARY SEWER AND |
| | STORMWATER PIPES ALONG ENTIRE PROJECT FRONTAGE. |
| | |
| | COORDINATE WITH MARK HURLEY, FIELD CUSTOMER SERVICE |
| | SUPERVISOR WITH CITY OF WPB PUBLIC UTILITIES, REGARDING |
| | PLACEMENT OF BACKFLOW DEVICES AND WATER METERS. CONTACT |
| | HIM AT 561-494-2262 OR [email protected] |
| | |
| | FOR FORMAL ENGINEERING SUBMITTAL , PLANS SHALL SHOW |
| | PROPOSED LOCATIONS AND DIMENSIONS OF ALL WATER, |
| | STORMWATER, AND SANITARY AND SEWER LINES, INCLUDING |
| | STUBS TO EACH PROPERTY LINE FOR WATER AND SANITARY |
| | SEWERS, THE MAKE AND MODEL OF ALL VALVES, METERS, AND |
| | OTHERS DEVICES TO BE INSTALLED ON THE SYSTEM, CATCH |
| | BASINS, CULVERTS, DITCHES INCLUDING GRADES, PIPES |
| | SIZES, MATERIALS, ELEVATIONS, ASSUMPTIONS, |
| | CALCULATIONS, INVERT ELEVATIONS FOR ALL INLETS AND |
| | MANHOLES AND PROFILES OF SANITARY SEWER LINES. ALL |
| | AVAILABLE ELEVATION SHALL BE SHOWN ON THE PROFILE VIEW. |
| | DIRECTION OF FLOW SHALL BE SHOWN ON PLAN VIEW ON PLAN |
| | VIEW FOR ALL SANITARY AND STORM SEWERS. ADDITIONALLY, |
| | PLAN VIEW SHALL SHOW ALL EXISTING AND PROPOSED |
| | UNDERGROUND UTILITY LAYOUT, INCLUDING FIBER OPTIC, |
| | ELECTRIC, GAS, AND CABLEVISION & TELECOMMUNICATION |
| | FACILITIES LOCATED ON THE RIGHT-OF-WAY. PROVIDE PROFILE |
| | AND CLEARANCES AT ALL UTILITY CROSSINGS. |
| | |
| | PLEASE CLOUD/HIGHLIGHT PLAN REVISIONS OR CHANGES IN |
| | SCOPE FOR RESUBMITTAL OF DRAWINGS. |
| | |
| | FOR FORMAL ENGINEERING SUBMITTAL , CUT AND CAP |
| | UTILITIES NOT IN USE, AND REMOVE ANY ABANDONED UTILITY |
| | LINES LARGER THAN 2 INCHES FROM CITY RIGHT OF WAY. |
| | |
| | FOR FORMAL ENGINEERING SUBMITTAL, PROVIDE DEDICATED |
| | UTILITY EASEMENTS TO ALLOW ACCESS FOR CITY PERSONNEL TO |
| | PROPOSED UTILITY WATER METERS. |
| | |
| | FOR FORMAL ENGINEERING SUBMITTAL, PLEASE PROVIDE |
| | ENLARGED VIEW ON PLANS OF PROPOSED LOCATION OF WATER |
| | METER AND BACKFLOW PREVENTION. |
| | |
| | FOR FORMAL ENGINEERING SUBMITTAL, PLEASE CALLOUT |
| | DOMESTIC BACKFLOW PREVENTER AS RPPA AND FIRE BACKFLOW |
| | PREVENTER AS DCDA. SPECIFY LEAD FREE DESIGN ON ALL |
| | BACKFLOWS. |
| | |
| | FOR FORMAL ENGINEERING SUBMITTAL, SFWMD ERP AND NPDES |
| | NOI REQUIREMENTS WILL BE ENFORCED. |
| | |
| | -AN NOI IS REQUIRED FOR PROJECTS THAT: |
| | 1) DISTURB ONE OF MORE ACRES OF LAND OR DISTURB LESS |
| | THAN ON ACRE OF LAND BUT ARE PART OF A COMMON PLAN OF |
| | DEVELOPMENT OR SALE; AND |
| | 2) DISCHARGE STORMWATER TO SURFACE WATERS OF THE |
| | STATE OR TO SURFACE WATERS OF THE STATE THROUGH A |
| | MUNICIPAL SEPARATE STORM SEWER SYSTEM (MS4). |
| | -THE SFWMD ERP CAN BE OBTAINED THROUGH A 10-2 SELF |
| | CERTIFICATION THROUGH FDEP OR AN ERP APPLICATION |
| | THROUGH SFWMD. EITHER WAY, THE DEVELOPER/ENGINEER SHALL |
| | SUBMIT A COPY OF THE ERP PERMIT OR FDEP ACKNOWLEDGEMENT |
| | OF THE 10-2 CERTIFICATION. IF THE ENGINEERING PLANS DO |
| | NOT INCLUDE AN EROSION CONTROL PLAN, THEN THE |
| | CONTRACTOR SHOULD SUBMIT ONE PRIOR TO RECEIVING THE |
| | ENGINEERING PERMIT. |
| | |
| | FOR FORMAL ENGINEERING SUBMITTAL, PROVIDE PROFILES OF |
| | PROPOSED AND EXISTING WATER AND SEWER WITHIN RIGHT OF |
| | WAY AND SHOW ANY CROSSINGS/CONFLICTS. |
| | |
| | FOR FORMAL ENGINEERING SUBMITTAL, WHEN SUBMITTING |
| | APPROVED MATERIALS LIST, PLEASE PROVIDE MATERIAL/CUT |
| | SHEETS FOR ALL PROPOSED BACKFLOW DEVICES SHOWING |
| | SPECIFIC MODEL NUMBER AND SPECIFYING USC APPROVED |
| | LEAD-FREE DESIGN. |
| | |
| | FOR FORMAL ENGINEERING SUBMITTAL CLEARLY SHOW ROAD |
| | RIGHT OF WAY. |
| | |
| | FOR FORMAL ENGINEERING SUBMITTAL PROVIDE SANITARY |
| | ELEVATIONS AT MANHOLE TIE-IN. |
| | |
| | FOR FORMAL ENGINEERING SUBMITTAL, IF SANITARY LINES |
| | ARE PROPOSED IN ROW PLEASE SHOW ADJACENT SANITARY |
| | LATERAL LOCATIONS AND SHOW ADDRESSES OF ADJACENT |
| | PARCELS. |
| | |
| | FOR FORMAL ENGINEERING SUBMITTAL, IF WATER LINES ARE |
| | BEING REPLACED IN ROW, SHOW ADJACENT PARCEL ADDRESSES. |
| | |
| | FOR FORMAL ENGINEERING SUBMITTAL, WHEN TRENCHING IN IN |
| | CITY MAINTAINED ROADWAY AREAS ADD NOTE TO PROVIDE 50 |
| | FT. PAVEMENT RESTORATION TRANSITION ON EACH SIDE OF |
| | PROPOSED TRENCH PER CURRENT CITY OF WPB STANDARD DETAIL |
| | GC-8. |
| | |
| | PLEASE RESPOND TO ALL COMMENTS IN WRITING AND INCLUDE |
| | PROJECT NAME, ADDRESS AND PERMIT NUMBER (Z-XXXXXXXX). |
| | |
| |