2022-08-11 11:17:17THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL
 DETAILS, DESIGN CALCULATIONS AND THE POLLUTION
 PREVENTION PLAN WILL BE REVIEWED AS PART OF THE
 ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT
 APPLICATION PROCESSES.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE
 PLAN APPROVAL:
  
 1. LAKEVIEW AVE AND OKEECHOBEE BLVD ARE MAINTAINED BY
 FDOT. ANY IMPROVEMENTS WITHIN THESE RIGHTS OF WAY WILL
 REQUIRE APPROVAL FROM FDOT.
  
 2. DEMOLITION PLANS APPEAR TO SHOW ELEVATIONS FOR
 DIFFERENT VERTICAL DATUMS.
  
 3. LABEL ALL STREETS ON ALL THE ENGINEERING PLANS (E.G.
 S. OLIVE AVE. ON SHEET C2.01).
  
 4. SHOW RIGHT OF WAY LINES WHERE DEMOLITION OR
 IMPROVEMENTS ARE PROPOSED. SHOW RIGHT OF WAY LINES ON
 OPPOSITE SIDE OF THE STREETS.
  
 5. CHEVRON STRIPING AT THE WEST END OF TRINITY PLACE
 APPEARS TO BE IN FRONT OF THE DRIVEWAY (SHEET C4.01).
 CAN PARKING SPACE BE SHIFTED TO THE EAST.
  
 6. HATCHING FOR PROPOSED CONCRETE SIDEWALK NOT SHOWN ON
 THE HORIZONTAL CONTROL PLANS OR PAVING, GRADING AND
 DRAINAGE PLANS.
  
 7. NO SIGNAGE SHOWN FOR CROSS WALKS.
  
 8. INCLUDE GRASS HATCHING PATTERN IN SHEET LEGEND.
  
 9. STRUCTURES ALONG NORTH SIDE OF OKEECHOBEE APPEAR TO
 BE PARTIALLY ON PRIVATE PROPERTY.
  
 10. CATCH BASINS ARE LISTED WITH RIM ELEVATIONS THAT
 APPEAR TO BE THE GRATE ELEVATION.
  
 11. FPL DUCT BANK ON OKEECHOBEE MAY BE IN CONFLICT WITH
 PROPOSED CATCH BASINS.
  
 12. DRIVEWAY APRONS SHOULD BE CONCRETE WITHIN THE RIGHT
 OF WAY.
  
 13. SHOW PROPOSED AND EXISTING PEDESTRIAN ACCESS
 EASEMENTS.
  
 14. CAN THE MINIMUM GRADES FOR CHASE STREET BE RAISED?
 IT MAY BE SUSCEPTIBLE TO FLOODING FROM SEA LEVEL RISE
 IN THE FUTURE.
  
 15. INCLUDE ALL HATCH PATTERNS ON A SHEET IN THE SHEET
 LEGEND. FOR EXAMPLE THE HATCHING SHOWN ON TRINITY PLACE
 ON SHEET C5.06 IS NOT IN THE LEGEND.
  
 16. CURB RAMP NEEDED AT NW CORNER OF TRINITY PLACE AND
 CHASE AVE.
  
 17. STORM GRATES IN FRONT OF CURB RAMPS TO BE WHEEL
 CHAIR COMPLIANT.
  
 18. MIRROR SECTIONS AA, BB, CC TO MATCH THE ORIENTATION
 SHOWN ON THE PLAN VIEW (I.E. CROSS SECTION LOOKING
 NORTH).
  
 19. SHOW HOW PROPOSED SIDEWALK WILL TIE INTO EXISTING
 GRADES
  
 20. BE CONSISTENT IN THE LABELING OF CHASE AVE/CHASE
 ST. CROSS SECTIONS CALL OUT CHASE ROAD.
  
 21. PROVIDE FINISHED FLOOR ELEVATION OF THE BUILDINGS
 ON THE CROSS SECTIONS, IF AVAILABLE.
  
 22. PROVIDE SWALE IN LANDSCAPE AREA FOR SIDEWALK TO
 DRAIN INTO.
  
 23. PROPOSED GRADING ON THE EAST SIDE OF CHASE AVE
 SOUTH OF TRINITY ST. IS HIGHER THAN THE BACK OF
 SIDEWALK AT THE DRIVEWAY.
  
 24. CHECK DIMENSIONS SHOWN ON THE CROSS SECTIONS VERSUS
 DIMENSIONS ON THE PLAN VIEWS. PARKING STALL DIMENSION
 SHOULD NOT INCLUDE THE D-TYPE CURB.
  
 25. NEARLY 10% EP SLOPE ON THE EAST SIDE OF CHASE AVE
 APPROACHING LAKEVIEW AVE.
  
 26. NO LANDSCAPE PLANS WEST OF CHASE STREET.
  
  
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO
 ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL.
  
 1. DRAINAGE SYSTEM TO BE DESIGNED TO MEET SFWMD ERP
 CRITERIA. STORMWATER CALCULATIONS WILL BE REVIEWED WITH
 THE ENGINEERING PERMIT SUBMITTAL.
  
 2. PROVIDE COPY OF SFWMD ERP PERMIT MODIFICATION BEFORE
 START OF CONSTRUCTION.
  
 3. PROVIDE EROSION AND SEDIMENT CONTROL PLAN WITH THE
 ENGINEERING PERMIT SUBMITTAL.
  
  
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120 (O)
 561-351-0510 (M)
 [email protected]
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved