| Date |
Text |
| 2022-08-10 22:25:01 | TRAFFIC COMMENTS |
| | 1) CORRECT THE EXEMPTION REFERENCE AS IT IS TRAFFIC |
| | CONCURRENCY EXCEPTION AREA (TCEA), NOT CRA. |
| | 2) SCHEDULE A METHODOLOGY MEETING. A FULL TRAFFIC STUDY |
| | IS NEEDED; EXEMPTION FROM COUNTY CONCURRENCY DOES NOT |
| | PRECLUDE THE CITY TO REQUEST MORE IN-DEPTH ANALYSIS, |
| | GIVEN THE SIGNIFICANT CHANGE IN LAND USE AND TRIP |
| | GENERATION TOGETHER WITH IMPACT TO THE SURROUNDING |
| | ROADWAY NETWORK |
| | 3) ALL CONCERNS AND COMMENTS PROVIDED BY THE COUNTY IN |
| | THE TPS LETTER SHALL BE ADDRESSED |
| | 4) MORE DETAILED TRANSPORTATION DEMAND MANAGEMENT (TDM) |
| | MEASURES SHALL BE DISCUSSED AND AGREED WITH CITY |
| | PLANNING AND ENGINEERING DEPARTMENTS |
| | 5) TRAFFIC SIGNAL WARRANT ANALYSES SHALL BE CONDUCTED |
| | AT EACH IMPACTED UNSIGNALIZED INTERSECTION ALONG PALM |
| | BEACH LAKES BLVD AND DIXIE HIGHWAY |
| | |
| | SITE COMMENTS |
| | 6) PROVIDE A CLEAN TRANSPORTATION SPECIFIC SITE PLAN. |
| | SHOWCASING TRANSPORTATION RELATED FEATURES (E.G. |
| | ROADWAY, DRIVING AISLES, PARKING STALLS, SIDEWALK, |
| | CURB, GUTTER, DRIVEWAY, GATES, ETC.) PROPERLY LABELED |
| | AND DIMENSIONED. PLEASE DO NOT SHOW ALL UNDERGROUND |
| | UTILITY LAYERS |
| | 7) IN THE TRANSPORTATION SITE PLAN, PLEASE SHOWCASE |
| | BASIC CURB DETAILS (E.G. DRIVEWAY, CURB CUTS, PAVEMENT |
| | MARKINGS, PARKING STALLS, ETC.) ON THE OPPOSITE SIDE OF |
| | THE ROADS SURROUNDING THE PROPOSED DEVELOPMENT. |
| | INCLUDING ALLEYWAYS. |
| | 8) PROVIDE AUTOTURN ANALYSIS FOR GARBAGE TRUCK AND/OR |
| | DELIVERY VEHICLES SERVICING THE PROPOSED DEVELOPMENT |
| | WITH VEHICLE DYNAMIC ENVELOPES AND WHEEL PATHS CLEARLY |
| | DISTINCT AND DEFINED. ANALYSIS SHOULD BE PROVIDED IN A |
| | SEPARATE FILE/DRAWING. PLEASE PROVIDE DOCUMENT NAME AND |
| | SHEET NUMBER SHOWCASING THE ANALYSIS |
| | 9) WHERE IS THE DUMPSTER LOCATION? |
| | 10) IS THE AREA IN FRONT OF THE RESTAURANT PEDESTRIAN |
| | ONLY OR VEHICLES MAY ACCESS IT? |
| | 11) SHOW THE TYPE OF CONTROL FOR EACH INTERSECTION |
| | SURROUNDING THE PROPOSED DEVELOPMENT (I.E. PAVEMENT |
| | MARKINGS AND SIGNAGE) |
| | 12) HOW ARE DELIVERIES PERFORMED? CLEARLY MARK AND |
| | DIMENSION THE DESIGNATED LOADING ZONE |
| | 13) PROVIDE CROSSWALKS ACROSS 7TH ST |
| | |
| | VALERIO ORICCHIO |
| | CITY TRANSPORTATION ENGINEER |
| | 561-494-1092 |
| | [email protected] |
| | |
| | |
| |
Print |