| Date |
Text |
| 2022-07-27 10:16:43 | Z22070014 - FPL BLDG, 5950 N MILITARY 7.26.22 SUB |
| | COMMENTS FROM RICK ROSSANO, SR. PROJECT COORDINATOR, |
| | ENGINEERING SERVICES AT 561-494-1098 [email protected] |
| | |
| | PLEASE ADVISE WHAT IS HAPPENING WITH THE EXISTING LIFT |
| | STATION ON THE NW AREA OF THE PROPERTY. |
| | |
| | GENERAL: |
| | O PLEASE RESPOND TO ALL COMMENTS IN WRITING, AND |
| | INCLUDE PROJECT NAME, ADDRESS AND PERMIT NUMBER |
| | (Z-XXXXXXXX). |
| | O PLEASE SUBMIT A FORMAL AS-BUILT REQUEST FOR ALL CITY |
| | OF WEST PALM BEACH-OWNED UTILITIES WITHIN THE PUBLIC |
| | RIGHT OF WAY FOR THE ENTIRE EXTENT OF THE LIMITS OF |
| | YOUR PROJECT. IDENTIFY TYPE OF UTILITY, LOCATION, PIPE |
| | MATERIAL, AGE AND SIZE. PLEASE CONTACT JANICE TARBILL |
| | IN THE WPB ENGINEERING SERVICES DEPARTMENT AT |
| | [email protected] OR 561-494-1079 FOR FURTHER |
| | ASSISTANCE. NOTE THAT FIELD RECORDS ARE FOR INFORMATION |
| | ONLY. FIELD VERIFY UTILITY LOCATIONS USING FIELD |
| | SURVEY, POT-HOLING, SOFT DIGS ETC. |
| | O PROVIDE EXISTING AND PROPOSED PERVIOUS AND IMPERVIOUS |
| | DATA. |
| | O SUBMIT COMPLETED LOS ANALYSIS SUMMARY TABLE DIRECTLY |
| | TO ENGINEERING (SHEET 33 OF CITY OF WPB DEVELOPMENT |
| | APPLICATION). PROVIDE CALCULATIONS ON PLANS OF EXISTING |
| | AND PROPOSED DEMANDS FOR WATER & SEWER (AVERAGE, |
| | MAXIMUM AND PEAK) AND FIRE FLOW DEMANDS. CALCULATIONS |
| | SHALL BE PER FAC 64E-6 FOR SEWER AND PER FAC 64-E.008 |
| | FOR WATER. |
| | O IT APPEARS THAT THERE ARE NO POTABLE WATER OR SEWER |
| | CONNECTIONS PROPOSED, PLEASE CONFIRM. |
| | |
| | FORMAL ENGINEERING REVIEW: |
| | O FOR FORMAL ENGINEERING SUBMITTAL, SFWMD ERP AND NPDES |
| | NOI REQUIREMENTS WILL BE ENFORCED. |
| | - AN NOI IS REQUIRED FOR PROJECTS THAT: |
| | - 1) DISTURB ONE OF MORE ACRES OF LAND OR DISTURB LESS |
| | THAN ON ACRE OF LAND BUT ARE PART OF A COMMON PLAN OF |
| | DEVELOPMENT OR SALE; |
| | - 2) DISCHARGE STORMWATER TO SURFACE WATERS OF THE |
| | STATE OR TO SURFACE WATERS OF THE STATE THROUGH A |
| | MUNICIPAL SEPARATE STORM SEWER SYSTEM (MS4). |
| | - THE SFWMD ERP CAN BE OBTAINED THROUGH A 10-2 SELF |
| | CERTIFICATION THROUGH FDEP OR AN ERP APPLICATION |
| | THROUGH SFWMD. EITHER WAY, THE DEVELOPER/ENGINEER SHALL |
| | SUBMIT A COPY OF THE ERP PERMIT OR FDEP ACKNOWLEDGEMENT |
| | OF THE 10-2 CERTIFICATION. |
| | O FOR FORMAL ENGINEERING SUBMITTAL, PLEASE PROVIDE |
| | CALCULATIONS OF PERVIOUS AND IMPERVIOUS AREAS FOR |
| | PROPOSED IMPROVED AREAS. |
| | QUESTIONS AND COORDINATION CONTACTS: |
| | O MARK HURLEY, FIELD CUSTOMER SERVICE SUPERVISOR WITH |
| | CITY OF WPB PUBLIC UTILITIES, REGARDING PLACEMENT OF |
| | BACKFLOW DEVICES AND WATER METERS. CONTACT HIM AT |
| | 561-822-2262 OR [email protected] |
| | O MIKE TECHNOW, PROJECT ENGINEER, PUBLIC UTILITIES |
| | DEPARTMENT AT 561-494-1047 OR [email protected] |
| | O TRACY WARD, SR. STORMWATER ENGINEER, ENGINEERING |
| | SERVICES DEPT. AT 561-494-1120 OR [email protected] |
| | |
| |
Print |