| Plan Review Notes For Project Z22070014 |
| Project Number |
Z22070014 |
|
| Review Stop |
TRAFFIC |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2022-08-11 04:24:48 | 1) PROVIDE COUNTY TPS LETTER, ONCE AVAILABLE | | | 2) PROVIDE FDOT ACCESS MANAGEMENT LETTER PERTAINING THE | | | DRIVEWAY ON N MILITARY TRAIL | | | 3) PROVIDE AND CLEARLY MARK A WALKWAY FROM THE ADA | | | STALL IN THE EASTERN PARKING LOT TO THE BUILDING | | | 4) PROVIDE AUTOTURN ANALYSIS FOR GARBAGE TRUCK AND/OR | | | SERVICE VEHICLES DRIVING IN AND OUT OF THE PROPOSED | | | DEVELOPMENT WITH VEHICLE DYNAMIC ENVELOPES AND WHEEL | | | PATHS CLEARLY DISTINCT AND DEFINED. ANALYSIS SHOULD BE | | | PROVIDED IN A SEPARATE FILE/DRAWING. PLEASE PROVIDE | | | DOCUMENT NAME AND SHEET NUMBER SHOWCASING THE ANALYSIS | | | 5) CLEARLY MARK THE LOADING ZONE(S) AND PROVIDE | | | DIMENSIONS | | | | | | VALERIO ORICCHIO | | | CITY TRANSPORTATION ENGINEER | | | 561-494-1092 | | | [email protected] | | | | | | |
| |
Print |
|